補充水系統 的英文怎麼說

中文拼音 [chōngshuǐtǒng]
補充水系統 英文
make up water system
  • : Ⅰ動詞1 (修理; 修補) repair; mend; patch 2 (補充; 補足;填補) fill up; add supplement; supply; ...
  • : Ⅰ形容詞(滿; 充足) sufficient; full; ample Ⅱ動詞1 (裝滿; 塞住) fill; charge; stuff 2 (擔任; ...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : Ⅰ名詞1 (事物間連續的關系) interconnected system 2 (衣服等的筒狀部分) any tube shaped part of ...
  • 補充 : 1 (原來不足或有損失時增加一部分) replenish; supplement; supply; make up; complement; add 2 (在...
  • 系統 : 1. (按一定關系組成的同類事物) system 2. (有條理的;有系統的) systematic
  1. By summarizing and analyzing the geological setting, uranium source, paleoclimate, hydrology, lithologic - lithofacies conditions in the region, it is indicated that the quantou formation in fanjiatun - jiutai area and the qingshankou formation in yangdachenzi area are potential metallogenic prospective areas for in - situ leachable sandstone type uranium deposit in the region, which develop braided channel or delta marginal sandstones, and possess favorable forming conditions of interlayer oxidation zone, and constituting supply - passage - discharge system of abundant uranium source

    綜合研究區域成礦地質背景、鈾源、古氣候、文地質、巖性巖相條件,認為范家屯九臺一帶的泉頭組及楊大城子一帶的青山口組發育辮狀河或三角洲前緣砂體,構成了鈾源供應足的徑排,具有有利的層間氧化帶形成條件,是本區地浸砂巖型鈾礦的有利成礦遠景區帶。
  2. Abstract : by both the external combination of deck coefficient and designed water - line coefficient ? and the in - ternal combination of deck transformation and cross - section area curve transformation ? a new ship line is generated on the condition that cross - section area is the same as the basic ship and designed water line satisfies the need. this method needs not look for any transformation function to finish the change of cross - section area curve. it is a profitable development to the traditional lackenby method

    文摘:本文通過甲板面面積數和設計線面面積數的外層疊代、甲板面變換和橫剖面面積曲線變換的自身內層疊代,在保持橫剖面面積曲線不變的條件下,獲得滿足設計線面數變化要求的新船型,而不必尋找橫剖面線的變換函數來實現設計線面的變換,本方法是對傳的母型船變換的一個有益
  3. The scheme embraces four projects, namely ( 1 ) to build up sluices at anqiu bridge and nanzhou bridge ( and the one at anqiu bridge is the first choice ) so that pollutants can be from entering the lake ; 2 ) as a necessary accessory for the above project, to supplement water capacity from changdang lake as a strategic water source into the protection program, and culvert - pipe plan is recommended from two other alternatives through systematic analysis ; 3 ) to carry out comprehensive realignment for some reed regions which are located at the entrances of the lake, and to develop a wetland ecosystem mainly with some reeds ; and 4 ) to set up a green protection belt right round the lake, including planting reeds at lakebeach, building forest belt, developing bases of green foodstuff and disposing sludges in the lake base

    該方案由4個工程子組成, ( 1 )截污工程:在岸丘橋和南州橋位置各築一節制閘(而岸丘橋工程又是首選工程) ,以封住湖泊兩頭入流,杜絕污染物進入源地的截污工程; ( 2 )引工程:是截污工程的配套工程,利用下游長蕩湖來量,並對3個引工程設想進行了分析,推薦涵管方案,同時將長蕩湖作為該市戰略源地一併納入保護體中; ( 3 )濕地生態處理工程:對進入蕩區前的蘆葦區進行綜合整治,發展以蘆葦為主的濕地生態處理工程; ( 4 )環湖綠色自然保護帶工程:包括建設圍湖蘆葦蕩、環湖林帶、綠色食品基地以及污泥處置。
  4. Supplementary information on 44ws - salt water supply system for penny s bay

    資料- 44ws -竹篙灣海供應
  5. Relief valves and automatic gas shutoff devices for hot water supply systems ; addenda

