腹中板 的英文怎麼說

中文拼音 [zhōngbǎn]
腹中板 英文
median ventral septum
  • : 名詞1 (軀乾的一部分) abdomen; belly; stomach 2 (鼎、瓶子等器物的中空而凸出處) empty and protr...
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  1. Small rectangular backup bars were used to fabricate the web-bottom flange connection.

    與下翼緣的施焊使用小矩形擋
  2. In addition to, the fatigue crack between web and upper flange of welded steel crane beam on heavy duty service was discussed, and based on long - term observation and research, the author classified fatigue crack into bearing type and middle type crack along the horizontal direction. the causation, distributive law and mechanism of the crack were analyzed, and the precautions to take and the measures to remedy crack were presented. the main defacts including damage, crack, erosion and aging in structures, especially in concrete structure were introduced ; the defact mechanism was analyzed and the precautions to take were also given

    另外,作者對重級工作制焊接鋼吊車梁與上翼緣連接焊縫的縱向水平疲勞裂縫進行了長期的觀察和研究,根據疲勞裂縫產生的不同機理,將其分為支點裂縫和肋間裂縫,並討論了兩類裂縫產生的原因、分佈規律、機理以及防治的措施;對工程經常遇到的結構構件,尤其混凝土構件的幾種主要病害(損傷、裂縫、腐蝕與老化)進行了機理分析並提出了防治措施。
  3. The forces that developed from the deformation in the cross-frame were primarily transmitted from the connection plate into the web by the upper pair of intermittent fillet welds.

    因橫向框架的變形所發生的力最初由連接通過較上面的一對間斷貼角縫傳入
  4. Cracks have been found in the flange and web splices at groove welds in at least four bridges.

    至少在四座橋梁的翼緣拼接坡口焊縫發現了裂紋。
  5. In light of the elastic thin plate theory, the author induced equilibrium differential equation of bi - direction cellular slab, which was proved correct through analysis and comparison to result of ansys to with theoretical calculation. through the deflection and bending moment coefficient calculation of bi - direction cellular slab under various boundary conditions, the author brought forward the theory that the deflection of mid - span and bending moment coefficient calculation of mid - span and support of bi - direction cellular slab could be in accordance with solid plates ", which could satisfy the precision of engineering

    本文根據彈性薄理論,導出了雙向空的平衡微分方程,並通過理論計算和通用有限元程序ansys結果對比,驗證了其正確性;通過對各類邊界條件下雙向空撓度和彎矩系數的計算比較,本文提出:雙向空撓度及跨、支座彎矩可使用本文空剛度公式查找現有的實心撓度彎矩系數表進行計算,完全能滿足工程精度要求。
  6. In the meanwhile, the semi - rigid connections can save steel capacity, and become a kind of not only economical, but also reliability connection. top and seat angle with double web angles semi - rigid connection is of performance, while few study has for complex destroy and many effect factors

    頂底角鋼雙連接由於其較好的性能,但由於其破壞的形式比較復雜而且影響因素較多在國內外研究觸及很少,本基金項目正處於此初衷對其進行理論研究與實驗分析。
  7. The ' shape of basal tegmen, basal piece of lateral lobe with crack in base, lateral margins of basal piece of lateral lobe, the ratio of width of lateral lobe and width of apex of basal piece, shap

    本文分析討論了雌性產卵器各部分的結構特點在偽葉甲亞科分類的意義,如肛側是否分片、肛側背面部分是否延長、基片基部大片的分節
  8. Thecalculating results show that the composite action between concrete floor and steel beamsgreatly influence the bending bearing capacity and initial rotational stiffness of joints, it shouldbe considered in practical engineer. reinforcement ratio of lengthways reinforcing bar andthe stiffener of web have great influencer on the behavior of connections, while the thicknessof end - plate and degree of shear connection have a litter influence on its behavior

    分析計算結果表明:樓與鋼梁的組合作用對節點的抗彎承載力及初始轉動剛度的影響非常大,實際工程節點設計應當考慮這種組合作用;樓內縱向鋼筋配筋率與柱加勁肋對節點性能影響顯著,而連接端厚度及剪力連接程度的影響則不是太顯著。
  9. The way to phosphate the steel panels which have been degreased is called immerged phosphating instead of sprinkled phosphating, which means that the steel panels are immerged into the phosphating liquid completely

    對脫脂后的空鋼地採取了全浸沒式磷化方式,而非噴淋,即將鋼地完全浸入到磷化液
  10. The equijpment is improved in design and is made into a fully automatic h - beam assembling machine referred to the same foreign sort of products. the positioning of the flange and web is performed through hte plus and minus screw mandrel drivenby the mtr accurately. and there is a highly precise coder to feedb - ack and show the accurate size on the unit set to guarantee the flanges, the webs with different width different width within the specified range for accurate positioning and automatic alignmet. there is no need to make adjustment each time

