補償級 的英文怎麼說

中文拼音 [cháng]
補償級 英文
compensated stage
  • : Ⅰ動詞1 (修理; 修補) repair; mend; patch 2 (補充; 補足;填補) fill up; add supplement; supply; ...
  • : 動詞1. (歸還; 抵補) repay; compensate for 2. (滿足) meet; fulfil
  • : Ⅰ名詞1 (等級) level; rank; grade 2 (年級) any of the yearly divisions of a school course; gra...
  • 補償 : compensate; make up; make up for; make it up to sb. ; make sth. good; compensation; offset
  1. The main computer is programmed under windows, while the assistant computer is programmed under dos. the last, based on the idea of module - structure, the software of the testing system are designed, thus this software system is compatible and transplantable to design again. the experiment of measuring principle is taken : take the xy flat of lathe as the parallel - pole device and adjust the angle of sensor, the rotating - probe can test the felloe mould in scanning way

    藉助虛擬儀器的思想,對測控系統進行了設計:採用光柵尺、光電編碼器測量可動部件的運動量,解析度高、誤差小;採用細分驅動的步進電機裝置,控制性能好;系統實施環境溫度的檢測、,提高了檢測精度;基於兩微機組建測控系統:主機為人機界面,採用windows編程,從機用dos編程,實時性好;軟體設計採用兼容性和移植性好的模塊式結構,便於二次開發。
  2. Set the shutter by pressing and holding the exposure - compensation button, which also bears a small time value ( tv ) label, and turn the up / down dial until the desired speed, in numeric half steps, appears in the viewfinder or lcd

    按住曝光鍵+ / - ,它也肩負著tv功能,調節主控撥盤直到需要的速度,速度以1 / 2調節並在取景器或lcd屏中出現。
  3. The author has finished the following several jobs in core of the centre : 1 ) the active compensation method based on bang - bang control was put forward to realize the wide range current transformer. the method converts the complex statement space to i / o description by the two - stage current transformer. with the compensation method, the accuracy of 0. 2 grade current transformer can be improved to less than the 0. 1 grade standard at 100 % rating when the primary side current is changed from 2 % to 120 % of the rating

    圍繞這一工作核心,作者完成了以下幾項工作: ( 1 )以實現寬量程電流互感器為目標,提出了基於bang - bang控制的有源方法,採用雙電流互感器,將復雜的狀態控制分量轉化為偏差控制,該方法結構簡單,調試方便,有源器輸出電流小,可以將0 . 2的電流互感器經過后提高到一次電流從額定值的2變化到120時,測量誤差不超過一次電流額定值100時準確度為0 . 1的測量標準。
  4. F reviewing and approving compensation arrangements relating to dismissal or removal of directors and senior management for misconduct to ensure that such arrangements are determined in accordance with relevant contractual terms and that any compensation payment is otherwise reasonable and appropriate

    F檢討及批準有關因董事及高管理人員行為失當而遭解僱或罷免其職務的安排,藉以確保該等安排乃按相關合約條款厘訂,而任何款項亦屬合理適當
  5. ( 3 ) according to compensation benefit formation cause and scientific, rational, impartial, equitable distribution principle, put forward distribution project of water supply and generation electricity compensation benefit in the main stream of the yellow river

    ( 3 )根據效益成因分析及科學、合理、公平、公正的分配原則,提出黃河幹流梯水電站效益中的供水和發電效益的初步分配方案。
  6. On the basis of fuzzy matter - element analysis, a fuzzy matter - element model for evaluation of compensation benefits of cascade reservoirs on the mainstream of the yellow river was established by combination with the concept of euclid approach degree

