聯機預報 的英文怎麼說

中文拼音 [liánbào]
聯機預報 英文
on-line forecasting
  • : Ⅰ動詞(聯結; 聯合) unite; join Ⅱ名詞(對聯) antithetical couplet
  • : machineengine
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ動詞1 (告知; 報告) report; declare; announce 2 (回答) reply; respond; reciprocate 3 (答謝)...
  • 預報 : [訊] forecast; forecasting; prediction
  1. At first, this paper analyzes the factors of water - sand influencing water level of yellow river and the feasibility just using the factors of water - sand to study water level, and collects the corresponding data ; secondly, because there are strong nonlinear relation in the corresponding data, by meticulous theory analysis, this paper integrates basic nonlinear analysis method, theory of random analysis, method of least squares and so on. it puts forward a method which can get the high accuracy simulation of the data, perfects the multi - factor analysis of variable ( over three factors ) of the statistic ; thirdly, it applies the method to the approximation of corresponding water level process which belong to the capacity of sand of middle - high and middle - low, and get the high - accuracy simulation about the typical nonlinear relation ; at last, this paper definitudes the main influence mode that the capacity of sand. it mainly unite with other factors to work on the water level in the yellow river lower reaches ; mor eover, this paper analyzes the difficult point and the direction of improvement to realize the accuracy forecasting of the flood level of erodible - bed channel

    首先,系統分析了影響黃河水位的水沙因素,及僅用水沙因素有效研究水位的可行性,並按變量對應思想採集它們的相應數據;其次,由於相應水位過程數據中含極強的非線性關系,本論文經細致的理論分析,將基本的非線性分析方法、統計建模方法、隨分析理論、最小均方誤差原則等等數學理論及方法有揉合,提出了能有效實現這類數據高精度擬合的分層篩選法,並改進了統計學中多因子(三個以上)方差分析法;再次,將這一方法用於黃河中高及中低含沙類洪水相應水位過程的擬合,實現了這一典型非線性關系的高精度擬合,各年汛期上下游相應洪水位過程的擬合誤差都較小;最後,明確黃河下游含沙量對水位的主要影響方式,即含沙量主要是與其它因素合對水位作用;另外分析了要實現變動河床洪水位過程準確的困難所在及改進方向。
  2. Based on consider hereinbefore, this dissertation discusses several aspects on the problem of the sustainable and optimum exploitation of groundwater resources as follows : ( 1 ) reviewed entirely the origin and evolvement of the concept " sustainable development ", stated and commented the study status in queue on " sustainable development " around national and international range, thorough discussed the science connotation about the concept " sustainable development " ; ( 2 ) looked back and commented across - the aboard some furthest basic concept and proposition related to groundwater resources, put forward self opinions on a few existent mistake points of view and chaos understandings ; ( 3 ) expatiated entirely on the content and meaning of the theory of changeable groundwater resources system, contrast with the traditional methods of groundwater resources calculation and evaluation, combined example to show the application of this theory ; ( 4 ) thorough analyzed the difficult and complexity to forecast the groundwater resources, fully stated the traditional methods of groundwater resources forecasting, pointed out the characteristic and applying condition of these forecasting method, introduced the main ideas and methods of wavelet analysis developed recently, and the matlab software be known as the fifths era computer language, and its accessory wavelet analysis toolbox, applied these methods and tools to analyze the groundwater dynamic curve, adopted the b - j method and morte - carlo method, combined with the theory of changeable groundwater resources system, discussed the new view on the forecast of groundwater resources ; ( 5 ) synthetically analyzed the characteristics and limitations of the present all kind of groundwater manage model, combined mathematical programming mathematical statistics random process and the theory of variation system of groundwater resources on the unite optimum attempter of surface water and groundwater, emphasized how to make the model more nicety, more simple, more practicality ; ( 6 ) analyzed the inside condition and outside condition to assure the sustainable and optimum exploi tation of groundwater resources, the inside conditions are the follows : correct resources idea, scientific methods of resources calculation and evaluation, credible forecast methods of resources, exercisable measures of resources management, the outside conditions are the follows : the development idea of high layer, the transform of manage system, the matched policy and rule of law, the adjusted of economy lever, the improve of cultural diathesis, the boosting up of water - saving consciousness and detail measures, the control of population rising, the prevention and cure of water pollute, the renew and rebuild of ecology ; ( 7 ) scan the sustainable and optimum exploitation of groundwater resources from the high level of metagalaxy, earth system science, and philosophy ; lint out the more directions on groundwater resources