    該機是本廠參考國外同類產品基礎上改進設計而成的全自動h型鋼組立設備,其定位採用電機精確帶動正反絲桿夾緊,另一側設有小行程液壓夾緊,能確保規定范圍內的不同寬窄的,翼精確定位,自動對準確,無須每次作調準。
  11. In the hogging condition, double bottom and the side shell remain the ultimate bucking strength, deck and upperwing tank remain the yield stress, and the other parts keep elasticity. then the key to calculate the ultimate strength of ship hull girders is to ascertain the ultimate bucking strength of the stiffened panels. in this regard, the developed formulation is designed to be more sophisticated than previous simplified theoretical method for calculating the ultimate strength of stiffened panels under combined in - plane bending and lateral pressure. fabricatio n - related initial imperfections ( initial deflections and residual stresses ) are included in the panel ultimate strength calculation as parameters of influence. all possible collapse modes involed in collapse of stiffened panels, including overall buckling collapse, column or beam - column type collapse, tripping of stiffeners and local bukling of stiffened web are considered

    確定了船體梁整體破壞時的剖面應力分佈之後,關鍵在於確定架的極限屈曲強度。本文充分考慮了在縱向彎曲、橫向壓力作用下加筋可能發生的幾種破壞模式,即架的整體屈曲破壞、樑柱形式的破壞、筋的側傾、的屈曲並同時考慮了初始焊接殘余應力、初撓度的影響,使其更精確的計算加筋的屈曲強度。對于加筋加強筋的局部屈曲,採用解析法推導出筋的的撓度方程及其邊界條件,求解相應的方程,從而計算出的局部屈曲應力。
  12. This idealization would, however, disguise the fact that the thin web beneath the point load is in danger of buckling.

    然而,這個理想化的結構不能指出在集荷載下面薄處于屈曲危險的現象。
  13. Modeling the general solid web continuous box girder and opening - in - web ( open web ) continuous box girder by ansys finite element modeling tool, node stress of governing section and corresponding shear lag values are analyzed. the solution is validated by comparing with variational results and modeling test values. based on the model, the section shear lag induced by dead load, prestress tendons and car loads under the most unfavorable condition and lateral symmetry are also approached. the influence of shear lag effect in double - level continuous box girder is considered with opening - in - web and the web location. the analysis indicates that double - level - load arouses less shear lag effect than one - level - load. when self - weight and prestressed tendons act on together, the shear lag effect on box girder take on a evidently change

    基於所建立的有限元模型,本文分別對實開孔兩種箱梁在恆載、車載、預應力荷載作用時,各主要截面的剪力滯效應進行分析,通過施加縱向最不利的和橫向對稱的車輛荷載,研究實連續箱梁和空連續箱梁在承受雙層荷載和單層荷載時引起的剪力滯效應,並考慮開孔及開孔位置對于連續箱梁剪力滯效應的影響。分析表明,雙層車載對于箱梁引起的剪力滯系數比單層車載的影響要小,對于箱梁存在引起的剪力滯后現象有一定的改善作用。
  14. A scottish dish consisting of a mixture of the minced heart, lungs, and liver of a sheep or calf mixed with suet, onions, oatmeal, and seasonings and boiled in the stomach of the slaughtered animal

    哈吉司羊肉一種蘇格蘭菜,由綿羊或牛切碎的心,肺,肝與油,洋蔥,燕麥片和調味料混合在被屠宰動物的煮熟而成
  15. This thesis also studied the influence of the spacing, which is between the central action point on the shackle and the exterior plate of the chassis frame side rail, because the spacing influenced the local stress distribution and the stress concentration of the bus body frame and the chassis frame, and the related variational tendency was summarized

    本文還研究了吊耳銷作用力心點與縱梁間距對車架和客車骨架的應力分佈與集的影響,總結了相關的變化趨勢。
  16. In addition, the main stress at the interface of the bottom flange and inclined web, which located at the interface with the diaphragm, is the largest. so, it should be taken more attention to them in design

    另外,橫隔梁與斜及底交界處的底及斜區域,其主應力數值最大,設計應給予重視。
  17. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文介紹的採用胎具製作和綁扎鋼筋,分底和頂分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至間、先底、后、再頂的施工順序和斜向分段、水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  18. Each bundle of strands is connected to one side of the center web of the two cell box girder.

    每束鋼纜錨固在雙箱梁的的一側。
  19. The cancellation of web bending reinforcement and continuous bar in upper structure of continuous rigid frame bridge is discussed with mechanics method. 4

    並對連續剛構橋上部結構設計取消彎起索、下彎索和連續束問題進行了探討,從力學角度進行了分析研究。
  20. The web perforation is a new formation in the cold - formed thin - walled steel members

    摘要開孔是冷彎薄壁構件一個較新的構造形式。
分享友人