蓋基河 的英文怎麼說

中文拼音 []
蓋基河 英文
geikie river
  • : 蓋名詞(姓氏) a surname
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  1. In places, hill - slope debris forms a mantle over the bedrock and alluvium fills some of the valleys

    在部分地方,巖表面由巖石碎屑堆積形成覆層,而部分谷則有沖積層。
  2. Based on available data, the study on regional structure, sedimentary reservoir and source rock characteristics shows that the basins in south china sea had experienced sedimentary evolution in faulting period and depression period, deposited thick cenozoic formation, upwardly developed alluvial fan facies, river - lake facies coastal swamp facies coastal facies, neritic facies and bathyal deposit system, regionally had 3 source rocks of eocene, oligocene and miocene, 3 reservoirs of pre - cenozoic basement buried bill, oligocene sandstone and miocene reef, with pliocene and pleistocene neritic facies and bathyal shale as regional caprock

    摘要以現有資料為礎,通過對區域構造、沉積儲層、烴源巖特徵等礎石油地質條件研究,認為南海海域各盆地經歷了斷陷期和坳陷期沉積演化,沉積了巨厚的新生代地層,自下而上發育了沖積扇相、湖相、濱岸沼澤相、濱海相、淺海相、半深海相沉積體系,區域上存在始新統、漸新統和中新統3套烴源巖,前新生代巖潛山、漸新統砂巖、中新統生物礁3套儲層,區域層為上新統和更新統淺海半深海相泥巖。
  3. 2 by means of seismic stratigraphy and sequence stratigraphy, the text analysized the charateristics of the second part of xejiahe formation, the framework of sequence stratigraphy constainted by seismic reflection in equal time has been established. analyzed the sedimental mechanics charateristics of different cycle types, the paper predicts regulation of sandston " s distribution inside the framework of sequence stratigraphy and remarked source - reservoir - cap rock assemblages

    2 、運用地震地層學、層序地層學的本理論分析須家組二段層序地層學特徵,建立地震約束的層序地層格架,分析地層格架中層序內部砂體展布規律,評價生儲組合。
  4. Based on the detailed investigation, the distribution of cracks in capping beam of the abutment of huaihe river bridge on the national road 107 is presented, the causes leading to the cracks are thoroughly analyzed, and the construction scheme and methods for remedy of the cracks in the abutment are described as well

    摘要在詳細調查的礎上,介紹了107國道槐大橋橋臺梁裂縫的分佈情況,深入分析了裂縫形成原因,並闡述了該橋的加固方案和施工方法。
  5. The concept of this work comes from the riverbed and the nourishing effects the river plays in world cultures. symbolizing riverbeds in nature and adding a touch of leisure life in modern society, the five granite beds rest on a miniature course of the keelung river with small current of water running on each one. the sandblasted forms of fruits and maple leaves recall the importance of environment

    本作品床,以大孕育文化做為作品創作發想點,加入現代社會的生活休憩概念,將五組象徵大自然中川交匯的床型花崗巖雕塑,架設于卵石所鋪設而成的之上道造型則保持截彎取直前的原貌,並以少流量的水流,薄薄地覆五組床型雕塑品,床板上散落的楓葉與果實,則象徵環保理念對大自然保育的重要性。
  6. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂水電站位於四川省阿壩藏族羌族自治州汶川縣境內的岷江段上,電站為低閘引水式開發。正常蓄水位1268 . 0m ,最大閘高31m ,庫容297 . 4萬m ~ 3 ,引水隧洞長19 . 57km ,裝機360mw 。福堂水電站閘壩建於深厚覆礎上,礎主要存在五大覆層,總體屬于多層復雜地
  7. According to the principles of " positive and steady, scientific programming and rational layout ", the cpc municipal committee and municipal government have programmed the city from a high starting point, constructed the city according to a high standard, administered the city at a high level, managed the city with a high efficiency, made the city green with a high quality made a total investment of nearly 2billion yuan, completed a large group of infrastructures and greening and beautifying projects in succession, made the size of constructed downtown area increased from less than 6square kilometers to 132squme kilometers, completed greenbelts with an area of 316hectares, made green percentage of coverage up t032 %, per capita public greenbelt area up to 10. 72 square meters, initially formed a garden - style ecologieal city with " trees shadowing the street, soft green grass carpeting the ground, greening all the year round, blossoming out in 3seasons ", gained honors and titles of " state - level excellent city in urban environment comprehensive renovation ", " provincial - level landscape garden city ", " award of residential environment of henan "

