縱波分量 的英文怎麼說

中文拼音 [zōngfēnliáng]
縱波分量 英文
compressional component
  • : Ⅰ動詞1 (釋放; 放走) release; set free; let go 2 (放任; 不約束) indulge; give oneself up to; l...
  • : Ⅰ名詞1 (波浪) wave 2 [物理學] (振動傳播的過程) wave 3 (意外變化) an unexpected turn of even...
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  1. Government ' s monopoly of capital market also leaded to the " shell " value of listed company which is irrelative to the company ' s invest value, which made the higher general price in the market. in addition to, the structure of investors which is consisting of many individual investors and few institution investors lets it easy to manipulate the stock market for the institution investors. according to the origins of the systematic risk, it is necessary to improve the market mechanism and market efficiency to eliminate the system root of the risk to decrease the risks

    突出地表現在:資本市場服務于國企轉制,造成上市公司股權結構存在缺陷,致使公司治理失效,上市公司缺乏持續發展的能力,公司經營風險轉化為市場的系統性風險;政府對資本市場準入的行政性壟斷,形成上市公司「殼」價值,虛高股票市場價格,引發系統性風險;金融市場割,特別是貨幣市場資金缺乏進入資本市場的正常渠道,利率市場化水平低,影響金融資產定價,導致違規融資盛行,加大了市場風險;而由於市場監管不到位,以散戶為主的投資主體結構,則易導致機構大戶利用內幕信息操股價,機構投資者的發展不僅沒有成為穩定市場的力,反而成為操市場的主力,加劇了市場動。
  2. For processing of 3d and 3c seismic data, the reflected p - waves can be processed with the conventional methods, while the reflected converted waves can not be processed with the conventional p - wave processing methods, because their travel paths are asymmetrical, their common midpoint gathers are no longer common reflection point gathers, and their time - distance equation is non hyperbolic

    在三維三地震勘探資料處理中,對于反射資料可以採用常規方法進行處理;而對于反射轉換資料,由於其傳播路徑的非對稱性,轉換共中心道集不再是共反射點道集,轉換時距方程也不是雙曲方程,因此不能採用常規處理方法來處理轉換資料。
  3. Abstract : a new waveguide which can change the wide wall of a rectangular waveguide into a symmetric arc wall is named as a cam - rectangular waveguide. comparing to sectoral waveguide, the new waveguide has the same voltage characteristics and is easier to be produced and fixed. an approximate formula of the dominant mode fields and the normalized conductance of a longitudinal resonant slot cut in the curved wall of a cam - rectangular waveguide are given. a resonant slot linear array in c & x band is designed, in which the slot voltage distribution is equiphase and the input is matched. the input voltage stationary ware ratio and the h - plane pattern of the antenna are measured. the experimental results show the conformance with theoretical results

    文摘:把常用的矩形導一個寬面改成圓弧形構成的導稱為圓突-矩形導.這種導與扇面導相比:電性能相當;導管結構更加簡單,容易加工,便於安裝.文中給出圓突-矩形導中主模場,圓曲面上向槽歸一化諧振電導近似公式.設計了c和x導曲面向諧振縫隙線陣,縫隙電壓相位為同相佈,輸入端匹配.實際測了天線輸入端電壓駐比和h面方向圖,理論與實驗相吻合
  4. The results show that : ( l ) adoption of the intermittent mean price instead of the point price at the end of the option will help to reduce the chances of profit - making manipulated by managers and to curb the manager ' s motive to control the stock price ; ( 2 ) generally speaking, stock price of mean price option is more incentive to the managers than that of the black - scholes ; ( 3 ) when the stock market slumps at the end of the option, mean price option will ensure a moderate insurance for the managers ; ( 4 ) when stock price slumps alone with the overall situation of the stock market in the intermittent option, mean price option. however, will be inefficient as an incentive. chapter four addresses the questions concerning the manager ' s manipulation of the stock price, and the increase of the option risks because of long - term slump of the stock market

    第三部包括第三至五章,第三章針對時點價格容易被控制和時點價格的動性太大,增加了經理期權的風險等問題,研究採用期權期內的平均價格替代期權期末的時點價格計算經理股票期權收益,構建了幾何型平均價格期權定價公式,並與black ? scholes期權定價公式進行了定對比析,結果表明: ( 1 )採用期權期內平均價格替代期權期末時點價格有利於降低經理通過操股價的牟利機會,遏制經理操股價的動機; ( 2 )一般條件下,平均價格期權股票價格對經理的激勵作用優于標準期權; ( 3 )當臨近期權期末股價下跌時,平均價格期權能為經理提供適度保險; ( 4 )當期權期內,股票受大市持續走弱影響而下跌時,平均價格期權失去了激勵作用。
  5. A pressure disturbance cannot drive the energy release profile uniformly to the anti-node region to result in a sustained longitudinal wave.

