裝配作業線 的英文怎麼說
中文拼音 [zhuāngpèizuòyèxiàn]
裝配作業線
英文
assembly line- 裝 : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
- 配 : Ⅰ動詞1 (兩性結合) join in marriage 2 (使動物交配) mate (animals) 3 (按適當的標準或比例加以...
- 業 : Ⅰ名詞1 (行業) line of business; trade; industry 2 (職業) occupation; profession; employment; ...
- 線 : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
- 裝配 : assemble; fit together; fit out; assembling; fitting; rigging; erecting; fabrication
-
Secondly, paper introduces the composition structure and the manufacture craft characteristic of airplanes, describes the structure and the main assembly process and the assembly characteristic of the n # fuel tank section, points out the assembly accuracy control of the n # fuel tank section. thirdly, paper analyses in detail problems which exist in the current riveted assembly of the n # fuel tank section, proposes the improve measures against the existent problems. finally, paper forecasts in theory the positive effect that the new plan will bring, introduces the practical result after approval test, analyses the differences of both
具體做了以下幾方面工作:第一,詳細闡述了工作研究的基本原理;第二,介紹了飛機的組成結構、飛機製造工藝的特點、 n #油箱段的主要結構、 n #油箱段的主要裝配過程、 n #油箱段的裝配作業特點和n #油箱段的裝配準確度的控制方法;第三,具體分析了n #油箱段鉚接裝配生產線現行作業中存在的問題,針對存在的問題,提出了具體的改進建議,並形成了新的改進方案;第四,從理論上預測了新方案將會帶來的積極效果,介紹了新方案在現場試驗驗證的實際結果,並對兩者之間存在的差異進行了對比分析與研究。Appication of genetic algorithm based on task sequences to assembly line balancing
用基於作業序列的遺傳演算法求解裝配線平衡問題Our company is professional produce sporting goods, produce worker 300 in our company, register capital three millions, produce one - hundred thousands sets in one month ; professional produce in - line skate protector, skateboarding protector and u skateboarding protector, deng mountain sporting protector and industry protect, related sport protective product, about kneepad, elbowpad, wrist guard, helmet and hat mainly, as well as the motor clothing of offroad vehicle, protect the products such as, use nylon pe of eva in protect
本公司是專業生產運動護具及運動用品之公司,現有生產人員300人,注冊資金300萬,月生產能力10萬套主要生產直排輪溜冰滑板u臺運動蹬山工業等所用的運動保護裝置,含eva尼pe等材質護膝護肘護腕頭盔帽子,以及機車越野車衣護具健身砂包袋健身墊系列等產品,有專業的設計研發能力,配合完善之管理制度以及流水線生產作業模式從而確保品質交期的達成所生產之產品符合相關的安全測試標準,本公司兼具有內銷及外銷,有出口到歐洲美洲等多個國家並可承接客人之樣品開發打樣,亦可根據客人的需要來料加工生產Assembly line operation
裝配作業線生產A assemble workshop with several automatic and semiautomatic lines
裝配車間:擁有數條全自動半自動流水作業線The research method and theory is still wick about the foundation of the loading and unloading equipment selection, the efficiency simple loading and unloading equipment, the efficiency of the loading and unloading line, the summary efficiency of all loading and unloading lines on port, and the optimum of the loading and unloading arts and crafts recently. there is no a ripe theory on that above. so, this paper attempt to set up a series of analyzing method and form a theory system on it to improve the efficiency of port and bring more benefit
關于港口裝卸機械的選型依據、港口裝卸機械的單機效率、港口裝卸作業線效率、港口企業裝卸作業系統即多條作業線綜合效率、港口裝卸工藝中裝卸機械的性能匹配和效率匹配以及港口裝卸機械資源優化配置問題的研究和理論方法還比較薄弱,港口裝卸機工藝的選擇、工藝系統裝卸機械數量和等級的確定以及裝卸機械選型尚沒有成熟的理論依據。The stationary slewing crane has such characteristics as simple structure, convenient operation, high efficient, etc. it is widely used for the feeding and laying off of the workpiece of production line, assembly line and lathe in the workshops, and the material swinging operation in such places as the warehouse, quay, etc
定柱式旋臂起重機定柱式旋臂起重機,具有結構簡單操作方便節能高效等特點,廣泛用於工礦車間的生產線,裝配線和機床的上下工件,以及倉庫碼頭等場所的物料吊運作業。Time standards for nkr front axle assembly line, jap, is reset based on modapts, and time unit is reduced, and capability of the line is induced. the balance rate of the assembly line is developed from 62 % to 76 % by process elimination, combination, rearrangement, and simplification applied with rules for motion economy and eff iciency
論文應用模特排時法對江鈴車橋廠nkr前橋裝配線重新制訂工時定額標準,降低裝配線生產節拍,提高裝配線生產能力,按照動作經濟原則,通過工序剔除、合併、重排、簡化使前橋裝配線作業平衡率由62提高到76 。Firstjap background and nkr front axle assembly line problems, non - meet demands and unbalance, is introduced, and modapts is suitble and important for the development of assembly line. secondly, theorials on work study, set time standards and process balance is reviewed, and current workshipment, operation motion capability. balance rate is revealed based on the investigation. according to work study theory, typical seven motions analysis is detailed, and operation method standards is designed. according to the human - machine theory, noise, light, tools, facilities factors is analysised, and conditions reducing production rate is advanced