    市委、市政府按照"積極穩妥、科學規劃、合理布局"的原則,高起點規劃城市,高標準建設城市,高水平管理城市,高效益經營城市,高品位綠化城市,共計投資近20億元,相繼完成了一大批礎設施和綠化美化工程,建成區面積由原來的不足6平方千米,擴大到132平方千米,市區擁有綠地316 :公頃,綠化覆率達32 % ,人均公共綠地面積10 . 72平方米,一個"綠樹成蔭、芳草遍地、翠點四時、花開三季"的園林化生態城市已具雛形,榮獲"全國城市環境綜合整治優秀城市" 、 "省級園林城市" 、 "南人居環境獎"等榮譽稱號。
  8. In which, it gives inquiring of the construction of deep - water foundations and the usage of floating crane. the construction program of bridge pier foundation will be fixed according to the water depth. if the water depth is less than 4m, pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed, at the same time, it has sufficient bearing capacity to load steel pipe pile, the steel pipe pile platform will be adopted

    其中,對深水礎的施工及浮吊的使用進行了探討,根據水深確定橋墩礎的施工方法,對水深不超過四米的橋墩礎,採用填土築島的方法:對水深大於四米,床有覆層,且能保證鋼管樁具有足夠的承載力的橋墩,採用鋼管樁平臺;對主道上床沒有覆層,鋼管樁無法插打的橋墩,採用浮式平臺。
  9. The region and the earth surface across this road are mainly water above ground and run - off and the ground water is mostly made up of groundwater and perched water ; the river bed is more obvious ; the overbank is covered by medium sand and gravel ect

    路線所經地帶地面主要為地表水和徑流,地下水主要以潛水和上層滯水為主,床較明顯,灘覆中砂、礫石等。地勢低洼地帶地表常年積水,影響路穩定。
  10. In the light of the low - lying pile cap foundations designed for main piers no. 2 and no. 3 of tianluo bridge on wenzhou - fuzhou railway. this paper describes the ways to resolve the construction problems of the foundations in deep water in sea and at seabed that is steep and without overburden, using the construction techniques of underwater rock blasting, steel cofferdam floating, positioning, bottom sealing and manual pile digging

    摘要針對溫福鐵路田螺大橋2號、 3號主墩設計上採用低樁承臺礎情況,介紹運用水下巖石爆破,浮運鋼圍堰就位、封底、人工挖孔樁等施工技術解決海上深水、床陡峭且無覆層的礎施工難題。
  11. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    地下連續墻是一種歷史較短的施工方法,目前,砼防滲墻的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用地下連續墻與樁在豎向荷載作用下的工作性能有相似性,將適用於樁的poulos彈性理論引入對地下連續墻的沉降計算中;清華大學水利水電工程系濮家騮、于玉貞根據三軸試驗結果確定混凝土的參數,利用非線性e - b模型,結合黃小浪底土石壩設計剖面,採用thepd土石壩總應力程序,對深覆層塑性混凝土防滲墻的應力、位移進行有限元分析,並與普通混凝土防滲墻計算結果加以對比,同時分析了不同配比塑性混凝土特性的影響,並採用應力水平和拉應力數值來判斷塑性混凝土防滲墻的安全程度。
  12. In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied

    其次,將這一模型用於分析下坂地水利樞紐工程,由於該工程床覆層深度最深達147 . 95m ,是壩體高度的近兩倍左右,壩的滲流和液化成為壩體安全主要問題,本文對該壩的三種設計方案即水平鋪層防滲方案、粘土心墻防滲方案及瀝青心墻防滲方案的靜態應力位移及壩體在竣工期、蓄水期等各個階段可能產生的破壞進行了認真研究。
  13. 5. on the basis of the simplified calculating model this paper studied, the static and dynamic models analysis of milky way mcar were performed by using fem program sap93. the calculating results were compared with the experimental data and they are close

