裝入孔 的英文怎麼說
中文拼音 [zhuāngrùkǒng]
裝入孔
英文
filling hole-
Filling opening for immersed transformers without conservator, allowing the setting of a level indicator or a protection device. interchangeability dimensions
無存油箱有油標或保護裝置的浸油變壓器的注入孔.互換尺寸The condenser is equipped with an iris diaphragm, a shutter controlled by a lever which is used to regulate the amount of light entering the lens system
聚光鏡裝配有瞳孔膜,那是一個有貢桿控制的快門,用來調節進入鏡頭系統的光量。Packaging - light gauge metal containers - aperture for plug - in rel plastic closures
包裝.輕型金屬測量容器.插入式rel塑封閉裝置的孔徑The recovery of atmospheric light oil yield of atmospheric in the northern atmospheric distillation tower of shenghua teaching & test factory, science and technology group of china university of petroleum has been increase by about 4 or 5 percent through the following methods : changing the tray perforation of atmospheric tower, adjusting the amount of stripping steam and the outlet temperature of the atmospheric heater and merging atmospheric excess vapor into 3rd atmospheric drawn - stream to keep the fractions content of bottom oil below 5 % before 350
摘要中國石油大學科技集團勝華教學實驗廠北常減壓蒸餾裝置換煉勝利管輸油后,通過改變常壓塔塔盤開孔率、調節常壓塔汽提蒸汽量和常壓爐出口溫度、常壓過汽化油併入常三抽出線等措施,控制常壓塔底油350前餾分含量小於5 % ,使常壓輕質油收率提高約4 % ~ 5 % 。Measurement of fluid flow by means of pressure differential devices inserted in circular cross - section conduits running full - orifice plates
用插入圓截面管道中的壓差裝置測量流體流量.節流孔板Measurement of fluid flow by means of pressure differential devices inserted in circular cross - section conduits running full - part 2 : orifice plates
用插入滿載的圓截面管道中的壓差裝置測量流體流量.第2部分:節流孔板Gd linear ball bearings ( drawn cup recirculating ball linear bearings ) are made of punched and quenched outer ring and plastic cage with a set of rolling ball
Gd直線運動球軸承(沖壓外圈循環式直線運動軸承) ,由一沖壓且淬硬的外圈和帶一組鋼球的塑料導引保持架所構成一完整的裝配單元,可直接壓入座孔內。Mounting hole layout socket for nf l 58 - 335 plug - in relays
Nf插入式繼電器用安裝孔布置插口Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating
箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。Mount restrictor bar into the restrictor bar groove of upper die, mount adjusting bolt for restrictor bar into the bolt hole in the restrictor bar, then mount lower press block, upper press block
在上模節流棒槽內裝入節流棒,將節流棒調節螺栓裝配進節流棒的螺絲孔中,再裝配上壓塊。Detail specification : mechanically actuated zero and low insertion force sockets for pin grid array devices with 2. 54 mm 2. 54 mm 0. 1 " 0. 1 " spacing for use in electronic equipment
詳細規范:用於電子設備的2 . 54mmx2 . 55mm間距針式格子排列裝置的零和低插入力機械啟動插孔Abstract : the transformation of the flowmeter and the control valve for water and oil phase flow, the control devices for oil - water phase ratio and blast hole charge and other control devices has eliminated the distinct dificiencies in the quality control of on - site mixed loading car of emulsified explosive and realized its automatic control so as to improve the quality of the products of emulsion and emulsified explosive and their blasting effect
文摘:從水相和油相流量的流量計、控制水相油相流量的流量控制閥、控制油相水相配比的配比控制裝置、炮孔裝藥量控制裝置以及其他控制裝置的改造入手,改變原有乳化炸藥現場混裝車質量控制上存在的明顯不足之處,實現乳化炸藥現場混裝車的自動控制,提高了生產乳膠及乳化炸藥的質量和爆破效果。Shell manhole series shall be set on lower tank shell course for people and going out of the tank. the rainforcing plate of manhole is out of socpe supply. you want. acorrding to user drawing, our company can manufacture any type of the products user want
