裂變能級 的英文怎麼說

中文拼音 [lièbiànnéng]
裂變能級 英文
fission level
  • : 裂動詞[方言] (東西的兩部分向兩旁分開) open
  • : 能名詞(姓氏) a surname
  • : Ⅰ名詞1 (等級) level; rank; grade 2 (年級) any of the yearly divisions of a school course; gra...
  • 裂變 : [核物理] atomic fission; fission; nuclear fission
  1. Through the experimental research, we think : the technological capacity of fiberglass asphalt macadam if weaker than asphalt macadam, however, if use elasticized capacity to solve blending technological problem. adjust the breed of fiber silk, extend its diameter, its paving capacity is still worth exploring, asphalt - rubber macadam structure lager have good deformed - become capacity and crazed - resistance capacity, small gap rate. good water - resistance capacity, good hot - stability and simple construction technology. therefore. pitch rubber spall is a good cover material which is suitable for the second class or lower whose asphalt pavement has split open because of fatigue. and is the good structural measure of preventing half - rigidity grass - roots unit shrink - rift reflecting. pave a thin layer of pitch rubber spall between asphalt - type pavement layer and half - rigidity basic level, although the cost of building is higher than paving togongbu in the middle, the construction technology, crazing - resistance and water - resistance are better than togongbu, not only could reduce greatly the reflex of half - rigidity grass - roots unit material, long then the use lifespan of pavement, but also it is possible to reduce suitably the thickness of asphalt mixture layer, though the cast of building in the early days becomes more, in the long - term opinion, it have fully important technological and economical significance

    通過試驗研究認為:玻璃纖維瀝青碎石的技術性不如瀝青碎石好,但路用彈性性較好,如解決拌和工藝問題,調整纖維絲的品種,增大其直徑,其路用性仍值得探討,瀝青橡膠碎石結構層具有形性和抗良好,空隙率小,防水性好,熱穩定性較好,施工工藝簡單的特點,因此,瀝青橡膠碎石是二及二以下公路因疲勞而開的瀝青路面的良好罩面材料,也是防止半剛性基層收縮縫反射的良好結構措施,在瀝青類路面面層和半剛性基層之間夾鋪瀝青橡膠碎石薄層,雖然造價比夾鋪土工布高,但其施工工藝,抗和防水性均優于土工布,不僅可以大大減少半剛性基層材料的反射縫,延長路面使用壽命,而且可適當減薄瀝青混合料面層的厚度,雖然初期造價有所增加,從長遠來看,具有十分重要的技術和經濟意義。
  2. This paper researches the basic statistical rule of oil - gas dynamic system from the systematic theory, combining with the common characteristic and structure characteristic of oil - gas dynamic system, taking the design requirement of oil field development programming into consideration, by using of functional simulation principle ( including nn method, differential simulation method ) and historical data of oil field, establishes the in - out conjunctional relationship of dynamic index of oil field development, and researches the two level index prediction of development dynamic with both oil field and oil production plant on the basis of the in - out conjunctional relationship. furthermore, this paper analyzes the " decision - making variable ", " object " and " restriction terms " by the optimization theory and set up several optimal models which compose the oil field development programming, it is following : optimization model of the production composing ( solving the optimal composing of each subentry production and cor responding cost, workload, including the onshore thin oil production, the heavy oil thermal process production, tertiary oil recovery production, and the offshore production ) ; optimization model of measure production structure ( determining the optimal composing of each measure production and measure workload, which is composed of fracture, acidulation, capital repair and so on ) ; optimization model of the production distraction ( optimal distribution of the whole oil field production to each oil production plant ) and the integrated development programming model of oil field

