范圍計劃編制 的英文怎麼說

中文拼音 [fànwéihuàbiānzhì]
范圍計劃編制 英文
scope planning
  • : 名詞1 [書面語] (模子) pattern; mould; matrix 2 (模範; 榜樣) model; example 3 (范圍) boundar...
  • : Ⅰ動詞1 (四周攔擋起來 使裡外不通; 環繞) enclose; surround; corral 2 (繞; 裹) wrap Ⅱ名詞1 (四...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
  • : Ⅰ動詞1 (編織) weave; plait; braid 2 (組織; 排列) make a list; arrange in a list; organize; gr...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • 范圍 : scope; limits; extent; boundary; confines; range; range dimension; spectrum
  • 計劃 : 1 (工作、行動以前預先擬定的內容和步驟) plan; project; programme; device; devisal; design 2 (做...
  • 編制 : 1 (組織機構的設置及其人員數量的定額和職務的分配) authorized strength; formation; establishment;...
  1. Present methods generally based on the statistics of earthquake damage, expert experiences, theory analysis and experimental researches have obvious advantages, disadvantages and certain scopes of application ; ( 2 ) different prediction methods should be adopted against different building conditions, sites, intensity and experiences etc to predict earthquake damage of buildings for prospective accuracy, dependability and availability ; ( 3 ) earthquake damage matrix, which is the foundation of earthquake damage prediction, of 7 kinds of building in the urban areas of zhangzhou city under intensity 6 to 9 has been set up. the damage conditions of different buildings under different intensity are as followings : all kinds of structures are basically intact under intensity 6 ; the reinforced concrete structures are basically intact under intensity 7, but other kinds of structures are destroyed slightly ; the reinforced concrete structures are still basically intact while other kinds of structures are destroyed intermediately under intensity 8 ; the reinforced concrete structures are destroyed slightly, single - story factories and open houses are destroyed intermediately and other kinds of structures are destroyed seriously under intensity 9 ; ( 4 ) the results of earthquake damage predicting of buildings embody the damage when earthquake happens in the future. thus, further identifications and reinforcements should be considered to buildings that will be destroyed intermediately or more under the earthquake with 10 % exceeding probability in future 50 years ; ( 5 ) the direct economic losses caused by damage of buildings resting with the area, structural type, intensity and damage of all kinds of buildings are the main part of the losses of the city in an earthquake ; ( 6 ) the direct economic losses increased progressively toward high intensity by 2 or 3 times

    基於上述研究,得出的主要結論有:建築物震害預測是一個模糊的、系統的、復雜的問題,現有的方法很多一般都是以震害統規律、專家經驗、理論分析和試驗研究為依據,有其自身的優缺點和一定的適用;應針對不同的建築物條件、場地條件、地震強度和已有經驗等,採用不同的預測方法進行建築物震害預測,以使預測結果達到預期的精確性、可靠性和可操作性;建立了漳州市區7類建築物在6度9度地震作用下的震害矩陣,成為指導抗震防災的重要依據,各類結構的震害情況表現為: 6度地震作用下各類建築物基本完好; 7度地震作用下除鋼筋混凝土結構基本完好外其餘以建築輕微破壞為主; 8度地震作用下鋼筋混凝土結構仍以基本完好為主而其餘建築以中等破壞為主; 9度地震作用下鋼筋混凝土結構以輕微破壞為主,單層工業廠房和空曠房屋以中等破壞為主,其餘建築以嚴重破壞為主;建築物的震害預測結果體現了未來地震來臨時的震害程度,在漳州市區抗震防災規時,對于遭遇50年超越概率10的地震影響發生中等以上破壞的建築物應考慮進行抗震鑒定和加固;由建築物的破壞所造成的直接經濟損失是城市地震經濟損失的主要部分,重慶大學碩士學位論文中文摘要其主要與建築物總面積、結構類型、地震烈度和各類建築物的震害程度有關;不同烈度造成的直接經濟損失按2一3倍向高烈度方向遞增,漳州市區直接經濟損失由6度至9度的比例關系為1 : 2 . 8 : 8 . 6 : 22 . 8 ;遭遇基本地震設防烈度( 7度)時,漳州市區直接經濟損失約4 . 5億元,無家可歸人員約40000人,且以磚木結構和多層磚混結構的震害損失最大;地震造成的人員傷亡主要與建築物倒塌及嚴重破壞的程度和總面積以及震時的建築物室內人數密切相關,地震時無家可歸人員主要與住宅倒塌、嚴重破壞及中等破壞的程度和總面積以及城市人均居住面積密切相關。
  2. Then we define criterions including a series of software practice process and method and tools, which are also fit most of home software corporation to application software exploration and fit them to improve their software exploration engineering management before passing evaluation of cmm. the criterions we defined using a series normative process and document to engineer software exploration, which include " project management criterion ", " configuration management criterion ", " software test criterion ", " document writing criterion ", " software exploration and maintenance criterion ", ' software life cycle guide ", etc. " project management criterion " defines area and principle of software research management, which is practiced to manage the people, technology, resources, software, process and so on to improve efficiency and to ensure quality and increase income