    基於以上考慮,論文主要從以下幾方面對地下水資源可持續開發問題進行了比較深入的探討:全面回顧了「可持續發展」概念的由來與演變,對國內外「可持續發展」的研究現狀進行了述評,並對「可持續發展」概念的科學內涵進行了深入探討;對涉及地下水資源的一些最基本的概念和命題進行了全面的回顧和評述,對目前仍然存在的一些錯誤觀點和混亂認識提出了自己的見解;全面闡述了地下水資源變值系統理論的內容和意義,並與傳統的地下水資源計算評價方法進行了對比分析,結合實例具體說明了方法的應用;深入分析了地下水資源工作的極端重要性和復雜性,對傳統的地下水資源動態測方法進行了全面的評述,指出了各類方法的特點及適用條件,對最近二十多年剛發展起來的小波分析技術的主要思想和方法及其應用范圍,以及號稱第五代計算語言的matlab軟體和附帶的小波分析工具箱進行了介紹,並應用於地下水動態過程線的分析,採用時間序列中的b ? j法,蒙特卡羅方法,與地下水資源變值系統理論相結合,探討了地下水動態資料分析和地下水資源的新思路;綜合分析了現今各類地下水管理模型的特點及缺陷,將數學規劃、數理統計、隨過程等與地下水變值系統理論相結合進行地表水地下水或多水源的合優化調度,使模型更準確、更實用;對保證地下水資源可持續開發的內部條件和外部條件進行了分析,內部河海人學博卜學位論文前言、摘要、目錄條件主要是正確的資源觀,科學的資源計算與評價方法,可靠的資源技術,可操作的資源管理措施,外部條件主要是高層發展思路、管理體制的變革、配套的政策法規、經濟杠桿的調節、人文素質的提高、節水意識的增強及具體節水措施、人口增長的控制、水體污染的防治、生態的恢復和重建等;從宇宙科學、地球系統科學及哲學的高度審視地下水資源的可持續開發;指出了地下水資源可持續開發的進一步研究方向。
  3. Equipped with electronic controller fini tronic and preset for remote control for two or more compressors. it offers working pressure and oil mist separator tank inner pressure indication, separator filter clogging lashing alarm before overpressure e - stop, electric motor temperature control, maximum screw assembly temperature control, air temperature on pressure end indication, electric motor direction of rotation check, time to scheduled maintenance term, total operating hours and operating hours under load, alarm log of last five failure events

    設為丙臺以上空壓遠程控制,有工作壓力和油氣分離器罐內壓指示,分離器過濾器阻塞警,電溫控,螺桿總成溫控,壓力端空氣溫度指示,電轉向檢查,維護周期油,油過濾器,空氣過濾器,分離器過濾器,總運行時間和負載運行時間,記錄上五個警故障等。
  4. It offers working pressure and oil mist separator tank inner pressure indication, separator filter clogging flashing alarm before overpressure e - stop, electric motor temperature control, maximum screw assembly temperature control, air temperature on pressure and indication, electric motor direction of rotation check, time to scheduled maintenance term, total operating hours and operating hours under load, alarm log of last five failure events

    設為丙臺以上空壓遠程控制可檢測包括操作壓力油氣分離器罐內壓,電溫度和轉向,螺桿總成溫度過濾器堵塞警等參數,並可顯示總運行時間和負載運行時間。
  5. Foreign direct investment ( fdi ) will continue to grow over the short and medium term, fdi experts, transnational corporations ( tncs ) and investment promotion agencies ( ipas ) predict in unctad s global investment prospects assessment ( gipa )

    合國貿易和發展會議的全球投資展望評價告里,外國直接投資專家,跨國公司和投資促進構都測在未來中、短期內,外國直接投資將持續增長。
  6. Once has the bandits and thieves to intrude guards against the place, the detector launches the wireless coded signal immediately, the networking center number which installs when is apart from defense area 150 meter within the main engine to send out the police whistle sound to report to the police immediately, reports to the police dials to establish in advance or reports to the police the telephone, the handset number, answers in the police telephone to return puts user pre - record to report to the police the pronunciation, long - distance reports to the police, simultaneously comes the real - time transmission through the internet to deploy troops for defense, to withdraw from a defended position, to report to the police and so on the condition, inquires the historic record through the computer network