    本文從系統理論出發研究油氣動態系統基本統計規律,結合油氣動態系統的一般特點,結構特點,兼顧油田開發規劃設計的要求,利用功模擬原理(含神經網路方法、微分模擬方法) ,依據油田歷史數據,建立了油田開發動態指標間的輸入輸出關聯關系,並在此輸入輸出關聯關系的基礎上研究了油田及採油廠兩的開發動態指標預測,同時利用最優化原理,在分析「決策量」 、 「目標」及「約束條件」的基礎上建立了多個構成油田開發規劃的「優化模型」 ,這些優化模型包括:產量構成優化模型(解決陸上稀油產量、稠油熱采產量、三次採油產量、海上產量及對應的成本、工作量的最優構成問題) ;措施產量結構優化模型(解決壓、酸化、大修等各項措施產量及措施工作量的最優構成問題) ;產量分配優化模型(將油田的產量最優地分配到各採油廠)以及油田綜合開發規劃模型。
  3. According to the recorded full process fracture curve, the paper calculated and compared the fracture toughness ( kic ), the fracture energy ( gf ) and crack tip opening displacement ( ctod ) of the different strength grade boulder concrete and crushed stone concrete, it is found that the maximal load ( fmax ) and the fracture toughness ( kic ) of boulder concrete and crushed stone concrete increase when the strength of them increases, so does the fracture energy of boulder concrete, but the fracture energy of crushed stone concrete does n ' t obviously increase when it ' s strength increases. the crack tip opening displacement ( ctod ) of all specimens chang less when the strength of concrete increases, so it is concluded that the location of the axle in the ligament of the specimens is relatively stable

    根據記錄的全曲線,計算了不同強度等的卵石混凝土、碎石混凝土的斷韌度k _ ( ic ) 、斷g _ f以及縫的尖端開口位移ctod ,比較了不同強度等卵石混凝土及碎石混凝土的斷韌度k _ ( ic ) 、斷g _ f以及縫的尖端開口位移ctod的關系,發現卵石混凝土、碎石混凝土的荷載峰值fmax 、斷韌度k _ ( ic )隨強度增加而增加,卵石混凝土的斷g _ f隨強度增加而呈增加趨勢,碎石混凝土的斷g _ f隨強度增加化趨勢平直,增勢不明顯。
  4. And it investigates the appearance condition ( including joint, crack, eroding, corrosion, braking pole device rupture, crane - girder ' s gnawing railway and so on ) of the whole crane - girder system on the spot, at the same time, it also actually examines the stress of the beam, chemical ingredient, distortion and railway excursion, etc. through sampling, and based on the actually examined results, it checks and calculates the carrying capacity of crane - girder system. then, based on the investigating on the spot and the calculated result, it discusses the mechanism of fatigue failure of the upper part of welded steel crane - girder, analyses the reason of steel crane - girder in the high - frequency emerging the fatigue crack, institutes the strengthened method of damaged steel crane - girder of accurate packing up workshop of the primary mill plant. finally, it presents some advice and suggestions for the repairing and strengthening method of fatigue crack of upper part of steel crane - girder in the high - frequency

    針對包鋼初軋廠精整車間鋼吊車樑上部區域出現縫這一問題,本文首先綜述了國內外關于焊接鋼吊車樑上部區域疲勞縫的研究現狀;其次對整個吊車梁系統的外觀情況(包括連接、縫、腐蝕、銹蝕、制動桿件斷、吊車啃軌等)進行了現場調查,抽樣實測了梁的應力、化學成分、形及軌道偏移等,根據實測結果,對吊車梁系統的承載力進行了驗算;然後,根據現場調查及計算結果,探討了焊接鋼吊車樑上部區域疲勞破壞的機理,分析了重工作制鋼吊車梁出現疲勞縫的原因,制定了初軋廠精整車間破損鋼吊車梁的加固方案;最後就重工作制鋼吊車樑上部區域出現疲勞縫的修復與加固方案提出了一些意見和建議。
  5. Ghg - electrical grade activated silica powder is produced by way of mingling on the basis of electrical grade silica powder. it has activt effect on surface & make silica powder mingled with resin, raise cohesive force between resin & silica powder, raise the water - resestance on the sunface and the compressive strength of pour object, reduce sediment, gradation & split, increase filler of silica powder, and replaced inpoted products on the producing line of imported dry type transfomer & high tension mutual induc tance equiment, it has been the best pouring insulate materual in electrical trade

