船舶裝載量 的英文怎麼說

中文拼音 [chuánzhuāngzǎiliáng]
船舶裝載量 英文
vessel carrying capacity
  • : 名詞1. (水上的運輸工具, 船舶的通稱) boat; ship; vessels 2. (姓氏) a surname
  • : 名詞(航海大船) oceangoing ship; seagoing vessel of considerable size
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 船舶 : shipping; boats and ships; vessel; watercraft; water-dipper
  • 裝載 : freight; loading; shipping; capacity; storage; embarkation; laden
  1. In the study of the lumber carrier, one of the very important problem is the in spot and ultimate station due to flooding which will bring tremendous threat to the ship because of the few holds in order to study the lumber carrier buoyancy, stability and longitudinal strength under the condition of flooding, the paper adopt fundamental ship principle and iterative and accumulative concept on the basis of insumersibility theory to detailedly calculate the flooding speed flooding amount front draft after draft stability and longitudinal strength considering the ship " s sinking and inclination which will change the center of gravity and the loading station both in hold and on deck and the effect of flooding and lumber amount in holdo in the last, the paper introduces an example of the actual ship named " fei yun ling " and makes a contrast between not taking measure and taking measure which draws a reasonable conclusion and comes up to some advice the method avoids the cockamamie calculating while insures enough precision the paper draws a conclusion that not all the lumber carrier will submerge when suffering the damaged flooding if the loading or measure is suitable

    為了研究運木在破艙狀態下的浮性、穩性和強度,本文在抗沉性理論的基礎上,運用基本原理,採用了迭代和累計的思想,將的進水過程劃分為很多次進水的積累,詳細計算了運木在破艙進水的過程中,考慮到各種破艙參數、本身的下沉、艙室內木材、甲板貨的情況和在進水過程中本身的傾斜對進水重心的影響,以及艙室內的進水和木材對破口處進水速度的影響,總的進水速度、進水、首尾吃水、穩性的實時狀態和最終的總縱強度,給出了計算實例,並進行了在採取用泵抽水前後浮態參數的對比,得出了該在艙室內的貨物積達到某個數值時可以保證在破艙進水時不會沉沒,或者在當開口小於某數值時,採取適當的措施后,可以使避免沉沒。
  2. With globalization the performance of ocean ships served for international business is becoming larger. today the maximal volume of a container vessel has been even 8000teu and the loading capacity of a bulk cargo ship could be up to 400, 000 ton

    隨著全球經濟一體化的不斷發展,服務于國際貿易的遠洋單體重能力也日益增大,目前最大的集已達8000teu ,最大的散貨已達40萬噸。
  3. China shipping, taking china shipping group company as its core, has total assets of rmb 40 billion. under its umbrella, there are five specialized shipping fleets of oil tankers, tramps, passenger ships, container vessels and special cargo ships, respectively, comprising 400 vessels with an aggregate deadweight of 11. 5 million tonnes

    中海集團以中國海運集團總公司為核心企業,現擁有總資產約400多億元人民幣,麾下由油運貨運集箱運輸客運特種貨運輸等五大專業公司組成的主營隊,擁有各類近400艘,近1300萬重噸,年運輸超到2 . 7億噸。
  4. In this paper, the influence of ship ' s tonnage, ship ' s carrying quantity and ship type on the ship ' s mooring force is studies through model experiments

    通過模型試驗研究噸位、船舶裝載量類型對系纜力的影響。
  5. Grounded on a comprehensive discussion of the effects of tonnage, loading condition, ratio of water depth to draft and tugboat power, the thesis puts forward the assessment curves as well as the regression formulae

    詳細討論了排水狀態、水深吃水比和拖輪功率與極限航速的關系,並給出極限航速估算圖譜以及相應的回歸公式。
  6. You should cable us the vessel name, estimated loading period, loading capacity, contract number, shipping agent to us 12 days before loading time

    你方應在隻受期12天前將名、預計受期、、合同號、代理人電報告知我們。
分享友人