    該系統還採用美國進口原裝晶元與先進的無線數字高頻技術微電腦cpu控制器主組成。在防範地點安裝好主后,並設置在布防狀態。一旦有盜賊闖入防範地點,探測器立刻發射無線編碼信號,安裝在距防區150米以內的主立即發出警笛聲警,警時撥打先設定的網中心號碼或警電話手號碼,接警電話里回放用戶錄的警語音,遠程警,同時通過網際網路來實時傳遞布防撤防警等狀態,通過電腦網路來查詢歷史記錄。
  7. The main results of this paper are as follows : ( 1 ) the operation chart for individual and associated operation of new and old units, is plotted by using series of multiyears flows and the associated charts is advised to direct the reservoir operation. ( 2 ) on the basis of analysis on the characteristics of hydro - information observation system and flood forecasting system, some key problems in flood operation such as dispatching period of time, decision - making method and so on are studied. ( 3 ) the study and development of flood - dispatching simulation model

    論文取得的研究成果如下: ( 1 )採用長系列徑流資料,繪制了新老組單獨運行和合運行調度圖,通過對比分析,建議採用合運行調度圖來指導水庫運行; ( 2 )在對石泉水庫水情測系統和洪水系統的特點進行分析的基礎上,研究了洪水調度中的幾個關鍵問題,如調度時段、決策方法等; ( 3 )洪水調度模擬模型研究與開發。
  8. It stresses on the proposition that improve financial report of listed company in our country. the extended substance of report mainly includes information of derivative financial instrument, manpower resources, financial forecasting and social responsibility. there are three new ways of releasing report, different report, electronic timely report and mutual report

    財務告內容的拓展主要包括衍生金融工具、人力資源、財務測和社會責任信息的披露;財務告方式的創新主要包括差別告、電子實時告和互動式按需告三種告方式;財務告體系的完善主要包括自願披露系統性分析告、全面收益表和增值表。
  9. In the subsystem of casting quality data management and analysis, there are the listed menu, various tool bars and the united help, the system which established the classified control database of the nine kinds of the casting quality data, is quick and correct to add, query, edit and delete data. used the graph tools such as the column graph, it can display audio - visually the results of the data ' s classification and analysis. it can produce quickly and easily the various kinds of reports

    鑄件質量數據分析與測子系統採用visualfoxpro6 . 0軟體開發,系統採用了下拉式菜單和靈活多變的工具條,以及幫助;建立了九類鑄件質量數據分類管理的數據庫,能快速、準確地進行添加、查詢、修改和刪除數據;利用柱形圖等圖形工具直觀地顯示數據統計分析的結果;還能夠快速、方便地生成各類不同格式的表。
  10. After analyzing and integrating several typical accidents in coal mine by this theory, the mechanism of accident " s occurrence, development and ending is further recognized, and several critical state points related with accident are obtained, by which the accident could be predicted and forecasted

    通過用此理論,對煤礦幾類典型的事故分析和綜合,進一步認識事故發生、發展以及結束的理,獲得與事故密切系的幾個關鍵狀態點,由這些狀態點可以測、事故。
  11. And some key technologies, such as object oriented analysis ( ooa ), object oriented design ( ood ), com and activex technology, system online help, correspondingly, are discussed in detail respectively. then, the landslide prediction system based on gis is perfectly designed. afterwards, the file management subsystem, the prediction subsystem and the database management subsystem, which are divided from the only parent - system ( the landslide prediction system based on gis ), are designed and programmed in detail respectively

    詳細探討了面向對象分析( ooa ) 、面向對象設計( ood ) 、系統組件化、 active 、幫助、系統集成等重要技術環節;實現了基於gis滑坡系統的總體設計;然後討論了文件管理、和滑坡體數據倉庫管理三個子系統的詳細設計與具體實現;基於mapgis二次開發平臺,編程實現了滑坡系統。
  12. Article 28 competent meteorological departments at all levels shall make arrangements for joint monitoring and forecast of significant weather events among regions or departments, propose timely measures for preventing meteorological disasters and make assessment of severe weather disasters, which shall serve as the decision making basis for the people ' s governments at the corresponding levels to arrange prevention of meteorological disasters

    第二十八條各級氣象主管構應當組織對重大災害性天氣的跨地區、跨部門的合監測、工作,及時提出氣象災害防禦措施,並對重大氣象災害作出評估,為本級人民政府組織防禦氣象災害提供決策依據。
分享友人