裝載容量 的英文怎麼說

中文拼音 [zhuāngzǎiróngliáng]
裝載容量 英文
charge capacity
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 裝載 : freight; loading; shipping; capacity; storage; embarkation; laden
  1. Packaging - flexible carrier bags for the transport of various retail goods - general characteristics and test methods for the determination of volume and carrying capacity

    .各種零售商品運輸用軟包袋.一般特性和測定積和的試驗方法
  2. Article 93 a voyage charter party shall mainly contain, interalia, name of the shipowner, name of the charterer, name and nationality of the ship, its bale or grain capacity, description of the goods to be loaded, port of loading, port of destination, laydays, time for loading and discharge, payment of freight, demurrage, dispatch and other relevant matters

    第九十三條航次租船合同的內,主要包括出租人和承租人的名稱、船名、船籍、貨重積、貨名、貨港和目的港、受期限、卸期限、運、滯期費、速遣費以及其他有關事項。
  3. Earth - moving machinery ; loader and front loading excavator buckets ; volumetric ratings ; identical with iso 7554, edition 1983

    土方機械.機和前式挖掘機鏟斗.額定值
  4. Testing earth - moving machinery - method for the determination of volumetric ratings for hydraulic excavator buckets and backhoe loader buckets

    運土機械試驗.液壓挖掘機鏟斗和反向鏟鏟斗額定值測定方法
  5. Dock operations ( e. g., capacity of preparation areas, loading bays, limits of loading and unloading, rules of freight capacity, schedule of dispatch handling ) are optimized, using scheduled window times and carrier on - time performance is tracked

    卸操作(例如,準備區域,區,極限的卸貨的,貨物的規則,分派處理的計劃)優化,使用計劃時間表,跟蹤準時運輸情況。
  6. The actual load is compared to four limit values, and by achieving the limit value, the relay of the crane controller could be switch

    實際的靠近極限值的同時,又不斷與四個極限值相比較。起重機控制電可以作為開關。
  7. The second chapter simply introduces the development of alternate asynchronous inverter technology and retrospects some types of energy - saving systems for hydraulic elevators. then the working principles of the project are discussed and analyzed at four different working status, i. e. light load upwards, heavy load upwards, light load downwards and heavy load downwards. and the chapter focus on the introduction of structure design of pump station, calculation and type selection of pump / motor reversible units, research on oil leakage principles of accumulator circuit, design of accumulator - pump / motor pressure - energy transformer and integrated valve blocks, etc. the last but not the least, the electrical wiring of vector inverter control cabin and design of computer control and data acquisition system are introduced

    論文第二章首先簡單介紹了交流異步電動機變頻調速技術的發展概況,在回顧電梯液壓控制系統節能技術的基礎上,介紹了本課題研製的「採用蓄能器的液壓電梯變頻節能控制系統研究」的基本原理,分析了動力系統在電梯轎廂輕上下行、重上下行等四種典型工況下的基本工作狀態和工作方式;詳細地介紹了本課題節能系統液壓動力泵站的結構設計和參數設計,重點研究了液壓動力泵站的結構設計、液壓泵馬達可逆性問題及其選型設計計算、蓄能器迴路泄漏油損失機理的研究及其補償置的設計、蓄能器-泵馬達壓力能轉換置的設計、多功能集成控制閥組的設計等內;最後簡單介紹了本課題矢控制變頻控制櫃的外部附件電氣接線、計算機控制及數據採集系統的硬體設計等內
  8. Volumetric rating for loading buckets

    機鏟斗.標定
  9. Application of high - voltage explosion fuses is very abroad. in addition to protecting the electrical equipment by melting itself, disjunction or close of its tube can also be manipulated by a high - voltage insulative stick under some circumstance, for example, to switch on or off no - load overhead transmission line, no - load transformer and little burden current

