耐火構件 的英文怎麼說

中文拼音 [nàihuǒgòujiàn]
耐火構件 英文
fire retarding component
  • : 動詞(受得住; 禁得起) be able to bear or endure
  • : fire
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • : Ⅰ量詞(用於個體事物) piece; article; item Ⅱ名詞1. (指可以一一計算的事物) 2. (文件) letter; correspondence; paper; document
  1. Fire resistance tests for loadbearing elements - columns

    承重試驗.柱子
  2. Fire resistance tests for loadbearing elements - beams

    承重試驗.橫梁
  3. The product of electric furnace fittings including : micro - computer program temperature control instrument 、 refractory brick ( ultra - light weight energy saving brick ) 、 resistance wire 、 electroheat belts 、 electrical heat tube 、 silicon carbide rod 、 furnace bottom plate 、 muffle tank 、 vacuum sealed fan 、 wind wheel 、 axis 、 substructure 、 bin seat 、 flat shape plate 、 box 、 panel 、 weatherstrip plate 、 return air plate 、 bin 、 connection box 、 educe rod 、 thermocouple 、 thyristor 、 porcelain pipe 、 crucible 、 furnace chamber 、 furnace frame 、 charging bin 、 substructure 、 pit furnace cover lifter framework ( sole design ) and otherwise

    電爐配產品包括:微電腦程序控溫儀、磚(超輕質節能磚) 、電阻絲、電阻帶、電熱管、硅碳棒、爐底板、馬弗罐、真空密封風機、風葉、軸、底座、料筐座、扁形板、箱體、面板、擋風板、回風板、料筐、爐柵、接線盒、引出棒、熱電偶、可控硅、瓷管、坩堝、爐膛、爐門、爐框、裝料筐、底座、井式爐蓋升降機(獨家設計)等。
  4. Fire resisting construction and compartmentation in common parts

    公用地方范圍內的耐火構件及隔
  5. The main factors including concrete cover and prestressing levels which may have influence on the fire resistance of the simply - supported slabs are examined. the deflection and prestress are presented. from the results of tests, the fire endurance of the simply - supported slabs are given

    在簡支板的災行為試驗研究中主要考慮了普通鋼筋的保護層厚度和預應力度兩個因素,主要測試了的撓度變化及預應力的變化,並由此得出了其極限。
  6. Fire behaviour of building materials and elements " brandschacht

    建築材料和燃性.防豎井
  7. Method of fire resistance test for structural parts of buildings

    建築物結試驗方法
  8. Fire resistance tests for non - loadbearing elements - walls

    非承重試驗.墻
  9. Fire - resistance tests - elements of building construction

    建築試驗方法
  10. In general, fireproof design is considered by architects not by structure engineers. after fire, we compare the fireproof time of the component with the fireproof limit supplied by standards to design

    在進行建築設計時,防問題一般由建築師考慮,結工程師考慮的問題不多;發生災后,通過比較試驗測得的時間與規范所給極限來進行設計。
  11. Such parameters as in - service function, construction technique, construction speed, earthquake resistance behaviour and fire resistance behaviour were analyzed, the results showed that rpc filled in steel tube columns had advantages over other columns in the respects. from the economical analysis of different columns supporting similar loading, it can be seen that the material price of rpc filled in steel tube columns was the lowest. considering outstanding durability of rpc material, the macro - price of rpc filled in steel tube columns should be the lowest and the economical benefit should be the best

    通過對鋼管活性粉末混凝土柱的建築使用功能、施工工藝、施工速度、抗震性能、性能等眾多指標的分析以及在承受相同荷載條下鋼管活性粉末混凝土和不同強度的鋼管混凝土、鋼筋混凝土、鋼柱的材料造價的比較,可以看出,鋼管活性粉末混凝土的局部造價是最低的,結合rpc材料優異的久性能,可以認為該組合結的材料造價是最低的,具有極好的經濟效益。
  12. 1902 - 704 methods of testing refractory materials - unshaped refractories used in monolithic construction - preparation of test pieces from insulating castables method 1902 - 704

    材料試驗方法.第7部分:整體結用未成形材料.第4節:隔離澆注試制備
  13. 1902 - 703 methods of testing refractory materials - unshaped refractories used in monolithic construction - preparation of test pieces from dense castables by vibration method 1902 - 703

    材料試驗方法.第7部分:整體結用未成形材料.第3節:振動密實澆注試制備
  14. 1902 - 705 methods of testing refractory materials - unshaped refractories used in monolithic construction - preparation of test pieces from mouldables and ramming mixes method 1902 - 705

    材料試驗方法.第7部分:整體結用未成形材料.第5節:可塑和夯築混合試制備
  15. For most of the elements of the structure, we have a range of one to four hours depending on the use and size of the building, unit or compartment

    就大部分的結而言,視乎樓宇單位或隔間的用途和體積,我們會規定時效須達1至4小時不等。
  16. B we require the structural elements of a building to meet performance standards which are capable of resisting the effects of fire for a specific period of time according to the use and size of the building

    二我們規定樓宇的結必須符合性能標準,以便發揮作用。時間視乎樓宇的用途及體積而定。
  17. We require the structural elements of a building to meet performance standards which are capable of resisting the effects of fire for a specific period of time according to the use and size of the building

    (二)我們規定樓宇的結必須符合性能標準,以便發揮作用,時間視乎樓宇的用途及體積而定。
  18. After the analysis about main body members, the paper analyzes the steel ' s fireproof, especially discusses the increasing of fire resistance time because of the existence of core concrete. further more, the paper particular argues the erode - proof on steel architecture

    在進行完主體分析后,接著對鋼結的防進行了分析,尤其探討了鋼管混凝土柱因為核心混凝土的存在而導致時間的增加;另外,對鋼結防腐也進行了詳細的論述。
  19. Fire behaviour of building materials and elements ; fire resistant glazing ; concepts, requirements and testing

    建築材料和燃性能.玻璃窗.概念要求和
  20. Fire resisting element and assembly of building

    建築
分享友人