蓄水庫容 的英文怎麼說
中文拼音 [xùshuǐkùróng]
蓄水庫容
英文
conservation storage-
The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation
福堂水電站位於四川省阿壩藏族羌族自治州汶川縣境內的岷江河段上,電站為低閘引水式開發。正常蓄水位1268 . 0m ,最大閘高31m ,庫容297 . 4萬m ~ 3 ,引水隧洞長19 . 57km ,裝機360mw 。福堂水電站閘壩建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。When the model is applied to a historical dam - break flood, the computational results agree well with hydrographic station records and flood tracking investigation
依據水量平衡原理及水流連續性條件,建立了支流蓄泄庫容關系和支流倒回灌數學模型。Qualitative analysis on the effect of flood control and engineering safety -, seizing lots of water conservancy effective adjust storage. then making water level risen and reservoir backwater enlarged in the same flow level ? effect on beach and the buildings across river, soil salinization caused by flow from a lower to a higher place and unsmooth groundwater drainage destroy of travel resource caused by disorder enclose tideland for cultivation in reservoir silt up flood plain are given, then presents enclose tideland for cultivation dyke is important cause which water level rise in reservoir
本文從青銅峽水庫泥沙淤積入手,分析水庫泥沙淤積特性和庫區圍墾堤開發利用淤積灘地的現狀,對防洪安全及工程安全的影響、侵佔大量的有效調蓄庫容、造成同級流量下水庫水位抬升水庫回水上延、對沿岸及過河建築構成影響、因水位抬升致使庫區周邊灌區地下水排水不暢乃至倒灌而造成土地鹽堿化、對水庫庫區大量淤積灘地無序圍墾造成旅遊資源破壞等五方面影響的定性分析,提出庫區圍墾堤是水庫水位抬升的重要原因。With this installation, a supply of irrigation water can be proactively managed depending on usage, as compared to a fixed volume of an inland reservoir, thus consuming water in a more effective manner
化淡廠完成後,灌溉用水將可因應情況來控制供水量。跟固定容量的蓄水庫相比,用水將可更加有效率。At last, the paper interprets the geological background of the forming of landslides, and reveals the landform, stratum, lithology and geologic structure based on the etm + image. and also, the paper interprets the location and distribution of the specific disaster bodies based on the quickbird image. through the analysis of the extracted information, the paper considers : the geologic structure of fengjie county is complex, and lithology is crashed ; the terrane in the canyon segment is fairly stable ; the terrane in some segments of the southern bank will be less stable after the water is stored, because the rock is in the same direction and is apt to slip with human project
最後在etm +圖像上對滑坡發育的地質背景進行解譯,提取了地形、地層巖性、地質構造等信息,在quickbird影像上詳細地圈定了滑坡災害體的實體位置及發育范圍,通過對所提取信息進行分析,本文認為,奉節縣地質構造復雜,巖性破碎;峽谷段巖層穩定性較好;南岸部分地段為順向巖層分佈區,人類工程活動容易誘發順層滑坡,蓄水后庫岸整體穩定性下降。Abstract : this paper gives an account of the service behavior of dam safety monitoring system of tianshengqiao hydorpower station during construction period, impounding period and operation period, with comparing the deformation conditions of the dam before and after impounding and the behavior of the dam since its operation
文摘:通過大壩安全監測,天生橋一級水電站大壩安全監測系統在施工期、蓄水期及運行期的工作性態,比較水庫蓄水前後大壩各項監測內容的變形情況以及大壩運行到目前的工況。Der gewaltige h ? henunterschied an der staumauer und die gewaltigen wassermengen im reservoir bilden ein potential, dessen wirtschaftliche und ? kologische nutzung einen tiefgreifenden einfluss auf die weitere wirtschaftliche und soziale entwicklung in china haben wird
大壩邊巨大的高差,以及水庫中大容量的蓄水所形成的經濟上和生態上利用的潛力,將對中國經濟和社會進一步的發展產生深遠的影響。分享友人