裝載預置 的英文怎麼說

中文拼音 [zhuāngzǎizhì]
裝載預置 英文
load preset
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • 裝載 : freight; loading; shipping; capacity; storage; embarkation; laden
  1. This paper analyzes the character of the transformer load and presents the control means to reduce the comprehensive power loss to minimum by controlling the transformer operation status, which forecasts the daily load of transformer by periodical auto - regression model ( par ) and divides the daily flow line automatically into two typical phases. then, this paper simulates the par by matlab. at last, a real intelligent control device based on the ti ’ s tms320lf2407 dsp has been completed

    論文分析了配電變壓器的負特點;提出採用周期自回歸模型測配電站用電日負荷,根據負荷測結果和用電時段,以綜合功率損耗最小為目的變壓器經濟運行控制方法;以ti公司的tms320lf2407dsp為基礎,完成了配電站變壓器經濟運行智能監控的研製。
  2. Degassed furnace, sealing furnace, stabilizing oven, mask annealing lehr, blackening furnace, bulb roaster, primary annealing lehr for colour tube funnel, secondary annealing lehr for colour tube funnel, annealing lehr of single - press, annealing lehr of double - press, funnel annealing lehr, colour tube panel annealing lehr, tube - neck sealing and annealing lehr, cut - off machine, necking machine, funnel - loader, lehr preheating unit, neck - loader, funnel auto - pickup, auto - pickup conveyor, funnel auto - loader, neck seal loader, neck - delivery conveyor, rough grinder, fine grinder, fine - polish grinder, panel pickup, button sealing machine, pin sealing machine, funnel annealer loader

    彩管、彩玻設備系列:排氣爐、封接爐、穩定爐、蔭罩退火爐、黑化爐、焙燒爐、彩色玻錐一次退火爐、彩色玻錐二次退火爐、雙壓機退火爐、單壓機退火爐、彩色玻屏退火爐、管頸封接退火爐、割頭機、接頸機、錐、退火爐、管頸機、屏自動取出、自動取出傳送帶、錐自動機、管頸封接機、管頸供給傳送帶、粗研磨機、細研磨機、精拋光研磨機、取屏機、陽極帽封接機、銷釘封接機、錐退火爐機。
  3. Secondly, calculation theory of construction for suspension bridge is presented under the ideal condition of dead load design. linetype change stiffness of cable and slip stiffness of supporting points are deduced based on segmental catenary theory. then numerical analysis method through sgkz2000 software are introduced in detail about calculating design linetype for suspension bridge, unstressed length of cable, erection linetype of cable and pre - displacement of saddle without loads, erection linetype of wire strands, the fixed position for erecting cable band and linetype of lifting stiffening girders

    其次,根據懸索橋恆設計理想狀態建立了懸索橋施工計算原理;以分段懸鏈線索理論為基礎,推導了懸索的線形變化剛度和懸索支點的滑移剛度;介紹了懸索橋成橋設計線形計算、吊索無應力長度計算、空纜線形與偏量計算、絲股架設線形計算、索夾安計算和加勁梁吊線形計算的具體方法、數值演算法及軟體sgkz2000的計算模塊的實現。
  4. In this paper, the three level fortification criterion, two stage design method and the elastic response spectrum theory are adopted, and the program of nba ( the program of nonlinear - aseismic analysis for beam bridge ) is used to calculate. through gathering, analyzing and calculating a lot of bridge design materials, this paper induces a simple way to calculate the relative displacement of the beam and the pier, and then according to the current design method, it concludes a better design principle of the supporting length of the beams. at the same time the dynamics is adopted to put forward the design method of the carrying capacity and the lengthen of prestress wire ( steel bar ) falling - off prevention structures of highway bridges

    本論文採用三水準設防、兩階段設計方法、彈性反應譜計算理論,運用橋梁結構非線性地震響應分析程序nba ( theprogramofnonlinear ? aseismicanalysisforbeambridge )進行計算;通過收集大量的實橋設計資料,經分析計算,歸納總結出計算上下部結構相對位移的簡便計算方法;並綜合國內外的經驗值,提出梁的支承長度se的設計原則;同時運用動力學突加荷的原理,推導分析了應力鋼絞線式(鋼棒連接式)落梁防止設計承力的計算方法和設計伸長量s _ f的取值;最後本文通過實橋計算,說明了落梁防止系統設計的方法。
  5. Safety requirements for cableway installations designed to carry persons - precommissioning inspection, maintenance, operational inspection and checks ; german version en 1709 : 2004

