耗餘成本 的英文怎麼說

中文拼音 [hàochéngběn]
耗餘成本 英文
depleted cost
  • : Ⅰ動1 (減損; 消耗) consume; cost 2 [方言] (拖延) waste time; dawdle Ⅱ名詞1 (壞的音信或消息) ...
  • : Ⅰ同「余」Ⅰ-Ⅳ1. Ⅱ名詞(姓氏) a surname
  • : Ⅰ動詞1 (完成; 成功) accomplish; succeed 2 (成為; 變為) become; turn into 3 (成全) help comp...
  • : i 名詞1 (草木的莖或根)stem or root of plants 2 (事物的根源)foundation; origin; basis 3 (本錢...
  1. For the backbone nodes, high - capacity dacs4 - 4 - 1 cross connect equipment with stm - 1s as its basic interfaces is used. between the various equipment, stm - 1 connections are directly used instead of tens of 2 mbits connections so that large amounts of hw equipment, power consumption, connecting lines between shelves and fault rate can be reduced, while network redundancy can be improved

    骨幹節點採用以stm 1為基介面的大容量dacs4 - 4 - 1交叉機。各種設備之間直接使用stm - 1連接,不再使用幾十個2mbits連接,可以大大減少設備硬體數量,降低電源消,機架之間連接線顯著減少,降低故障發生率,提高網路冗度,也可以降低建設和維護
  2. The vertical structure optimization through simulation of the new structure, low loss igbt ( lpl - igbt ) has been discussed in detail in this paper. in comparison with the prevalent igbt, lpl - igbt has not only the merit of transparent back emitter and high lifetime of carriers owned by npt - igbt but also the complex n7n + voltage sustain layer structure owned by pt - igbt. not only possesses lpl - igbt lower power loss but also the other capacities are no better than npt - igbt such as break down voltage, current capacities, safe operation area and cost

    與現有igbt相比較, lpl - igbt在結構上保留了npt - igbt中的透明發射區和高載流子壽命的質優點,同時又具有pt - igbt中n ~ - n ~ +復合薄耐壓層的優點;在器件性能上, lpl - igbt不僅具有比npt - igbt更低的能量損(包括通態損和開關損) ,而且其性能如器件耐壓、電流密度、安全工作區以及製造等相對現有npt - igbt均有明顯改善。
  3. We call it : low power loss igbt - - - - - - lpl - igbt. experimenal results and simulation results have shown that this new structure provides a better performance than that of the conventional npt structure. its power loss is lower than npt - igbt and other parameters are the same as those of npt - igbt

    它的總損(通態損與開關損之和)低於現有npt - igbt ,而其性能(耐壓、電流密度、安全工作區、抗過流、過壓能力等)和製造與現有npt - igbt相同。
  4. You can also use the earned value table to forecast whether the task will finish under budget or over budget based on the cost incurred while the task is in progress

    還可以基於任務進行過程中所消,利用「盈分析」表來預測任務是否能在預算內完或超出預算。
分享友人