    在本文所研究的簡化模型的礎上,利用有限元計算程序sap93對銀拱型波紋鋼屋進行了靜力和動力模態分析,並與試驗結果進行了比較,兩者符合較好。
  14. In accordance with the problems existing in the present research, taking milky way mcar as the object of study, some creative work has been as follow : 1. a systematic introduction was given about the shaping method, characteristics and developing history of mcar. the present experimental and theoretical researches situations and the preliminary conclusions were summarized

    本文以銀拱型波紋鋼屋為研究對象,於國內外的研究及應用狀況,針對目前所存在的問題,主要進行了如下一系列有意義的研究: 1 、系統的介紹了金屬拱型波紋屋的成型方法、特點、發展歷史,綜述了這種新型結構形式的理論、試驗研究現狀。
  15. The others showed partly decreased, but the degradation of vegetation were obviously in lower reaches of tarim and cherchen river ; in the mountain area of southern xingjian, the forest area were increased, and the others decreased ; in northern xingjian, both the mountain and the plain area increased. they showed the decrease of desert and the increase of oasis ; the change of vegetation cover in the hexi corridor - alax desert were not obviously ; but in chai - damu basin, the area of desert and low cover grassland increased, the others vegetation decreased, especially in the high cover grassland. that showed the great degradation of ecosystem, and the most of degradation was shown in the north hillside of the arjin mountain and qi - lian mountain

    而從各個分區來看,情況不盡相同:南疆地區平原區綠洲面積擴大,荒漠面積本不變,其他類植被面積不同程度縮小,而在塔里木下游、車爾臣下游植被退化;南疆山地森林面積略有增加,其他類植被面積略有縮小;北疆的平原區和山區的植被狀況均有改善,表現為荒漠面積縮小,綠洲面積增加;西走廊一阿拉善地區總體變化不大;但是柴達木盆地的荒漠面積、低覆度草地增加,其他類植被,尤其是甚高覆度植被(草甸)的面積縮小,表明該地區的生態環境退化,而退化表現的主要地區在環柴達木盆地的阿爾金山和祁連山的北坡。
  16. It brings forward that the basic - superbasic cluster ( band ) related ni is variscan magmatic rock. it lies in the jin ping superficial fault unit ( also named " golden band " ) of subsidiary fracture unfold and wheel position of hong he " s profound fault and the marginal overgrowth band of yang zi platform

    通過上述研究,認為該與鎳有關的性-超性巖群(帶)為華力西期巖漿巖,位於紅深大斷裂舒展轉彎部位的次級斷裂上、揚子地臺邊緣增生帶的金平層斷塊單元中(也稱「金鑲邊」帶中) 。
  17. The foundation of gated - weir of the wanbahe power station is located on quaternary deposit which is soft

    摘要灣壩水電站閘坐落在第四紀砂礫石覆層上,屬于軟上建閘。
  18. The improved sewerage infrastructure has helped minimise sewage pollution in rivers in some areas, especially in the eastern new territories

    後者為建立涵全港污水收集網路提供藍圖,再配合不斷改善污水本設施,大幅度消減區域溪污染,其中以新界東部的成效尤為顯著。
  19. But he who hears and does not do is like a man who built a house upon the earth without a foundation, against which the river broke out, and immediately it collapsed, and the crash of that house was great

    49惟有聽見不實行的,就像一個人在土地上造房子,沒有根流一沖,那房子立刻倒塌了,並且崩毀得很大。
  20. Lk. 6 : 49 but he who hears and does not do is like a man who built a house upon the earth without a foundation, against which the river broke out, and immediately it collapsed, and the crash of that house was great

    路六49唯有聽見不實行的,就像一個人在土地上造房子,沒有根流一沖,那房子立刻倒塌了,並且崩毀得很大。
分享友人