    摘要在模糊物元分析的基礎上,結合歐氏貼近度的概念,建立了基於歐氏貼近度的黃河幹流梯水庫效益方案評價的模糊物元模型,採用主客觀賦權法計算評價指標的權重。
  7. Aiming at the compensation benefits calculation combined with development layout of the yellow river mainstream cascades is now taken into account the dynamic characteristic of different level years, the compensation benefit simulation model of the yellow river mainstream cascade reservoirs is adopted to calculate the power generation compensation benefits of the yellow river upstream run - of - river power stations in three level years of 2000, 2010 and 2020

    摘要針對以往效益的研究都是靜態計算而言,本文結合不同水平年黃河幹流梯的滾動開發規劃,考慮不同年代效益的動態特性,採用黃河幹流梯水庫效益的模擬模型,計算了2000 、 2010以及2020三個水平年黃河上游徑流式梯電站的發電效益。
  8. Built up the optimal compensation regulation model of cascade hydropower stations for water resources system in the main stream of the yellow river, adopted poa method to solve optimal model in order to analysis water supply and generation electricity compensation benefits, discussed its distribution project and implementation countermeasures

    本論文主要針對黃河幹流水資源系統建立幹流梯水庫、電站調節優化模型,採用逐步優化演算法( poa )求解模型,定量分析計算了黃河幹流水量以及電量效益,探討了黃河幹流效益的分配方案和實施對策。
  9. The main results indicate that the levels of executive pay are largely driven by firm size, not by firm performance, and equity - based compensation does not necessarily motivate managers to maximize shareholders ' wealth and improve firm performance, and moreover, the boards works inefficiently in designing compensation contracts for top managers

    主要結論表明香港上市公司的管理效用的水平主要由公司規模決定,而非公司的市場業績;同時以股份為工具的機制也不能有效促進管理層對小股東的利益和公司業績的關注,董事會也未能有效制訂對高經理層的獎勵合約。
  10. We use 256 grey scales which realized in sum way and use color exchange space. each point dynamic color repairing technology fits for full color of led display which is made by using simple green tube or olivine tube. this technology can make the color of led display menu keep the original photo floweriness

    1用演算法實現的256灰度,設計中使用了顏色變換空間, 「逐點動態色彩技術」適合使用純綠管或黃綠管製作的全彩色led顯示屏,該技術使led顯示畫面的色彩能夠保持原圖象的絢麗。
  11. ( 3 ) modeling of the asymmetrical half bridge converter in the thesis, a small average circuit model of asymmetrical half bridge converter power stage is established by method of state space averaging. in term of it, a system model of total converter is founded. the characteristic of stabilization and dynamic is analysed and the compensator is designed basing of it

    ( 3 )不對稱半橋dc dc變換器的建模分析採用狀態空間平均法建立了不對稱半橋變換器功率的小信號平均電路模型,在此基礎上建立整個變換器系統模型,對系統的動態特性和穩定性進行了分析並設計了器。
  12. The voltage ir on core adopts semienclosed insert model. the current element adopts two - stage compensation to have wide load property. the whole plasticenclosed voltage coil. can withstand instantaneous large voltage impulse. the double jewels bearing or the magnetic - propelled bearing can ensure long lifetime. the bipolar aluminium nickel cobalt damping magnet steels have high coercivity, stable magmetic property. the electric function is in accordance with iec521 international standard

    :電壓鐵芯採用半封閉插入式,電流元件採用二使表計具有寬的負載特性。全塑封的電壓線圈能稱說瞬時大電壓沖擊。雙寶石軸承或磁推動軸承確保表計長壽命。
  13. In chapter 2, author points out firstly that the elastic deformation of elastic units of a robot ' s wrist force sensor will be enlarged by the end - effector, the instruments and the work pieces, so the elastic deformation of the sensor will influence the location accuracy or kinetic accuracy of end point of a robot, under the condition of that the robot technology facing the developing of heavy load, light mass and high accuracy. it is discussed respectively that the relationship between the differential kinemics in the sensor ' s coordinate and the location accuracy or kinetic accuracy of the end point. error matrixes of location and kinemics of the end point are presented respectively based on the differential kinemics in the sensor ' s coordinate, and the on - line error compensation methods are introduced subsequently