罐壁人口裝于油罐下部,人可以由此進入,本產品出廠時不帶加強版,如需其他標準或非標人孔,只需提供標準和紙圖,我公司即可生產。Align the assembly line on distributor connection rod with the timing line on the shell of distributor, then plug distributor along installing pore into distributor socket until the connecting rod of distributor well connected to the connection groove
將分電器連軸節上的裝配線與分電器殼體上的正時線對準,然後將分電器沿安裝孔插入分電器座內,到分電器連軸節與聯接槽順利卡和為止;Microphone jacks are available at both front and rear panels, which is not only tidy, but also easy for your intallation
前後板均設有麥克風輸入插孔,從整體美觀到工程安裝都極為方便。A solid - liquid fluidized bed has been designed and installed, which will be used in the heat exchanging and descale field. the experimental study for distributor design was carried out and the particles distribution in the tubes of the solid - liquid fluidized bed under different operating conditions was studied by using the ccd measure system. experimental results show that heterogeneous pores distributor which was arranged in the inlet chamber of the solid - liquid fluidized bed can improve the nonuniform distribution of particles in the pipe bundle under high flow rate. the nonuniform decreases by decreasing the mount of pore, but the solid holdup decreases too. the particles distribution is influenced by the position of the heterogeneous pores distributor
實驗結果表明:在液固循環流化床進口段安裝可調節高度的變孔徑分佈板,能在較高的流速下,較好的改善固體顆粒在管束中的不均勻分佈;開孔率越小固體顆粒在管束中的分佈越均勻,但管束中粒子的平均固含率也越小;分佈板的安裝高度對顆粒的分佈有很大的影響,在實驗范圍內分佈板的安裝距離管束入口處越遠,顆粒在管束中的分佈越均勻。Inspection devices for yards and buildings. gully tops and manholes tops with a clear opening equal to or greater than 200 mm. requirements. dimensions. tests
院內和建築物用排水裝置.陰溝蓋和陰溝檢修孔蓋其入口等於或高於200mm .尺寸.試驗In joist ' s temporary fixation, if temporary bolt and drill nail are used, amount of them should be calculated as flowed specification : the amount should be no less than 1 / 3 of all holes ; at least, two temporary bolts should be used ; amount of drill nail should be no more than 30 % of temporary bolts bolted ( grade a, grade b ) hole shouldn ' t be fixed with drill nail
桁架臨時固定如需用臨時螺栓和沖釘,則每個節點處應穿入的數量必須由計算確定,並應符合下列規定:不得少於安裝孔總數的1 / 3 ;至少應穿兩個臨時螺栓;沖釘穿入數量不宜多於臨時螺栓的30 % ;擴鉆后的螺栓( a級、 b級)的孔不得使用沖釘。Surface, the easliy wear and tear parts use grinding - resistant material, extruding part use variable cylinder diamethe extruder with compact structuures, transmission gear with hard gear ter detachable pitch, great extruding p0ressure, high vacuum degree, low loading capacity ( electricity - saving more than 25 % than the same product ). it reaches advanced domestic level andcan replace imported items. it is suitable to produce hollow brick with high hole ratio, coal waste rock hollow bricks, shale hollow bricks, prower coal ash hollow - bricks. the extruder won the scienttific and technological progress pride of the lst building material scientific and techniques achievement exhibition in jiangsu province and the golden prize of the mational brick and tile energy - saving lxln achievement
該機結構緊湊、傳動齒輪均系硬齒面,易損件採用耐磨材料、擠出部分採用變缸徑、變螺距、擠出壓力大、真空度高,裝機容量低(比同類產品節電25 % ) ,性能優于進口同類設備,適用生產高孔洞率空心砌塊、煤矸石、頁巖、精煤灰空心磚及各類高摻入量粉煤灰磚和低塑性原料磚,該機在江蘇省首屆建材科技成果展覽會科技進步獎; 94全國磚瓦節能四新成果展覽會金獎,西安國際博覽會金獎。Glucose oxidase ( god ) was immobilized onto controlled - pore glass ( cpg ) via glutaraldehyde activation and packed into a channel
酶柱里裝入固定了葡萄糖氧化酶的多孔玻璃,化學發光試劑柱里裝吸附了!分享友人