    供給的安全閥和氣體自動關閉裝置.
  6. When the system finishes water supply, this valve can automatically supplement air into the sealed water pipe, which can be evacuated just to open the valve at the outlet, suitable for the evacuation and freeze - proof system of water supply etc. facilities

    自動氣排空管完成後,該閥可自動空氣進入密封管,將下端閥門打開即可實現管的排空,適用於供等設備的排防凍
  7. Supplementary information on 340ds - port shelter sewerage stage 3 - sai kung area 4 and mang kung uk sewerage

    資料- 340ds -牛尾海污收集第3階段西貢第4區及孟公屋污收集
  8. Rainwater harvesting systems - part 4 : components for control and supplemental supply

    收集.第4部分:控制和供給元件
  9. Supplementary information on 215ds - yuen long and kam tin sewerage and sewage disposal - kam tin trunk sewerage phase 1 and au tau trunk sewers

    資料215ds元朗及錦田污收集及污排放設施錦田污乾渠收集第1期及凹頭污乾渠工程
  10. Abstract : based on the systematic analysis of the shear behavior for r. c. beams, the tests of 11 simple supported beams under the top concentrated loads and the uniform loads are supplemented. the prime variable is shear span ratio, span depth ratio, horizontal web reinforcement ratio and vertical web reinforcement ratio. according to the test results, the working behavior, the prime shear failure modes, the effect of concrete and web reinforcement ( horizontal web reinforcement and vertical web reinforcement ) and other aspects of r. c. beams are analysed. the uniform calculation method for shear capacity of deep beams, short beams and shallow beams for practical is presented

    文摘:在對國內外鋼筋混凝土梁的受剪性能進行較分析的基礎上,了11根鋼筋混凝土簡支短梁在頂部集中荷載和均布荷載作用下的試驗,試驗梁的主要變化參數為剪跨比、跨高比、平腹筋率和垂直腹筋率.根據試驗結果,對試驗梁的工作性能、主要的剪切破壞形態、混凝土項的抗剪作用、抗剪腹筋(包括平腹筋、垂直腹筋)的作用等進行了較為深入的分析,提出了可適用鋼筋混凝土深梁、短梁和淺梁相互協調的受剪承載力的一計算方法
  11. After analyzing in detail the technical difficulties of constructing wams and the requirements of power system operation and control to it, the paper points out that the construction of wams should complement the existing scada ( supervisory control and data acquisition ) under present economic level, and the principle should also be conformed to during the placement of pmus

    分析了構建wams可能遇到的諸如通信、存儲、管理、應用等技術難點;探討了電力運行控制對wams的應用需求;得出了在當前經濟技術平下,構建wams應該考慮與現有scada互為的結論。討論了在wams , scada互中的pmu配置以及數據處理方法。
  12. 8 all records using the format as per attached to register the maintenance details, including the checking and cleansing work carried out to the systems, replacement and addition of the filter medium, replacement of the uv - light bulbs tubes, etc. should be completed and certified by the dedicated staff contractor

    8所有採用隨附格式記錄的維修保養資料須由專責員工承辦商填妥及核證,並存放在處所至少一年。這些資料包括檢查及清潔過濾消毒更換和介質更換紫外光燈泡光管等詳情。
  13. Supplementary information on 125ds - drainage improvement from tung kok wai to san wai, fanling

    資料- 125ds -粉嶺東閣圍至新圍雨排放改善計劃
  14. It is shown from the study results that human being is the origin causing the environmental variation, and the results of environmental variation in turn act on human being, namely, human being discharge co2 to result in the rise in air and water temperatures, and the earth ecosystem makes the air and water temperatures fall down and return to the normal dynamic balance by means of its complementary mechanism

