腳手架用鋼管 的英文怎麼說
中文拼音 [jiǎoshǒujiàyònggāngguǎn]
腳手架用鋼管
英文
scaffolding tube- 腳 : 腳名詞1 (人或動物的腿的下端 接觸地面的部分) foot; [兒語] footsie; footsy 2 (東西的最下部) bas...
- 手 : Ⅰ名詞1 (人體上肢前端能拿東西的部分) hand 2 (擅長某種技能的人或做某種事的人) a person doing or...
- 架 : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
- 用 : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
- 鋼 : 鋼名詞(鐵和碳的合金) steel
- 管 : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
- 鋼管 : steel pipe; steel piping; steel tube; steel tubing
-
( 2 ) the paper uses two methods to analyse the falsework structure and then get the basic data to guide the construction and installation of the falsework in sliding construction. these data play an important role in practice
( 2 )基於扣件式鋼管腳手架設計規范、鋼框架格構柱兩種方法對胎架結構受力進行分析,進而得出能指導滑移施工中胎架的構造及搭設的基本數據,其結果對工程實踐有重要的指導作用。Analysis the force on the falsework by comparison to three calculation methods, referring the designing standard steel tube scaffold of buckling element, lattice column of steel frame and the computer program of sap2000. the result provides strong guidance for practicing it
基於扣件式鋼管腳手架設計規范、鋼框架格構柱及sap2000程序等三種方法對胎架結構受力進行分析、比較,其結果對工程實踐有重要的指導作用。Aiming at the popularization and application of the new - typed scaffold and frame together with the problems of the general concern, the author expounds 8 suggestions. for example, the use of the plywood formwork and the steel - lined formwork should be the developmental direction of the formwork technology of our country ; the development of the high quality plywood formwork and the adoption of the low - alloyed steel tube scaffold will substitute usual ones ; the supervision and the management of the new production must be strengthened gradually, etc
針對我國新型模板和腳手架推廣應用過程中,大家關心的問題,闡明了膠合板模板和鋼框膠合板模板應是模板技術的發展方向、開發高質量的竹膠合板模板、採用低合金鋼管腳手架逐步取代普碳鋼管勢在必行及加強產品質量監督和管理等8點意見。Couplers, spigot pins and baseplates for use in falsework and scaffolds - part 1 : couplers for tubes - requirements and test procedures
腳手架和支承架用聯結件中心螺栓和踏板.第1部分:鋼管用聯結件.要求和試驗規程Loose steel tubes for tube and coupler scaffold - technical delivery conditions
管和連接腳手架用活動鋼管.技術交貨條件Loose steel tubes for tube and coupler scaffolds - technical delivery conditions
管及聯結腳手架用空心鋼管.交貨技術條件Construction layer top will use scaffolding steel pile to pull in and out side scaffolding
3施工層頂端用腳手架鋼管拉結內外腳手架。分享友人