裝線工 的英文怎麼說

中文拼音 [zhuāngxiàngōng]
裝線工 英文
wireman
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  1. Craft design for reconstructing project of car coating line

    客車塗改造藝設計
  2. Dalian jialin equipment manufacture co., ltd is engaged in developing, designing, manufacturing and installing auto conveyors, assembling line ( roller - type, strap type, chain - type, chain belt type, screw - type, assemble mechanical hand, hydraulic elevator ) and packing automatic assembly line ( automatic case back - sealing machine, automatic case folding & sealing machine, high speed case opening machine, wrapping machine, automatic pallet, bundler ) of complete sets of equipments

    大連佳林設備製造有限公司是一家生產廠成套自動化輸送、組(滾筒式、皮帶式、鏈式、鏈板式、網帶式、螺旋式、組機械手、液壓升降臺等) ;廠成套自動化包(紙箱自動成型封底機、全自動折蓋封箱機、全自動高速開箱機、箱機、全自動托盤碼垛機等)的開發、設計、製造、安等一條龍服務的專業廠家。
  3. There was the episode during the 1970 recession when takahashi shifted assembly-line workers to door-to-door selling to bring down inventory and cut costs.

    在1970年經濟蕭條時期,有一個小插曲:為了減少庫存和降低成本,高橋把總人調去挨門挨戶地搞銷售作。
  4. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    建設部《房屋建築程質量保修辦法》對房屋建築程作了最低保修期限的規定:其中1 、地基基礎程和主體結構程,為設計文件規定的該程的合理使用年限; 2 、房屋防水程、有防水要求的衛生間、房間和外墻面的防滲漏,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣管、給排水管道、設備安為2年; 5 、程為2年。
  5. Simulation - based planning of production line

    轎車生產藝規劃的模擬系統設計
  6. Xingtao is specialized in producing the products of lace, string or tape, decoration and chemical fiber fabric series, etc … … the company brings in all kinds of materials and adornment for home textile, garment, curtain such as hook weaving, thread woven lace, rope tape, fringe, cushion rope, trim rope, band rope, beads lace, hand - making lace, etc

    本公司專業生產花邊,繩帶,藝品以及化纖面料等,產品主要有鉤編,織花邊,排順,繩帶,吊球,掛球,掛穗,靠墊繩,滾邊繩帶,飾繩,三股繩,鑲邊繩,訂珠花邊,手花邊,織帶,珠子帶,簾和家紡輔料等,花色品種繁多,主要適用於家紡,服,窗簾等的飾。
  7. During the course of the manufacture for packaging 2000 pixel hgcdte irfpa wafer, some crucial techniques are solved, such as the design of the button stem structures with inclined dragging wires applied in cryogenic platform, the optimization of long linear irfpa detector ' s signal wires layouts, the implement of a fanout board having thin film gold metalization for defining the required electrical conductors and a method of hermetically sealed vacuum enclosure of large dimension windows, etc

    在用於封2000元碲鎘汞焦平面晶元的分置式微型杜瓦研製中,詳細闡明了一種焦平面晶元其載面為斜拉式支撐結構的設計,實現了探測器外引功能的布優化及其輸出引藝改進,並提出了一種大尺寸高氣密光學窗口的焊接方法等關鍵技術。
  8. Receive details about paper processing and treatment machines, instruments and boot washing plants in addition to offers on shoe production or sole cleaning devices on the homepage of hardo maschinenbau gmbh

    是一家鞋生產范圍內,以及加藝流程、安和鞋修理范圍內可靠的業型企業。
  9. The company mainly manages : each kind of import, domestically produced stone, the different molding, the decoration craft board, the sculpture in the round, the relief, the line carve and the city botanical garden sculpture, the ancient temple, the image of buddha, the character, the animal carving, center western - style place and so on memorial park, western - style construction carving, instalment as well as glass fiber reinforced plastic

    公司主要經營:各種進口,國產石材,異型材,藝板,圓雕,浮雕,雕及城市園林雕塑,古寺廟,佛像,人物,動物之雕刻,中西式墓園,歐式建築之雕刻,安及玻璃鋼等產品。
  10. The job responsibilities of the various people involved in the assembly line process