    研究結果表明,人類是引起環境變化的起源以及其變化后的結果又作用於人類,即人類排放二氧化碳引起氣溫和溫的上升,地球生態又藉助其機制使得氣溫和溫下降恢復到正常的動態平衡。
  15. The assimilation experimentation results indicate that after assimilating radar wind field of small spatial scale, mesoscale and small - scale precipitation prediction can be improved and mesoscale and small - scale information which ca n ' t appear by tradition datum can be gained, which is valuable to analyze the mesoscale and small - scale system structure ; the effect assimilating radar humidity field is n ' t obvious, which is perhaps correlation with precipitation types and assimilating time. the results also show that adding radar humidity field to initial condition at initial time can supply the gap of the regular data in reflecting the mesoscale and small - scale systems, strengthen the humidity in the initial field, and eventually help to improve precipitation. the experiment of assimilating radar wind field and radar humility field at the same time shows that vapor transportation and local vapor divergence play more significant role in causing excessively heavy rain than only high wet center

    同化試驗結果表明:同化空間解析度很高的雷達風場后,能改善中小尺度降的預報效果,並且能夠得到常規觀測資料所不能得到的中小尺度信息,對分析中小尺度結構具有重要意義;同化雷達濕度場效果不明顯,可能與降類型和同化時刻有關;而直接在初始時刻加入雷達濕度場,了常規資料在反映中小尺度方面的不足,增強了初始場中的汽,有利於降量的增加;同時同化雷達風場和雷達濕度場的試驗表明,汽的輸送和局地的汽輻合對于產生特大暴雨的貢獻遠大於僅有高濕中心的貢獻。
  16. Supplementary information on 235ds - yuen long and kam tin sewerage and sewage disposal

    資料- 235ds -元朗及錦田污收集及污排放設施
  17. All records using the format as per attached to register the maintenance details, including the checking and cleansing work carried out to the systems, replacement and addition of the filter medium, replacement of the uv - light bulbstubes, etc. should be completed and certified by the dedicated staffcontractor

    所有採用隨附格式記錄的維修保養資料須由專責員工承辦商填妥及核證,並存放在處所至少一年。這些資料包括檢查及清潔過濾消毒、更換和介質、更換紫外光燈泡光管等詳情。
  18. It involves many fields, such as radar ew equipment, radar ew system, modeling and simulation technology, computer technology, software engineering, etc. in the area of mathematics modeling in radar ew, these models have been modified fulfill fidelity and reliability on the base of many years reseach in national key laboratory of electronic warfare ( newl ). system combat effectiveness models had been supplied into this paper. in the area of modeling and simulation, all achievements are full of originality

    在領域模型方面,作者將本實驗室在雷達對抗武器裝備數學建模多年的研究成果進行了總結、歸納和,對模型的逼真度、可信度進行了修改完善,作戰效能評估數學模型;在模擬建模和模擬實現方面,作者將軟體工程和分散式模擬中的先進技術引入到項目中,進行了雷達對抗作戰效能評估需求概念分析、模型抽取、構件化模型實現和分散式模擬設計與集成,模擬模型具有良好的可信度、重用性,模擬具有良好的可擴展性、靈活性、多接入方式,模擬模型和先進的實現技術在國內同行業具有領先平。
  19. However, the large - scale or medium - sized water works in guan zhong zone are independent each other as a self - existent system. being not form a united network, these separated systems ca n ' t cooperate mutually, so that the developed water resource ca n ' t be best used and often be wasted

    然而,長期以來關中地區大、中型源工程基本上是自成、相互獨立,未形成有機的網路聯,不能互餘缺,使已開發的資源得不到分利用,造成了一定的資源浪費。
  20. At last, according to relationship among the average fractal dimension of annual breeding time precipitation, accumulated temperature and crops yield of heilongjiang province, the climatic division and the comprehensive climatic division of precipitation, accumulated temperature of 79 counties and cities were divided by fractal dimension of precipitation and accumulated temperature. at same time, divisional results were combined with the information system. proved that divisional results accorded with fact, the fractal method deeply reflected complicated changes on precipitation and accumulated temperature of heilongjiang provinc and information system had convenient advantage in graphic display

    最後,根據黑龍江省歷年生育期降、積溫的平均分維與作物產量的關,對79個縣市按生育期降、積溫分維的大小分別進行了生育期降、積溫的氣候區劃,以及綜合區劃,將區劃結果與信息有機結合,並證明區劃結果符合實際,分形方法更深刻、全面地反映了降、積溫的復雜變化,信息方便的圖形顯示優點,該區劃結果對原黑龍江省的氣候區劃是有益的
分享友人