蒸汽分配器 的英文怎麼說

中文拼音 [zhēngfēnpèi]
蒸汽分配器 英文
steam distributor
  • : Ⅰ動詞1. (蒸發) evaporate2. (利用水蒸氣的熱力使食物熟或熱) steam Ⅱ名詞[中醫] (將藥物隔水蒸熟) steaming
  • : 名詞1. (由液體或某些固體變成的氣體) vapour2. (水蒸氣) steam
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • : Ⅰ動詞1 (兩性結合) join in marriage 2 (使動物交配) mate (animals) 3 (按適當的標準或比例加以...
  • : 名詞1. (器具) implement; utensil; ware 2. (器官) organ 3. (度量; 才能) capacity; talent 4. (姓氏) a surname
  • 蒸汽 : vapour; reek; breath; steam蒸汽採暖 steam heating; 蒸汽錘 [機械工程] steam hammer; 蒸汽打樁鍾 ste...
  • 配器 : orchestrate; arrange配器法 orchestration; 配器者 orchestrator; orchestrater; instrumentator
  1. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,底腹板和頂板別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向段、腹板水平層、附著式振搗為主、插入式搗固為輔的施工工藝,養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  2. The steam flows through two large diameter ducts ( 2000 ) to the condenser. steam enters from this distribution manifold into the finned tubes at the top of the primary condensing bundles

    通過1個大孔徑管道( 2000 )為兩個管道( 1600 )流入凝通過集管進入一次冷凝管束頂部的翅片管道。
  3. An acceptable alternative is to use a demountable system which allows the filters and downstream distribution system to be removed, dried and steam sterilized between sessions. disinfection after re - assembly to kill dislodged organisms should be carried out

    一種可接受的替代方法是採用可拆卸系統,使得過濾和下水系統能在每次使用之間拆卸、乾燥和滅菌,然後在重新組裝之後執行消毒,殺死游移的有機物。
分享友人