裂化爐 的英文怎麼說

中文拼音 [lièhuà]
裂化爐 英文
cracked still
  • : 裂動詞[方言] (東西的兩部分向兩旁分開) open
  1. The intermediate pressure exhaust gas boiler in the shop of yantzi petrochemical oil refinery works is needed to recycle the exhaust heat from the dust

    揚子石煉油廠催車間中壓余熱鍋,用來回收催再生煙氣的余熱。
  2. The use of exhaust paste before the catalytic converter can also cause the monolith to break

    在催裂化爐前使用廢氣漿糊也會引起塑膠製品破
  3. Wear resistant layer of cylinder and double - layer liner in catalyst creaking apparatus ( without or with tortoiseshell net can be used ), inner liner of carbon monoxide exhaust - heat boiler, pouring at site for furnace roof with high temperature of heating furnace of steel rolling, different forging furnace, resistance furnace, the prefabricated parts can also be made

    裝置中的筒體耐磨層及雙層襯里, (無龜甲網和有龜甲網均可採用)及一氧碳余熱鍋的內襯,也適用於軋鋼加熱、各種煅造、電阻頂、墻、底高溫部位的現場澆注,可製成預制構件。
  4. By virtue of the experiments carried out on the modified pilot - scale biomass gasification system, the temperature field in the gasifier is made explicit. and also some principles about how the temperature, feedstock and extraction mode exert influences on heat value and production rate of gas are attained. in addition, some tentative tests of tar cracking and thermodynamic characteristics of biomass gas burner have been performed, which are that indispensable to design and operation of biomass gasification demonstration project

    接著,通過對生物質中熱值氣中試試驗系統的多次改造和反復試驗,了解了氣內溫度場分佈,得出了溫度、物料、抽氣方式等因素對生物質熱解氣的成分、熱值和產氣率影響的一些基本規律,並進行了初步的焦油催解試驗和煤氣燃燒器的熱力特性、燃燒特性試驗,為面向工程應用的集中供氣示範項目提供了必要的設計和運行依據。
  5. Abstract : in this article, it is introduced that a method of rooting has been successfully used in stabing the base of stockhouse of grain, in order to effectively stop sinking and cracking and extend the lifetime of those buildings, which do not have firm base

    文摘:針對浙江省奉市糧食局米廠大米車間、糧庫基礎托換和鍋房基礎加固工程,成功地應用樹根樁基礎托換技術,使沉降和縫得到有效控制,危房再現使用價值。
  6. The catalytic converter can also be destroyed by excessive engine vibration

    發動機的過度震蕩也會造成催裂化爐的毀壞。
  7. If a catalytic converter suffers road damage , the monolith inside can be cracked

    如果催裂化爐在運輸過程中遭受損壞,它裏面的塑膠製品就有可能被擠
  8. When the exhaust paste has hardened small pellets can break away and shoot into the catalytic converter

    當廢氣漿糊幹了以後,它會變成小碎片並且射進催裂化爐里。
  9. A monolith is usually broken on impact with an object or when it experiences a sudden change in temperature

    由於擠壓或天氣的突變,催裂化爐里的塑膠製品會經常破
  10. Safety assessment of vertical furnace tube for catalytic cracking unit

    裝置立式加熱管評定
  11. The company owns advanced middle frequency furnace, compound centrifugal casting machine, precise and complete metal cutting equipment and advanced and modern quality measurement and control means

    本公司擁有先進的中頻電、復合式離心澆鑄和精密齊全的金屬切削設備以及先進的現代質量測控手段,生產的合金軋輥具有輥面度高、強度大、耐磨性能好、耐熱、抗剝落等特點。
  12. Series of high pressure thermocouples thermalresistances and thermowells, the thermocouple take the form of spring - loaded, of which protective tube and flange are forged of special alloy, as well the thermowell are formed with bar stock drilled. more further, theconnecting between thermowell and flange can be compressed with tapered thread and the groove at the lower end of flange can be welded with argon arc. these thermocouples are usually used in high equipments of hydrogen cracking device, cracker and vaporizer etc for pressure - resistant in over 30 mpa, operating temperature from 0 up to 800

    系列高壓熱電偶阻及套管,熱電偶採用彈簧壓著式,保護套管和法蘭選用特殊合金材料鍛造,套管採用棒料整體鉆孔加工而成,與法蘭連接處以錐管螺紋配合併與法蘭下端渠槽處用氬弧焊接,耐壓30mpa ,使用溫度0800 ,可長期使用在加氫裝置解裝置,氣等高壓設備中。
  13. The defect of crack in the engine block of 8170 diesel engine has beem researched and analyzed, which can be solved and avoided through the following measures : optimizing the structure of engine block casting, improving alloying technology, perfecting pouring process and adopting normal inoculation before furnace and metal - stream inoculation during the period of pouring

