總作用弧 的英文怎麼說

中文拼音 [zǒngzuòyòng]
總作用弧 英文
total arc of transmission
  • : Ⅰ動詞(總括; 匯集) assemble; gather; put together; sum up Ⅱ形容詞1 (全部的; 全面的) general; o...
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  • : 名詞1. [數學] (圓周的任意一段) arc2. (古代指弓) bow
  1. The qiongzhong and danxian batholiths, as the largest early mesozoic syntectonic granite intrusions in hainan island, are mainly composed of porphyritic biotite two - feldspars granitoids, in which alkali - feldspar phenocrysts and dark minerals are foliated mostly in we - direction. the granites are of metaluminous i - type. major and trace elements show co - variations with sio2, suggesting the fractional crystallization of plagioclase, hornblende, apatite and ti - fe oxides in the evolution of the granites

    花崗巖的主量元素和部分微量元素成分與sio _ 2呈良好的相關關系,顯示出明顯的斜長石、角閃石、磷灰石和ti - fe氧化物等的分離結晶體上它們與大陸島花崗巖的微量元素豐度和分佈特徵相似,系統地虧損ba 、 nb 、 sr 、 p和ti等元素。
  2. In the link party of qinling - qiliang - kunlun belt, the polyarc - basin systemic characteristic is discussed with strengthen and standout study on the detail relationship analysis between the arc - basin. the bayan har basin thought to be the preexistence of the songpan - garze belt, is a back - arc basin among a series of polyarc - basin systems behind the qiangtang - taniantawong front the arc beginning in the late paleozoic. the eastern margin started as the western passive continental margin of the yangtze block ( d - t2 ), then changed into a foreland basin related to the north china block and the qiangtang block during the middle to late triassic

    在秦祁昆侖結合部研究中,加強和突出了精細的島盆分析和造山關系的研究,探討了秦、祁、昆結合部多島盆特徵;通過巴顏喀拉地區沉積特徵,沉積體的空間展布和形態,面式物源供給方式,礦物成分和地球化學背景分析,其沉積盆地屬性體上反映出一個從過渡地殼-洋殼基礎上發育起來的周緣前陸盆地的發展和演化過程。
  3. Based on whole design, this essay adopts gps technology to make the key component in taximeter - orientation module, compiles corresponding software, and makes adjustment and experiment. also it has done a profound research in district - identification arithmetic, that is improved radian arithmetic, and it is verified by matlab. we adopt anti - interference measures in both hardware and software to ensure communication reliability and working stability

    在確定體設計方案的基礎上,本文採gps技術研製具有區域識別功能出租車計價器中的關鍵部件? ?定位模塊,編制了相應的運行軟體,並進行了調試和試運行試驗;對區域識別演算法進行了深入研究,提出了區域識別的演算法?改進長法,並運matlab軟體進行了演算法驗證;為了保證通信的可靠性和工的穩定性,從軟、硬體兩個方面採取了抗干擾措施。
  4. Carbon nanotubes were produced in an electric arc discharge with an anode composed of carbon. the productions were studied in different current, voltage, helium pressure and diameter of anode and cathode sticks. oxygen and steam in helium were discussed. the proper condition of producing carbon nanotubes is included to make purification easy. 2figs., 2tabs., 6refs

    石墨電法制備碳納米管,研究了不同電流、電壓、氦氣壓力以及不同陰陽極棒徑條件下碳納米管的生成情況,並討論了氧氣和水蒸氣的存在對碳納米管制備的影響,結出制備碳納米管的條件,給以後的純化工帶來方便.圖2 ,表2 ,參6
  5. With the help of this program, this paper does research on the moved backwards of the slide surface, lengthening the anchor section, the soil nail ' s total force, gets conclusion about relations between the soil nail ' s length and the slope ' s grade, height, soil ' s mechanical parameter ; relations between soil nail ' s total force and coulomb soil pressure. with the help of the large multiuse finite element program ansys, this paper analyzes the soil nailing in one - step ' s slopes, in two - steps " slopes, puts the emphasis on the axis force ' s distributing along the soil nail at each rows, the effect of both the excavating mode and the original slope figure to the axis force of the soil nail, the one another effect between the upper - step slope and the nether - step slope in the soil nail ' s axis force, gets conclusion about the design of soil nail at the first low, different slope body is the same with different excavating mode, the original slope figure has more effect to some than others because of the slope body, the reasonably design of the step width in two - steps slopes, the two - steps excavating and retaining has more virtue than the one - step ' s. through soil pressure analysis this paper does research on the differences and the links between the coulomb soil pressure theory and the rankin ' s, the vertical pressure at the slope surface when the slope surface is inclined and the retaining wall is rough, the soil pressure ' s distributing behind the panel, gets conclusion about the effect of both the slope body inner stability and the slope surface local stability to the soil pressure

    通過分析比較,論證了對數螺旋線型比圓為邊坡的假設滑裂面具有較多的工程優點,並為此編制了一個採極限平衡法分析土釘支護的fortran語言程序,以此工具對滑裂面的后移、土釘錨固段的超長、土釘力的大小等方面了研究,得出了有關土釘的長度與邊坡的坡角、坡高、土體力學參數的關系、土釘力與庫侖土壓力間的關系等結論;採大型通有限元數值分析程序ansys分別對採土釘支護的一階邊坡、二階邊坡進行分析,重點是研究各排土釘的軸力分佈規律、開挖方式及原始邊坡形態對土釘的軸力的影響、上下階邊坡在土釘軸力方面的相互,得出了有關第一排土釘的設計問題、不同類型的土體應適於特定的開挖方式、原始開挖出的邊坡形態對一些類型坡體的邊坡土釘支護有較大的影響而對另外一些影響不大、二階邊坡臺階寬度的合理確定、二階開挖及支護比一階時具有較多的工程優點等結論;通過土壓力分析對朗肯、庫侖兩種經典土壓力理論的區別與聯系、坡面傾斜及墻背有摩擦時的坡面豎向應力分佈、面板背土壓力的分佈形態了研究,得出了邊坡支擋土壓力受坡體內部穩定與坡面局部穩定兩個方面的影響、土釘支護面板背土體中卸荷拱的存在對面板受力有利等結論。
  6. The seismic response is analyzed with total stress method ; and it ' s found that the positions of the most dangerous slide surfaces are fairly stable though the precision for searching is very high. the idea of newmark method is induced to calculate permanent deformation on circular sliding surfaces. the precision is increased and the complexity of searching is lessened

    本文採應力法分析了填埋場在地震下的動力響應,通過計算發現,在滑搜索的精度相當高的情況下,最危險滑的位置仍然比較固定;在這一發現的基礎上,引入newmark地震永久變形的思想,並將其運於圓形滑動面從而提高了該方法的精度並減少了試算的繁復性。
  7. Total arc of transmission

    總作用弧
  8. To investigate effect of plenum chamber total pressure on arcjet thruster operation, numerical simulation of operation under various plenum chamber total pressures was performed on the basis of mechanism analysis on its operation and modeling for chemical non - equilibrium flow and steady state electromagnetic field within it

    摘要為了研究集氣腔壓對電噴射推力器工過程的影響,在分析其工機理的基礎上採化學非平衡流動和穩態電磁流體電磁場模型對不同集氣腔壓下推力器工過程進行了數值模擬。
分享友人