    不同的人對序承擔的責任。
  11. This article angle has analyzed the higher professional technical education from cbe / dacum " the electrical control technology " the curriculum ability localization, according to the higher professional technical education " the electrical control technology " the curriculum ability localization, point out the insufficiency and flaw existed in commonly used control electric appliance choice, electrical pilot wire road map, electricity control system installment, wiring craft, electrical control line fault diagnosis system approach, new starting velocity modulation equipment and control circuit, control circuit and main circuit aspect and so on

    摘要本文從cbe / dacum角度分析了高職「電氣控制技術」課程的能力定位,根據高職「電氣控制技術」課程的能力定位,指出了現行高職「電氣控制技術」教材在常用控制電器選擇、電氣控制路圖、電氣控制系統安、接藝、電氣控制路故障診斷的系統方法、新型起動調速設備及控制電路、控制電路與主電路的連接等方面存在的不足和缺陷。
  12. The reconstruction project of huanghai bus painting line completely

    黃海客車塗改擴建程竣
  13. The wages of assembly - line workers and machine operators are included in this cost classification

    上的資和機器操作人員的資包括在內。
  14. The research method and theory is still wick about the foundation of the loading and unloading equipment selection, the efficiency simple loading and unloading equipment, the efficiency of the loading and unloading line, the summary efficiency of all loading and unloading lines on port, and the optimum of the loading and unloading arts and crafts recently. there is no a ripe theory on that above. so, this paper attempt to set up a series of analyzing method and form a theory system on it to improve the efficiency of port and bring more benefit

    關于港口卸機械的選型依據、港口卸機械的單機效率、港口卸作業效率、港口企業卸作業系統即多條作業綜合效率、港口藝中卸機械的性能匹配和效率匹配以及港口卸機械資源優化配置問題的研究和理論方法還比較薄弱,港口卸機藝的選擇、藝系統卸機械數量和等級的確定以及卸機械選型尚沒有成熟的理論依據。
  15. The whole process is made of consummating the task of the port bureau ' s dispatch, setting the major task, fixing the lines " amount, deciding the technical standard, determining the statistics of the resources used, attaining the targets, setting a synthetic value on multiple plans, and printing or showing, - - - - - - hence making the relevant models realize the all function

    調度計劃編制的全過程是根據局調下達的任務確定重點任務、確定各任務的開頭量、不同作業藝標準、資源利用統計情況、各計劃方案的指標達標情況、以及多方案的綜合評價問題和列印輸出。
  16. Secondly, calculation theory of construction for suspension bridge is presented under the ideal condition of dead load design. linetype change stiffness of cable and slip stiffness of supporting points are deduced based on segmental catenary theory. then numerical analysis method through sgkz2000 software are introduced in detail about calculating design linetype for suspension bridge, unstressed length of cable, erection linetype of cable and pre - displacement of saddle without loads, erection linetype of wire strands, the fixed position for erecting cable band and linetype of lifting stiffening girders

    其次,根據懸索橋恆載設計理想狀態建立了懸索橋施計算原理;以分段懸鏈索理論為基礎,推導了懸索的形變化剛度和懸索支點的滑移剛度;介紹了懸索橋成橋設計形計算、吊索無應力長度計算、空纜形與預偏量計算、絲股架設形計算、索夾安位置計算和加勁梁吊形計算的具體方法、數值演算法及軟體sgkz2000的計算模塊的實現。
  17. Help to recruit and train the assembly operators, and responsible for the results

    協助應征並訓練組操作,對結果負責。
  18. Assembly line work

    裝線工
  19. Each person who works on an assembly line is responsible for doing the same job on each car

    在組裝線工作的每位人,只需負責對每臺車做同一件事。
  20. Example : the robotic assembly of automobiles is becoming so advanced that the lights - out factory may become a reality soon

    機器人汽車組變得如此先進,完全自動化的廠可能不久就會變成現實。
分享友人