    壓力擾動不可能驅使能釋放布圖移至腹區域以產生持續的
  6. This article describes a way of special ultrasonic system which monitors thermal stress in seamless welded rails. this monitoring system is a non destructive testing system, which adopts avr mcu and high - precise time chip processing as the core of it, and adopts the critically refracted longitudinal wave as the object of measuring. my studying focuses on the theory of the monitoring system, which will be listed in this arctile : according to the snell theory, the theory of motivating of critically refracted longitudinal wave is described in details, and the finite element software is used to emulate the propagating course. the formulas of calculating the pts of swr are taken from the acoustoelasticity theory, and the calculating the parameters is introduced. according to assemble materials, three kinds of ways of monitoring the pts of swr using critically refracted longitudinal wave are described, which are measuring the sound - time in changeless distance, ultrasonic critical - angle refractomery and frequency spectrum, the first way of ways is used in this experiment system. the factors, which effect the monitoring system, are assaid in some degree based

    本文的研究工作重點在無縫焊接鋼軌溫度應力測系統的理論模塊,包括根據snell原理,研究極限折射的激發機理,並使用有限元軟體ansys進行模擬;根據聲彈性理論以及公式推導出計算無縫焊接鋼軌中的溫度應力的公式,並對其中參數的求解方法進行介紹;根據收集的資料,介紹了三種使用極限折射無縫焊接鋼軌溫度應力的方法,即固定距離測聲時法、臨界角折射法和頻譜析法,本實驗系統使用的是第一種;根據實驗經驗以及相關資料,析了影響極限折射溫度應力的幾個因素,並提出了相應的解決方法;根據實驗系統的需要,獨立設計並加工出相關配套的實驗設備,包括實驗鋼塊、有機玻璃楔塊、固定件、載荷外框裝置等。
  7. ( 3 ) p and s wave velocity and dynamic & static modul of sand rock in huanhua basin are the first time measured using " mts rock physical parameter testing system under formation condition " of " state key laboratory of oil and gas reservoir geology and exploitation ". at the same time, relationship between seismic response and oil & gas is discussed and summarized

    ( 3 )利用「油氣藏地質與開發工程」國家重點實驗室mts巖石物性測試系統,首次對黃驊坳陷砂巖進行了高溫高壓下的、橫速度及動彈模的測定,對黃驊坳陷砂巖的地震響應與油氣關系進行了析和總結。
  8. The quantification indexes that token weathered degree are primary velocity, borehole rqd ( rock quality designation ), joint space, joint number and so on, and the unloading ones are primary velocity, joint opening, borehole penetrability and so on. the compartmentalization of different weathered and load - off zones according to quantification indexes tallies with the slope geo - stress computed by finite element method

    其中研究風化帶的定指標有速vp 、鉆孔rqd 、結構面間距與條數等,研究卸荷帶的定指標有速度、節理開度與鉆孔巖體透水性,據此劃的不同程度風化、卸荷巖體與有限元計算的壩區河谷應力場具有良好對應性。
  9. The characteristic parameters of effective debris in a ferrograph have been calculated in the present thesis, like area, perimeter, aspect ratio and granularity, in which some methods have been adopted such as smoothing, filtering and thresholding and so on, according to tribological theories and computer technologies and digital image preprocessing

    本論文基於摩擦學原理和計算機技術,通過對鐵譜片進行數字化圖像預處理,採用對譜片圖像的平滑、濾以及閾值二值割等方法,計算出譜片中特徵磨粒的一些特徵參,如面積、周長、粒度以及橫比等。
  10. To study the wave field characteristics of 2 - d transversely isotropic elastic random medium, we separately calculated the statistical characterizations ( horizontal center frequency, vertical center frequency and relative magnitude of the wave field energy ) in the five different time sections

    為研究橫各向同性彈性隨機介質模型中的場特徵,我們在五個不同的時間區段上,別計算剖面的三個統計特徵(橫向中心頻率、向中心頻率、場能相對值) 。
  11. To study the wave field characteristics of 2 - d viscoelastic random medium, we divide up the theoretic recording sections ( vertical component ) into two different time sectors, and separately calculated and extracted the three statistical characteristics ( horizontal center frequency, vertical center frequency and relative magnitude of the wave field energy ) in the two different time sectors

    為研究粘彈性隨機介質模型中的場特徵,我們在理論記錄(垂直)剖面上選取兩個時間區段;在這兩個不同的時間區段上,別計算剖面的三個統計特徵(橫向中心頻率、向中心頻率、場能相對值) 。
  12. The improved algorithm has three steps : 1 ) estimating the statics ; 2 ) selecting the best coherent time window from the common - receiver - point stack profile for the coherent computation and calculating the statics ; 3 ) correcting the value of " statics " by the underground structures corresponding to the formation of the p waves