本論文採用理論與實踐相結合的方法,運用工業工程、人機工程學有關工作研究、方法研究、勞動定額、模特排時法等理論和方法,在分析大量文獻資料的基礎上,參考國內外在工業工程方面的最新研究和應用成果,對江鈴車橋廠nkr型汽車前橋裝配線的組織設計進行了系統的重組和優化設計研究。On the basis of analyzing the requirements of information construction of xac assembly line, this paper studied and developed an oa system, using advanced digital manufacturing technology, object - oriented technology, workflow management technology, database technology and bar code technology. this paper also carried out a study of the role and function of oa system in the course of the enterprise ' s information construction
本文結合西飛公司裝配生產線的數字化建設的需求,應用先進的數字化製造技術,面向對象技術、工作流管理技術、數據庫技術、條形碼技術等對ao系統進行研究和開發,並對ao系統在航空企業推廣應用進行了有利的探索。An assembly line is a very efficient method for building cars
流水線作業是裝配汽車的一個非常有效的方法。Through the investigation of coating processes of covering parts of construction equipment, it is suggested that stream line operation should be adopted for covering parts coating and then to assemble the coated parts products
通過對工程機械設備的覆蓋塗裝工藝的探討,建議塗裝覆蓋件採用流水線作業,對塗裝成品件實施裝配。This paper use tientsin port as an example to analyze the relative factors, which affect the optimum allocation of equipments on port after having researched and analyzed national and foreign data. the math model of the optimum allocation of equipments based on integral layout theory has been set up and the brief design method of software about the optimum allocation of equipments on port. the following are a brief introduction of my work in this paper
在調查和分析國內、外的有關資料和現狀的基礎上,本文以天津港為例,初步分析了影響港口裝卸生產作業線設備優化配置的相關因素,應用基於整數規劃的設備優化配置數學模型,提出了港口裝卸生產作業線設備優化配置軟體的設計研究思路和概要。The high balance crane is widely used for the material feeding and laying off of lathe in the workshop, the workpiece swinging and the spare part assembling of production line in processing room, and the swinging in warehouse and other places
機械高型平衡吊廣泛用於工廠車間的機床上下料工序間生產線的工件吊運零部件裝配及車間碼頭倉庫等到場合的吊運作業。This essay stems from the problem with which tianjin port is confronted, contributes to the research method and theory on how to allocate equipment in order to optimize the efficiency of the loading and unloading assembly line. up to now, there is no a ripe method on that above. so, this paper applies optimum method and economics theory, attempts to set up a series of analyzing methods and optimum models to improve the efficiency of dock loading and unloading, and reduce the operating costs, and increases more profits
本論文從天津港生產中的現實問題出發,結合發達國家港口設備管理的經驗與中國港口的實際,通過對港口裝卸作業系統地分析,逐步縮小系統的研究范圍,確定提高某一碼頭作業線的機械裝卸效率為研究目的,建立一個作業線合理選擇工藝流程和配機的數學模型,並提出相應的解法。With the rapid development of robotics, more and more robots are running at the factories, most of which are taking on assembly tasks
隨著機器人技術的迅速發展,越來越多的機器人服務在工廠的各條生產線上,其中從事裝配作業的機器人佔了大部分。Live working - installation of distribution live conductors - stringing equipment and accessory items
架空配電線路帶電安裝及作業工具設備Originally used on pos point of sale, atm, pda, and other information device displays, touchscreens are rapidly gaining acceptance as control surfaces for heavy industry, because they adapt to rapidly changing conditions in, for instance, assembly - line conditions
觸摸屏最初是在pos (銷售終端) 、 atm 、 pda以及其他信息設備上使用的,並正在重工業領域作為控制界面得到快速的應用,因為它們能夠適應迅速發生變化的條件(例如裝配流水線的條件) 。At present, to meet the strongly needs of information construction of aircraft assembly line, assembly order ( oa ) system has become the focus of recent research in our country
在現階段,我國飛機製造企業的裝配生產線急需進行數字化改造,對ao系統的研究開發工作迫在眉睫。In fact the problem include of mixing, transporting, stocking, loading and unloading etc. namely optimizing mixing model ( optimizing mixing ratio, transporting line, the material socking area deploying in reason ), setting up the model for the process of blending
這實際上就包含了配料問題、運輸問題、貯存問題、裝卸作業調度等幾類問題;即配料模型優化(配比優化、作業線優化及料場貨位的合理配置) 、混勻過程模擬模型的建立及原料、雜礦加工技術問題。分享友人