    跌落式高壓熔斷器的應用極為廣泛,不僅能保護電氣置,在一定條件下還能直接用高壓絕緣鉤棒來操作熔管的分合,以斷開和接通空的架空線路、小變壓器和小負荷電流。
  10. An imponant feature of the suzhou classical gardens is that, as products of historical culture, they carry information on chinese traditional ideology and culture. the garden hall names, inscribed horizontal boards, pillar couplets, stone in scriptions, carvings, decorations and tree -, nower - androckery - implied meanings all not only serve as exquisite art works for embellishing gardens, but also contain extensive and deep historical, cultural, ideological and scientific deposits in both material and spiritual aspects

    蘇州古典園林的重要特色之一,是它不僅是歷史文化的產物,同時也是中國傳統思想文化的體。表現在園林廳堂的命名匾額楹取書條石雕刻飾,以及花木寓意疊石寄情等,不僅是點綴園林的精美藝術品,同時儲存了大的歷史文化思想和科學信息物質內和精神內都極其深廣。
  11. Crude petroleum and petroleum products - transfer accountability - assessment of vessel experience factor on loading and vessel experience factor on discharging of ocean - going tanker vessels

    原油及石油產品.運輸的計算.遠洋油輪和卸器經驗參數的評估
  12. Harvesting equipment. combine harvesters. determination and designation of capacity and performance of grain hopper delivery device

    收割設備.聯合收割機.穀物漏斗卸置的和性能的測定和標識
  13. By analyzing the load factor and unbalance factor of distribution transformer, the method of calculating and selecting the low voltage reactive power compensation capacity and compensation equipments, and the connection mode of capacitors were presented

    摘要通過對配電變壓器負率和不平衡率的分析,提出低壓無功補償置補償的計算選擇方法和電器的接線方式。
  14. 4 independent charging channels can charge 1 - 4pcs aa / 1 - 2aaa size ni - mh / ni - cd rechargeable batteries. when charging, different batteries can be mixed either in size or in capacity

    4路獨立充電器,可以同時充1 - 4節5號或1 - 2節7號鎳氫鎳鎘充電電池,並且不同型號和電池可以任意混合充電
  15. The new unit has following technical features : ( 1 ) the unit ' s load is balanced by means of the accumulator and hydraulic cylinder with special structure ; ( 2 ) the installed power of the unit can be reduced greatly by adopting the accumulator ; ( 3 ) variable frequency speed regulation ensures good energy saving effect, and the closed oil circuit requires less hydraulic oil ; ( 4 ) a bi - directional hydraulic lock in the oil circuit ensures the stability and safety of the operation of the pumping unit

    新型機具有4個技術特點: ( 1 )由於活塞柱塞式液壓缸的特殊結構和液壓蓄能器的配合使用,在平衡抽油機大部分荷時,不需另外增加配重,可減小抽油機體積、質和佔地面積; ( 2 )抽油機下沖程時,與活塞柱塞式液壓缸相連接的蓄能器吸收能,上沖程時儲存在蓄能器中的能補充荷上行所需的能,大幅度降低抽油機機功率; ( 3 )利用變頻積調速節能效率高,閉式油路節省液壓油,同時大大減小液壓泵站的體積; ( 4 )在閉式油路中採用雙向液壓鎖可使抽油機的啟停更加平穩、迅速,其工作的穩定性和安全性更好。
  16. Earth - moving machinery - loaders - part 4 : test method to measure breakout forces and lift capacity

    運土機械.機.第4部分:起動力和裝載容量的試驗方法
  17. Capacity loading and scheduling system

    與調度系統
  18. The quantity that a container or apparatus can hold

    最大箱或器的裝載容量
  19. The routes must be designed so that ( i ) each demand location is served by exactly one vehicle, ( ii ) the total demand on each route is less than or equal to the capacity of the vehicle assigned to that route, and ( iii ) each route begins and ends at the central

    Vrp問題是為固定的車輛集,設計一些起始於中心站的路徑,要求在顧客的需求已知,且每一個顧客最多被服務一次,車的不允許超過車輛的情況下,使總費用最小。
分享友人