    摘要對8170缸體紋缺陷進行了探討分析,通過優鑄件結構,改進合金工藝,完善澆注工藝以及隨流孕育與前孕育工藝相結合等措施,使紋缺陷解決。
  14. Abstract : during construction of the capital international airport ' s garage building project, the c50 and over c60 high performance concrete has been adopted for its construction. for the aim of 1, to get a maximum reduction of cement comsumption 2, to lower the concrete ' s hydration heat 3, to reduce concrete ' s shrinkage and cracks, and 4, to promote concrete ' s performance, a high quality chilled blast furnace superfine slag has been adopted as an admixture. furthermore, the adoption of some other minerals as the admixtures to get a high performance concrete has been carried out. as a result, these procedures and operations would have developed considerably the potential activity of concrete, and eventually the multiple performance and multiple function of concrete would have been improved and promoted. in conclusion a good result has been achieved in practice

    文摘:首都國際機場停車樓工程中,採用c50及c60以上高性能混凝土,為最大限度減少水泥用量,降低水熱,減少收縮與縫,提高混凝土的性能,優選了有效成分含量高、質量好的水淬高礦渣磨細后單獨摻用,或再與其他礦物組分復合作為高性能混凝土的摻合料,以充分發揮礦渣的潛在活性,從而使混凝土的多項性能得到極大的改善和提高,並在實際應用中取得了良好的效果。
  15. During construction of the capital international airport ' s garage building project, the c50 and over c60 high performance concrete has been adopted for its construction. for the aim of 1, to get a maximum reduction of cement comsumption 2, to lower the concrete ' s hydration heat 3, to reduce concrete ' s shrinkage and cracks, and 4, to promote concrete ' s performance, a high quality chilled blast furnace superfine slag has been adopted as an admixture. furthermore, the adoption of some other minerals as the admixtures to get a high performance concrete has been carried out. as a result, these procedures and operations would have developed considerably the potential activity of concrete, and eventually the multiple performance and multiple function of concrete would have been improved and promoted. in conclusion a good result has been achieved in practice

    首都國際機場停車樓工程中,採用c50及c60以上高性能混凝土,為最大限度減少水泥用量,降低水熱,減少收縮與縫,提高混凝土的性能,優選了有效成分含量高、質量好的水淬高礦渣磨細后單獨摻用,或再與其他礦物組分復合作為高性能混凝土的摻合料,以充分發揮礦渣的潛在活性,從而使混凝土的多項性能得到極大的改善和提高,並在實際應用中取得了良好的效果。
  16. In the light of hydrogen manufacturing coverted furnace tube system ( including conversion tube, gas gathering tube and pigtail tube ) occuring weld fissure during manufacture and installation, the reason of fissure is analized. the repair plan and specific repair measures are recommended

    針對制氫轉管系(包括轉管、集氣管、豬尾管)在製造安裝過程中出現焊接紋的原因進行了分析,並介紹了缺陷的修復方案和具體修復措施。
  17. Through experimental detection methods of macro inspection, chemical composition analyzing, mechanic performance testing, micro metallography analyzing and x ray diffraction, the blowout reasons of low - temperature superheater tube were analyzed in the process of boiler operation

    摘要通過宏觀檢查,學成分分析,機械性能測試,金相檢驗和x射線衍射等試驗檢測方法,對鍋運行過程中低溫段過熱器管爆原因進行了分析。
  18. Abstract : a preliminary investigation was made on hearth damage of a number of furnaces in china, and the analysis and discussion are presented for reasons of hearth damage in this paper. the main reasons of ring crack of the hearth are : 1. improper physical and chemical properties of baked carbon bricks. 2. the thermal stress existing in carbon bricks, alumina bricks and the furnace shell. the formation of the ring crack aggravates the abnormal erosion of the hearth

    文摘:結合鞍鋼2號和7號等高和2號高的調查結果,對國內部分高缸破損情況進行初步調查,對缸破損原因做了初步分析和討論,認為造成我國高缸環形斷的主要原因是由於碳磚自身物性能差以及缸碳磚和高殼之間的熱應力;環的出現加劇了缸的異常侵蝕。
  19. Furnace are broadly used in various of large - scale ethylene device, such as qilu, yangzi, jinshan, maoming and guangzhou petrochemical andso on, and which performances are beyond the same productsamong the world

    一現狀我公司生產的乙烯專用cot熱電偶廣泛應用於魯揚子金山茂名廣石等大型乙烯裝置中,性能
  20. For safety s sake, he took a routine check around his apartment and when he got to the kitchen, he heard a squeaky sound coming from the gas pipe leading to the stove. he checked it carefully and found that the pipe had a break

    當他走到廚房時,突然聽見灶的液石油氣管線處發出吱吱的響聲,仔細察看之下,才發現管線有一處縫,瓦斯正往外不斷泄漏。
分享友人