    《項目管理規程》定義軟體研發管理的、原則,通過實施該規程來對項目中的人員、技術、資源、軟體、過程等進行全方位的管理,一西南石油學院碩卜學位畢業論文以達到提高效率、保證質量、降低消耗、增加收益的最終目的; 《配置管理規程》 ,通過實施該規程對項目開發過程中的所有資源進行控; 《軟體測試規程》定義對軟體系統測試所用工具、過程和責任: 《文檔規程》提供滿足國家《算機軟體文檔gb8567 》標準的各種文檔模板來建立統一的文檔; 《軟體開發和維護規程》定義了軟體開發過程以及採取的方法和工具; 《軟體生命周期指南》 ,根據軟體項目管理的經驗,將典型軟體過程形成軟體過程模型,用於指導以後軟體周期的選擇; 《年度公司規》 ,對需要公司總體安排的資源統一調度的過程。
  3. In planning phase, it is necessary to examine the elementary things of audit object, such as the concerned policies and intentions, main activities, and work out the audit plan according to them. in conducting phase, auditors acquire audit evidences to sustain auditor ' s opinions

    初步調查就是要了解被審單位及其政策和目標、主要業務活動、主要資源、影響績效的主要風險等,然後根據初步調查結果,,即確定審目標、審和為實現審目標而採取的審方法和審程序等。
  4. Based on conclusion of practical experience from polymer flooding pilot test, and in combination with theoretical calculation and analysis of numerical simulation, the varying range of main production index by polymer flooding is determined, varying mode of liquid production, comprehensive water cut, oil production and incremental oil by polymer flooding is set up by adopting reservoir engineering method, forming simplified, fast and feasible method for calculating production index by polymer flooding, which provide practical and theoretical basis for making polymer flooding programe

    本文在總結聚合物驅礦場試驗實踐經驗和結合數值模擬理論算分析的基礎上,研究確定聚合物驅主要開采指標的變化,採用油藏工程方法建立聚合物驅采液量、綜合含水、採油量和增油量的變化模式,形成簡便、快速、實用的聚合物驅開采指標測算方法,為聚合物驅規方案提供了實踐和理論依據。
  5. Abstract : based on conclusion of practical experience from polymer flooding pilot test, and in combination with theoretical calculation and analysis of numerical simulation, the varying range of main production index by polymer flooding is determined, varying mode of liquid production, comprehensive water cut, oil production and incremental oil by polymer flooding is set up by adopting reservoir engineering method, forming simplified, fast and feasible method for calculating production index by polymer flooding, which provide practical and theoretical basis for making polymer flooding programe

    文摘:本文在總結聚合物驅礦場試驗實踐經驗和結合數值模擬理論算分析的基礎上,研究確定聚合物驅主要開采指標的變化,採用油藏工程方法建立聚合物驅采液量、綜合含水、採油量和增油量的變化模式,形成簡便、快速、實用的聚合物驅開采指標測算方法,為聚合物驅規方案提供了實踐和理論依據。
分享友人