    第二章首先指出機器人腕力傳感器彈性體的彈性變形經過機器人末端連桿、工具、工件等的放大后,會對機器人末端精確定位和運動產生的影響;然後分別研究了傳感器坐標系內的微分運動與機器人末端工件精確定位、運動的關系;在此基礎上,研究了基於腕力傳感器彈性體微分運動的機器人末端定位、運動誤差的誤差矩陣及其在線誤差方法;基於機器人動力學的機器人末端定位、運動誤差的誤差矩陣及其在線誤差方法;最後,以puma型機器人為對象,給出了基於腕力傳感器內微分運動的機器人末端定位、運動誤差及其在線方法的模擬實例:給出了基於機器人動力學的機器人末端定位、運動誤差及其在線方法的模擬實例;模擬結果表明, 1 )基於腕力傳感器的機器人末端定位誤差在腕力傳感器允許的載荷下可達十分之幾毫米
  14. Release the button and the up / down action shifts to 1 / 2 - stop increment aperture adjustment

    釋放曝光鍵調節主控撥盤以1 / 2調整光圈。
  15. 1 in terms of the delivered bales of which the grade and staple for inspection are one grade inferior than the grade and staple provided by the contract, compensations at the deduction rate provided in the foregoing article 8. 1 and article 8. 2 shall be made

    2如果合同規定品、長度與到岸檢驗品、長度相差2個的棉包數量占該批棉包總數量的比例超過5 %的,除按上述8 . 1 、 8 . 2條款規定的差價率外,還應按全部降棉包合同金額的20 %作為違約金賠給買方。
  16. 2 if more than 5 % of the landed shipment are bales two grades inferior to the contract grade in terms of quality and staple, then in addition to price deduction compensations as in articles 8. 1 and 8. 2, the buyer shall be given extra liquidated damages equivalent to 20 % of the contract value of the total defective bales

    2如果合同規定品、長度與到岸檢驗品、長度相差2個的棉包數量占該批棉包總數量的比例超過5 %的,除按上述8 . 1 、 8 . 2條款規定的差價率外,還應按全部降棉包合同金額的20 %作為違約金賠給買方。
  17. Heat resistant grade compensation lead for fiberglass - 40 200

    表示玻璃絲耐熱導線。
  18. Under strict paygo rules, any extension of the bush tax cuts ? even those, such as the child - tax credit, that are popular with many middle - class americans ? would need to be paid for by spending cuts or higher taxes elsewhere

    根據嚴格的現收現付規則,任何對于布希減稅的延期? ?就算是中產階呼聲很高的減稅方案,比如照顧兒童稅收抵免,都需要精簡開支或者增加其他方面的稅收,以進行
  19. With compensation of signal ’ s time delay from different radiating element by phase shifters, phased - array antenna can control array beam easily. because there are no mechanical devices for rotating beam, the phased - array antenna system can scan everywhere in beam covered areas in millisecand by stepping the phase shifters. it improves the tracking velocity of antenna towards the object, and becomes the development trends of weapon system antennas

    相控陣天線利用移相器信號到達輻射單元時間的差異,從而控制波束方向;天線沒有機械旋轉問題,只需改變移相器的設定值,波束便可以在毫秒內掃描其覆蓋空域內的任何地方,提高了天線對目標的跟蹤速度,是目前武器系統天線的發展方向。
  20. In the early electric market in china, in order to encourage the power plant to supply reactive power and maintain the safe and stable operation of power system as well as give proper pricing signal of reactive power, the old method in which only active power is charged and reactive power is free must be changed

    為調動發電廠參與無功輔助服務的積極性,確保系統安全穩定運行,並給無功電源建設以正確的價格信號,根據發電廠無功輔助服務成本分析和我國初電力市場的狀況,討論了一種無功容量電價加無功電量電價的二部制無功輔助服務電價。
分享友人