    電工活性硅微粉是在電工硅微粉的基礎上進行偶聯化處理而製成,具有表面活性作用,使用硅微粉與樹脂發生交聯,提高樹脂與硅微粉的粘結力和界面增水性,提高澆注體抗沖擊強度,減少沉澱、分層、開現象,增加硅微粉的填充量,在引進的乾式壓器、高壓互感器生產線上已成功地代替了進口產品,成為電工行業理想的環氧澆注絕緣材料。
  6. Due to the inevitable absorption of crystal window, the crystal window will be distorted even burst while the power of high energy laser apparatus is several hundred thousand watt even mega - watt, so the quality of laser beam will be influenced and the laser apparatus will not work properly

    由於晶體材料窗口不可避免的部分吸收作用,對于目前幾十萬瓦甚至兆瓦的高激光器來說,晶體窗口會產生熱畸甚至炸,從而影響輸出光束質量甚至使激光器根本無法工作。
  7. The dependence of the electron in 4i _ ( 13 / 2 ) level on the measured temperature and the radiative transition property of different stark sub - level were discussed

    討論了~ 4i _ ( 13 2 )電子布局隨測量溫度的化以及不同stark劈態電子向下輻射躍遷的特性。
  8. The paper made up a flexural experiment with six pieces of composite slab. during the every step of load exerted, the paper recorded the strain of cold - form steel deck and concrete, deflection, crack, slide, ultimate bearing capacity. by changing the thickness of cold - form deck, thickness and strength of concrete, amount of steel stud and other parameters, the paper discussed the behavior of loaded composite - slab

    本文進行6塊組合板的抗彎性試驗,測試各荷載下壓型鋼板及砼應、組合板撓度、縫、板端滑移、組合板抗彎極限承載力;通過壓型鋼板厚度、砼板厚度、砼強度等、栓釘數量等幾個參數的化,探討組合板在荷載作用下的內力、形情況。
  9. It is possible for the terminal activity faults to penetrate to the quaternary, but their scale is generally small and the penetrating distance is short, therefore, they can not induce earthquakes on a large scale. the remote sense images of last thirty years in daqing region show that the linear tectonics have not changed remarkbly, in the meantime, the earthquake timing figure shows that the probability of the faults inducing earthquakes, which ms is no less than 5, is little, though some terminal active faults have penetrated to the quaternary

    晚期活動斷有可斷至第四系,但規模小,延伸的距離短,不會引發大規模地震,遙感解譯分析表明, 30多年來衛星遙感影像顯示的大型線性構造並無明顯化;另外結合大慶地區地震時序圖認為,晚期活動斷即使斷至第四系,其活動引發5以上地震的可性也極小。
  10. As to the paramagnetic ergag, the whole maganetization is zero. the crystal energy levels will split further when the magnetic field is parallel to the especial four directions. we - gain the according wave function and the magnetization changing with the magnetic field

    考慮了外磁場沿晶體四個方向磁化時,晶場的進一步劈以及得出了其相應的波函數,從而分析了不同磁化方向磁化強度隨外磁場的化關系。
  11. Before rock failure, it is found that ae distributed densely, and the coming fracture will occur in the density center of high magnitude events, and ae ratio of frequency grows greatly. these precursors can be presented by the change of b value, a t value and the contour of v value. prefab crack systems in the specimen will affect the fractures hi rocks

    關于巖石破過程中一些物理量的化,發現在巖石破前,主破發生的區域先出現大聲發射的密集分佈;在巖石加載的臨界狀態,大的聲發射數量大量增加;在接近臨界時,大聲發射事件在失穩前頻度突然加快。
分享友人