蓄電裝置 的英文怎麼說

中文拼音 [diànzhuāngzhì]
蓄電裝置 英文
electrical storage devices
  • : 動詞1. (儲存; 積蓄) store up; save up 2. (留著而不剃掉) grow 3. (心裏藏著) entertain (ideas); harbour
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • 裝置 : 1 (機器設備的配件)installation; device; apparatus; equipment; arrangement; gear; appliance; rig...
  1. New battery charger for mining electric locomotive

    新型礦用機車池充
  2. This paper presents a method that chopping wave is done by switch devices which consist of three - level resistance regulating module and intelligence power module ipm, and which realizes constant - current discharge of storage battery. to achieve the intelligence control of the drive protection and the discharge process of ipm, the paper designs circuit formed by igbt threshold drive pulse pwm signals. ipm fault - blocking protection circuit and microcomputer 80c196. the devices can accurately control the 0 ~ 150a discharge current and the discharge time of the storage battery and calculate the releasing power

    實現池恆流放過程智能控制是池放發展的必然趨,本文提出了一種通過三極阻調節模塊和由智能功率模塊ipm為開關器件進行斬波從而實現池恆流放的方法。為達到對ipm的驅動保護和放過程的智能控制,文中設計了igbt門極驅動脈沖pwm信號形成路和ipm故障封鎖保護路及由單片機80c196為核心的微機控制器。本能夠對池進行0 150a放流及放時間的精確控制及釋放容量的計算。
  3. Safety requirements for secondary batteries and battery installations - stationary batteries

    二次池和的安全要求.二次
  4. The braided copper wire is suitable for the flexible conductor of electric installation, switch gear, electric frunace, storage battery, etc

    銅編織線用於,開關器,爐及池等的軟連接線。
  5. Most people have the kind that switches over to batteries in emergency.

    大多數人都有在緊急情況下換用池的那種
  6. Code for construction and acceptance of battery electric equipment installation engineering

    工程池施工及驗收規范
  7. This paper presents the way to configurate the distribution transformer, and the setting method for the stator earth fault protection with the example of hubei tiantang pump - storage power plant

    針對配變壓器提供了一套較完整的配和整定計算方法,並結合湖北天堂抽水站的實例進行計算, ?此類接地方式提供了可借鑒的方法。
  8. 30 litre couplant tank. automatic pumped supply with full recirculation. visual and electronic level display. continuous couplant monitoring by flow sensor and ultrasonically

    30升的耦合劑儲槽。自動化泵槽可以將其完全循環利用。可顯示直觀的子層面。通過流量傳感器和超聲波地來對耦合劑進行連續監控。
  9. Qi - kai electric company ' s main products are direct current panels, relay protecting panels, alternating current panels, mimic diagrams and charge - bypass chargers, moreover, we provide services for battery assembly

    奇凱氣公司主要生產直流屏、繼保護屏、交流屏、模擬屏、充浮充和名類池的組
  10. Erection works of electrical installations code for construction and acceptance of battery

    工程池施工及驗收規范
  11. Lead acid batteries for special type explosion proof power unit in coal mine

    煤礦防爆特殊型用鉛酸
  12. During the heat accumulator supplying to users, the electric boiler usually try to make heat by starting at low price of electric and stopping at high. in general, the system of electric boiler with heat accumulator runs according to experience to utilize the time - of - use electricity price or controlled by the signals of water level or temperature

    當前運行的熱式鍋爐供熱系統中鍋爐的啟停控制一般有兩種方式:一種是根據分時價和用戶熱負荷由人工啟停,另一種是根據熱器的水位或水溫信號由自動控制啟停。
  13. This dissertation focus on a innovation methods for inverter controlled hydraulic elevator system applying pressure accumulator as the " pressure - energy transformer ". the required power supply and running energy can be reduced remarkably when accumulators storing and releasing pressure oil. then the key items about hydraulic speed control system based on the ens 1 - 2 and other hydraulic elevator standards are investigated in detail

    本論文主要研究了採用能器-液壓泵馬達構成的「壓力-能量轉換」來儲存釋放變頻驅動液壓梯系統的能量,從而降低液壓機功率和運行能耗的新方案;在此基礎上,根據國內外液壓梯的標準進行了與速度控制相關的關鍵項目測試,最後針對本課題研製的節能控制系統與當前市場上幾種典型的液壓梯控制系統進行了能耗對比研究。
  14. The second chapter simply introduces the development of alternate asynchronous inverter technology and retrospects some types of energy - saving systems for hydraulic elevators. then the working principles of the project are discussed and analyzed at four different working status, i. e. light load upwards, heavy load upwards, light load downwards and heavy load downwards. and the chapter focus on the introduction of structure design of pump station, calculation and type selection of pump / motor reversible units, research on oil leakage principles of accumulator circuit, design of accumulator - pump / motor pressure - energy transformer and integrated valve blocks, etc. the last but not the least, the electrical wiring of vector inverter control cabin and design of computer control and data acquisition system are introduced

    論文第二章首先簡單介紹了交流異步動機變頻調速技術的發展概況,在回顧梯液壓控制系統節能技術的基礎上,介紹了本課題研製的「採用能器的液壓梯變頻節能控制系統研究」的基本原理,分析了動力系統在梯轎廂輕載上下行、重載上下行等四種典型工況下的基本工作狀態和工作方式;詳細地介紹了本課題節能系統液壓動力泵站的結構設計和參數設計,重點研究了液壓動力泵站的結構設計、液壓泵馬達可逆性問題及其選型設計計算、能器迴路泄漏油損失機理的研究及其補償的設計、能器-泵馬達壓力能量轉換的設計、多功能集成控制閥組的設計等內容;最後簡單介紹了本課題矢量控制變頻控制櫃的外部附件氣接線、計算機控制及數據採集系統的硬體設計等內容。
  15. Electrical storage devices

    蓄電裝置
  16. As the most effective means to increase the economics and reliability of power station, pumped storage power station with static frequency converter ( sfc ) for start - up is widely used in developed country. recently china also implements several pumped storage power station projects

    抽水站利用靜止變頻啟動( sfc )方式啟動,這種方式在啟動時產生諧波,對sfc及同壓級別的其它用戶產生影響,也會通過降壓變壓器向高壓傳遞,對高壓側的用戶產生影響。
  17. Application of section locking device in baishan pumped - storage power station

    分段關閉在白山抽水站的應用
  18. The shahe pumped - storage power station with two 50mw reversible units has been in good conditions on general since it was put into operation, but there still were some defects, such as the failure of unit ' s contemporaneous device, the insufficient cooling water discharge and pressure, and the failure of static frequency converter and excitation overcurrent

    摘要沙河抽水站兩臺50mw可逆式機組自投運以來,總體情況良好,但是也出現了一些缺陷,如機組同期故障,機組冷卻水流量或壓力不足,靜止變頻器故障,勵磁過流故障等。
  19. The development of dc control power system described in this paper is oriented to the baoji - chengdu electric railway - engineering project. a dc control power system, which is based on plc, hf switch rectifier and valve control seal battery is described in the paper

    本文結合寶成復線氣化工程,針對牽引變所直流控制源系統設計,闡述了一個基於plc控制器、高頻開關整流和閥控式密封鉛酸池的直流屏的設計和產品研製。
  20. Charge and discharge operation test for battery and charge equipment

    池和充的充放試驗。
分享友人