    演算法可以3步進行:估算靜校正;在共接收點疊加剖面上選擇一個最優相千時窗進行相干運算,求取靜校正;根據對應層位的地下構造對相於結果進行校正。
  13. Particularly an analytical expression for the longitudinal momentum distribution is derived if the density distribution of halo nucleons is assumed as a gaussian type function. a direct connection of the width of the momentum distribution to the bound state wave function of halo nucleons is established

    特別是在暈核子的向和橫向密度佈可離的情況下,如高斯密度佈,進一步求解了向動佈寬度的解析形式,建立了佈寬度與暈核子束縛態函數之間的直接聯系。
  14. Application of wavelet transform to improving the vertical resolution of logging while drilling wave propagation resistivity

    應用小析改善隨鉆電阻率測向解析度
  15. In order to study the influential factors on seismic attribute, the authors use the rock modeling software to simulate the changes of mineral constituent, porosity, fluid property and saturation of rocks and further study the changes of the seismic attribute basing on the velocity of s - wave, the velocity of p - wave and various elastic modeling quantities of the rocks by means of forward modeling

    摘要為了研究影響地震屬性的因素、應用巖石建模軟體模擬巖石的礦物組、孔隙度、所含流體性質以及飽和度等變化,對其速度、各種彈性模的變化情況通過正演的手段得到了解。
  16. In fact, scaling technology is an essential component in many image / video processing such as to magnify / minify still image, to achieve special effect like picture - in - picture, to compress or transform digital video with spatial scalability etc. in this thesis we mainly employ this technology in video transcoding, which is a powerful but computationally intensive tools to convert one kind of video format into another, meeting different demand such as lower bitrates or various display terminals. in sum, there are two kinds of scaling schemes : one is in spatial domain and the other in transform domain. the scheme in transform domain can provide very good performance, that is, efficient computation and desirable image quality, whereas it has some disadvantage which is impossible or hardly to o vercome, especially some scenarios require arbitrary ratio zoom in horizontal and vertical, and excellent visual effect

    兩種方法都各有其利弊:變換域的方法是利用現有常用的視頻壓縮方案都是基於dct這個特點,所以可以直接在變換域做處理,這樣可以節省大的計算,但其缺點是由於dct是基於塊的變換,如8 8 ,所以很難找到一種方案可以進行任意比例的縮放,尤其是在橫縮放比例不一致的情形,但這對諸如hd縮放到sd和空域級的壓縮方案來說尤為重要,基於空域濾的方法卻沒有這樣的限制,同時可以保證縮放后的圖像的質遠高於基於變換域的方法,為了達到高的縮放質,就不可避免導致計算過大。
  17. Based on the solutions proposed herein, the longitudinal vibration properties of an integral pile in a uniform soil or layered soil, a pile with variable sections or variable modulus in a uniform soil are discussed respectively. the influence on the curves of complex stiffness, mobility and reflection wave of pile caused by soil modulus, the degree of pile defects, and the length and location of pile defects are emphatically discussed. 3

    利用所得解別對均質土中完整樁、成層土中完整樁、均質土中變截面樁和均質土中變模樁的向振動特性進行了析,重點討論了土層模變化、樁身缺陷程度、缺陷段位置、缺陷段長度等因素對樁頂復剛度、速度導納和反射曲線的影響。
  18. According to the test results from 18mm - thick - steel plate adhering to concrete, gas and oil, the obvious differences in the attenuation coefficient and number of bottom waves are found. the test results shows that it is feasible to adopt ultrasonic longitudinal wave reflection method to test the bonding quality of the steel and

    採用超聲反射法單面檢測鋼-混凝土的粘結質是可行的,採用底衰減系數和底面反射的個數作為判定鋼-混凝土的粘結質依據是有效的,所採用的理論析模型是正確的。
  19. Three - component ( 3c ) seismic survey with p - wave source and 3c geophones has drawn much attention for its great success in identification of lithologies, fractures, and fluids

    摘要震源激發、三器接收的三地震勘探,因在巖性、裂隙和流體識別等方面獲得成功,而備受關注。
  20. In this paper, the reflection method of ultrasonic longitudinal wave and that of ultrasonic shear wave to test the bonding quality of the adhesive interface between steel and concrete from single - surface is adopted respectively

    因此,找到一種合理的無損檢測方法來判斷鋼-混凝土粘結質具有重要的工程意義和實用價值。本文別採用超聲和橫反射的方法來單面檢測鋼-混凝土界面粘結質
分享友人