自錨定的 的英文怎麼說

中文拼音 [máodìngde]
自錨定的 英文
self-anchored
  • : Ⅰ代詞(自己) self; oneself; one s own Ⅱ副詞(自然;當然) certainly; of course; naturally; willin...
  • : 名詞(鐵制的停船設備) anchor
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : 4次方是 The fourth power of 2 is direction
  1. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在施工方案研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結構加固、整體結構穩等專項施工方案提出有針對性施工技術措施,人工挖孔樁施工採用鋼筋砼護壁確保挖孔樁安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿柱身化學膠固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構穩等;最後對于該工程實施后效果分析,說明該項綜合施工技術可行性。
  2. The main functions of the module for initializing drawing environment are to set up the scale. linetype. breadth and frame of drawings according to the characteristics of the general arrangement drawing to passenger shippings. the main functions of the second module is to establish and extend graph library, retrieve from graph library and output graph blocks. using the parameterization design method to design interactively and modify automatically graphs of the local cabin are the tasks of the third module. in the help module, the drawing specifications of passenger shipping are integrated, such as equipments of anchor and moor, arrangement of cab, cabin and baggage, measures to come through and ration of passengers, etc. there are some advantages in the proposed system, such as friend interface, operation easily, drawing conveniently and modification automatically

    其中初始化繪圖環境模塊主要針對客船總布置圖繪制特點來完成比例、線型、圖幅和圖框設置;客船總布置圖圖庫模塊主要完成圖庫建立和擴充、圖庫查詢以及圖塊輸出;局部艙室參數化設計模塊採用參數化技術完成對局部艙室圖形動修改以及交互設計;客船規范幫助模塊則集中了一些武漢理工大學碩士學位論文客船繪制規范,如泊及系泊設備、駕駛室、乘客艙室及行李放置、脫險措施及乘客額等規范。
  3. Our company is specialized in supplying all kinds of terminal block, switch test double block, ground block, fuse block, three - level sensor block with light, double block, universal block, integral block, nylon cable ties, cable ties, releasable cablle ties, self - locking cable tie, marker calbe ties, flexible pipe, cable marker, expansion nail / plug, wire joint, cable clamp, nail clip, screw on wire connector, self - adhesive tie mount, spiral wrapping band, wire connectors, cable tie mounts, nylon fasteners, cable gland, nylon ties, cable terminal, terminals, terminal connector, wiring duct, pre - insulated terminals, cable markers, electrician tools, cabling accessories, plastic cable ties, wire tie, tie wrap, beaded tie wraps, tie wrap adhesive, tie wrap tool, cable, wires, terminal connector, terminal block, nail, nylon cable glands, pe tubing and quick screw connector, circle nail cable clips, self - adhesive tie mounts, expand nails, spiral wrapping bands, screw on wire connectors, copper connecting terminals, pre - insulated electrician tools, wire connectors, cable tie mounts, nylon fasteners, nylon ties, cable terminal, pre - insulated terminals, cabling accessories, plastic cable ties, wire tie, tie wrap, beaded tie wraps, tie wrap adhesive, tie wrap tool, cable, wires, terminal connector, terminal block, nail, nylon cable glands, cable accessories, wiring accessories etc. we offer superior product and best service with competitive price

    我們公司是專門供應各種終端塊,交換機測試雙重座,地面座,保險絲座,三層傳感器座輕型雙座通用塊,積分塊,尼龍電纜聯系,電纜聯系,松解索關系鎖式電纜接頭,光纜標記關系,軟管,電纜標記,膨脹釘/插頭,電線接頭,電纜鉗,夾釘,螺絲電線連接,粘配合摩,螺旋帶包,導線連接器,線纜配合固座,尼龍緊固件,電纜壓蓋,尼龍關系,電纜終端,終端,終端連接器,電線導管,預終端絕緣,電纜料,電工工具,電纜配件,塑料電纜聯系,配合鋼絲,為配合劇情,串珠配合纏上搭膠包裹,包裹配合工具,電纜,電線,終端連接器,終端塊,釘,尼龍索腺體,聚乙烯管材及快速接頭螺絲,圓釘電纜夾,粘配合固座,擴大釘,螺旋帶包螺桿導線連接器,銅接線端子,預絕緣電工工具,電線接頭,電纜接頭固座,尼龍拉鏈,尼龍關系,電纜終端,預終端絕緣,電纜配件,塑料電纜聯系,配合鋼絲,為配合劇情,配合串珠包,搭包膠,配合工具包,電纜,電線,終端連接器,終端塊,釘,尼龍腺體電纜,電纜配件,線路配件等,我們提供卓越產品和最好服務,具有競爭力價格
  4. The supporting mechanism of pre - stress anchor is given in following sentences in this paragraph : make full use of sectional stability, put - up steel - net shot concrete to the stratified earth as the trench is being excavated, and by this means, the little liding of soil layers and small broken slumps of rock slopes can be avoided

    預應力支護機理:充分利用巖土層身或預處理局部性,隨基坑開挖分層掛鋼筋網噴射砼,以避免土層幫片及巖石邊坡小節理破碎滑塌,並把土壓力傳給板,由桿集中受力,通過固力平衡土壓力。
  5. Therefore, behavioral corporate finance is created. behavioral corporate finance can give much better explanation to those “ strange phenomenon ” from the angle of psychology and sociology. but the present theories of behavioral corporate finance mainly focus on the research of investors ’ behavior and the research of managers ’ behavior is not enough

