裂隙分支 的英文怎麼說

中文拼音 [lièfēnzhī]
裂隙分支 英文
crack branching
  • : 裂動詞[方言] (東西的兩部分向兩旁分開) open
  • : 名詞1 (縫隙; 裂縫) crack; chink; crevice 2 (空閑) gap; interval 3 (漏洞; 機會) loophole; op...
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • : Ⅰ名詞1 (分支; 支派) branch; offshoot 2 (地支) the twelve earthly branches3 (姓氏) a surname...
  • 裂隙 : crack; crevice; fracture; cleftiness; fissure; slifter; crevasse裂隙冰川 crevassed glacier; 裂隙...
  1. As the increase of domestic high - rise buildings, more and more deep foundation trench supporting constructions have come into existence. among the general geographical condition of the urban district in qingdao, most of regions, which mainly consist of strong de composed rocks, are in quite good condition. except for the sandy soil and oozy soil along sea sides. but the development of rock cracks and breaking zones and unstable lamprophyre still exist, so blasting is needed during constructions of foundation trench. blasting have bad influence on the stability of slopes. moreover. the slope - liding has happened for several times, so the engineering project of foundation trench attracts more attention of people

    隨著國內高層建築的發展,深基坑護工程越來越多,綜合青島市區的地質狀況,除海邊有砂性土及淤泥軟土外,大部地域巖土條件相對較好,多以強風化巖為主,但巖石發育,間或有斷帶和穩定性極差的煌斑巖穿插其中,基坑施工時需要爆破施工,對邊坡的穩定造成了不利影響,加之連續出現的幾次滑坡失穩事件,基坑護工程越來越引起了各方面的重視。
  2. The hydraulic fracturing of rock mass is one embranchment of the fissured rock mass seepage - stress coupling research. up to now study on this problem is just in its initial stage, lots of basic theoretical problems should be researched more deeply

    巖體水力劈問題是巖體滲流?應力耦合研究的一個,對於它的研究尚處于初始階段,許多基本的理論問題有待進一步深入研究。
  3. Based on the in - situ measurements of ground pressure and physical and mechanical properties of rocks in guhanshan coal mine, and analysis of minerals composition and fissures in rock, the type of soft rock was determined to investigate the deformation and failure of surrounding rocks and floor heave happened in extremely soft rock roadway in guhanshan coal mine, which provides the basic news for support of rock soft

    摘要針對古漢山礦軟巖巷道圍巖變形破壞和嚴重底膨問題,通過對巷道圍巖進行地應力測量、物理力學性質析測試、礦物成份析和節理調查,確定了底膨巷道的軟巖類型,這為解決軟巖巷道的護問題提供了基礎。
  4. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁混凝土索塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及預應力張拉帶來一定困難;撐系統連接的間變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁縫;索塔施工偏位會引起的承臺和基礎的附加應力,對加勁梁的架設影響大;懸吊結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部體積較大,易產生溫度縫。
  5. Study on the strata and fracture features of surrounding - rocks and the bolting effect in actual mining roadways

    回採巷道圍巖結構與佈特徵及錨桿護機理研究
分享友人