    人用索道的安全要求.運行檢查維修操作檢
  6. Aerospace - preformed flexible steel wire rope for aircraft controls - dimensions and loads

    航空航天.飛機控制成形撓性鋼絲繩.第1部分:尺寸和負
  7. Potential ( dynamic ) hardpoints : those are hardpoints that can be placed anywhere on the ship hull provided that it ' s flat enough ( try to be coherent, don ' t place hardpoints on details or where there are important details in the textures, such as windows ), and that there ' s enough room for it

    潛在(動態)掛點:那些是可以設在船殼任意平整位(確保邏輯緊密,不要使掛點覆蓋在船體的一些重要材質細節上,比如窗戶)上的掛點,所以要事先為此留足夠的的安空間。
  8. Apecial capacitor for lighting metal halide lamp features and uses the capacitor has advantages of low dissipation, high insulation resistance, good self - healing character, and steady electricity perfomance, anti - striking current, strong over - carrying capacity, etc

    為一個供電軟線組,能探測流過內部導線的漏電流和飛弧,並按設的漏電流大小斷開電路,減少負端由於泄漏電流形成火災的可能性。
  9. Siffness analysis of cnc heauy duty machine tools preload double pinion rack drive device

    重型數控機床雙齒輪齒條剛度分析
  10. Study and realization on precooling unit added to truck - mounted air separation plant

    制氧機加的研究與實現
  11. According to the stress spectrum of weaking section in fatigue test and s - n curve of classic welding joint in this section, we establish a model of life calculating by the principle of fatigue damage equivalence, then we get the relationship between the cross sustaining device ' s actual utilizing life and the load recycle number in fatigue test

    根據疲勞薄弱部位在室內疲勞試驗中的應力譜及該部位典型接頭的s - n曲線,按照疲勞損傷等效原則建立交叉支撐的壽命測模型,得到了交叉支撐實際運用壽命與室內疲勞試驗加循環次數的關系。
  12. Catalytic converter is one of the main countermeasures in controlling the automotive exhaust emission in the world. most of the gasoline engine of car and light duty truck have been installed the catalytic converter in the u. s., japan and europe. from the review and analysis of a great number of foreign literatures, a set of evaluation technique and test method for reliability of automotive catalytic assembly has been set up

    通過分析催化轉化器體和墊層的特性,提出了懸浮式墊層封技術;並在在用車及新車催化轉化器的開發中提出了用金屬網催化轉化器作為起燃,同時採用陶瓷催化轉化器的復合型結構設計,殼體採用懸浮式封結構形式,催化劑採用稀土和貴金屬復合型,臺架試驗及實車試驗結果表明設計方案達到設計要求。
  13. Derived from the scientific research project - " intellectual carrier - wave channel testing instrument for electric circuitry ", this project has passed appraisement made by authority department and all testing results approached or exceeded anticipated targets

    本項目來自於湖南省電力試驗研究所科研項目「智能化電力線波通道測試」 。該現已通過權威部門鑒定,各項測試結果達到或超過期指標。
  14. Tempory works equipment - load bearing of prefabricated components - particular methods of structural design

    臨時工程設備.制構件的承.結構設計的特殊要求
  15. Safety requirements for cableway installations designed to carry persons - precommissioning inspection, maintenance, operational inspection and checks

    人索道的安全要求.交付使用檢驗維護操作和檢驗
  16. In the case of a pre - loading device or system, a full technical description of the construction and function including any sensing device, describing the method of activation and any necessary method to avoid inadvertent activation

    或系統中,應包括全部技術描述,(系統)結構、包括傳感在內的功能描述(驅動方式以及避免疏忽的必要方式) 。
  17. For example, " access intents " can be specified that enable you to set the read ahead size similar to setfetchsize, read limit similar to setmaxrows, and preload caching similar to joins

    舉例來說,可以指定" access intents "以使您能夠設前向讀取的長度(類似於setfetchsize ) ,讀取限制(類似於setmaxrows )和緩存(類似於joins ) 。
分享友人