    現代心理學對這一問題給出了答案:人在很多時候是非理性,其非理性主要有五種表現方式:過度信、損失厭惡、框架效應、效應及確認偏差。
  6. S was the only one unmoved. but this did not arise from a want of affection ; on the contrary, from a firm conviction. like the rats that one by one forsake the doomed ship even before the vessel weighs anchor, so all the numerous clerks had by degrees deserted the office and the warehouse

    據說一艘命中注要在海洋里沉沒船,船上老鼠會預先溜走,臨到那艘船起時候,這些乘客都逃得精光,也正是象這樣,莫雷爾父子公司所有這樣職員一個個離開了辦公廳和貨倉。
  7. Flutter stability of long span self - anchored suspension bridges and wind - tunnel tests

    大跨度式懸索橋顫振穩性研究及風洞實驗
  8. The techniques of self - anchored suspension bridges, having their uniquely applicable conditions, are now attaining swift development in china

    摘要式懸索橋在國內發展迅猛,該橋式有其特適應條件。
  9. Abstract : the structural characteristics of a three - span continuous half - through, self - anchored, concrete - filled steel - tube arch bridge are introduced

    文摘:介紹了三跨連續中承式鋼管混凝土拱橋特點,闡述了橋型布置原則及主要結構尺寸
  10. This text handles a tunnel for draining off water in huangjiawangarbage ground, in yichangcities is for the example, intro - ducedthe support techniqueofthe anchored bar, thesprayed concrete associated withthereinforcement matwhich is used in theengineeringconstruction, and pass to monitor, express the support technique can develop to the maximum bearing, and become the passive support becomean active support, so the the support technique guarantees the stabilizationof the tunnel and the normal proceeding of theconstruction with theengineering

    摘要以宜昌市黃家灣垃圾處理場排洪洞為例,介紹了噴網支護技術在淺埋軟弱圍巖隧洞施工中應用,並通過監測,表明噴網支護能最大限度地發揮圍巖承能力、變被動支護為主動支護,從而保證隧洞圍巖和工程施工正常進行。
  11. It is shown that small - curvature arch support is very superior to trapezoidal support in mechanical properties, and has higher bearing capacity and better self - stability, so that such problem as short - distance coal gateways and lower branch coal gateways can not be bolted and is difficult to support in high pressure can be solved effectively

    結果證明:小曲率拱型支架力學性能遠優于梯形支架,支撐能力大,身穩性良好,有效解決了近距離和下分層煤層巷道不可且在強壓下難支護問題。
  12. According to the original work on the stability problem of the left side of the river and the elementary analysis on the model of geological mechanism, two section planes of rock group t33 and j have been chosen to carry out the stability evaluation ( the slope stability analysis utilized the sarma program ), both of which have the different rock characters. when loads are calculated, the internal force, underground water, earthquake force, their combination and measure to deal with anchorage force infliction are also considered

    根據左岸邊坡穩問題前期工作和地質力學模式初步分析,並結合工程地質條件調查,選取巖性構成不同t33巖組和j巖組兩個剖面分別進行穩性評價(邊坡穩性分析採用sarma程序進行) ,計算載荷考慮了重、地下水、地震力及其組合以及施加固力處理措施。
  13. On the basis of stability analysis, the author takes the k27 + 825 slope from the type of slope which has lest stability as an example. according to its basic feature, the design ueses the choosed best reinforce and control scheme : lattice beam, anchor wire, grouting and abstraction of water. in the course of design, the author takes into account not only reasonable optimize of whole control plan but also local measure such as whether the unstable block will shear from vnlnerable sections when control plan is laid out concretely, in order to reach the goal of reasonable design and effective control

    在穩性分析基礎上,以邊坡穩性最差一類中k27 + 825邊坡為例,結合其特點,用優選出加固防治方案:框架梁+索斗灌漿+排水進行設計,設計中既考慮總體防治方案合理優化,又充分考慮了加固工程具體布置時是否存在不穩體從索或框架梁薄弱部位剪出可能性等一些細部措施,以達到合理設計,有效及經濟治理
  14. Carrie : maybe the past is like an anchor holding us back. maybe, you have to let go of who you are to become who you will be

    也許往事向一併把我們在原地。也許,你必須放棄現在己而成為將來你。
  15. To tackle this difficult problem, the topic focused crawling technology came into being and occupies a position with its high degree of specialization and objectives in search engine research and development of the next generation search engines. in addition to construct professional search engine, it can be used in a client - based real - time information retrieval system, and has become a new research hot in network information retrieval field

    首先,在考慮了噪音情況下,我們擴充文本提取范圍,形成「鏈接背景信息」義;接著編寫了動提取演算法;然後,在爬行程序運行之前,就大量收集起始頁面地址鏈接背景信息,並利用這些信息指導爬行程序工作。
  16. Dynamic performance of pingsheng bridge and the ground - anchored suspension bridge model, which has the same structural parameters as pingsheng bridge, is calculated. furthermore, the influence on dynamic performance for pingsheng bridge of structural parameters, such as rise - span ratio of main cable, dead load

    6 .針對大跨度式懸索橋可能存在風致振動,對平勝大橋進行了節段模型和全橋模型風洞試驗研究,研究表明:平勝大橋具有足夠抗風穩性。
  17. It is through the ascension grid work that the plant kingdoms will then anchor a genetic blueprint that is crystalline from another time period

    正是通過提升晶格層,植物王國將一個來另一個時期水晶遺傳藍圖。
分享友人