西部試驗場 的英文怎麼說

中文拼音 [shìyànchǎng]
西部試驗場 英文
western test range
  • 西 : west
  • : Ⅰ名詞1 (部分; 部位) part; section; division; region 2 (部門; 機關或組織單位的名稱) unit; mini...
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
  • 西部 : nishibe
  • 試驗場 : experiment site
  • 試驗 : trial; experiment; test
  1. Di - on electrics service and products cover the power electric field including power generation transmission distribution, power equipment manufacturing, subway, utilites, ac dc metrology field as well, more than 500 units of electric power utilities and stations such as beijing power supply bureau, guangzhou power supply bureau, baosteel, three gorges power station and more manufacturers like siemens, abb, alstom, bicc, pirelii, toshiba and more and 30 units of metrology institutes in china like nim, tsinghua university and more are our user. di - on electric is sole and exclusive distributor for numerous famous companies like transinor doble norway, measurements international canada, ndb canada, schuetz germany, aan germany, dr. strauss germany and etc, taking care of their business and service in p. r. china including hongkong

    絕大多數員工擁有本科和研究生以上學歷,在電力系統和計量系統工作多年,從事電力檢測帶電監測和計量測儀器的技術服務和市銷售工作長達10年以上,為約500多家電力工業系統的發供電門如北京供電局,廣州電力局,深圳供電局,三峽電廠,廣州抽水蓄能電廠,田灣核電站等等,科研調門如廣東省電力研究所,湖北省電力研究所等等與設備生產廠如siemens , abb , alstom , toshiba等等提供了國際最先進可靠的測技術和儀器設備為約30多家國內二級以上相關計量科研院所,包括國家計量院,清華大學,中國運載火箭研究院,空間技術研究院,航天二院,成飛,西飛和各省市計量院,電力研究院所等提供了大量最先進可靠的計量檢測儀器。
  2. In this thesis, first, reasons and factors for the stability of loose rock dams were summarized according to the field surveys and certain expert ' s experiences. then, researches on block stability problems were reviewed, and according to the relationship between grain size and incipient velocity, it is found that the block weight is in direct proportion to 6 - 9 power of incipient velocity, and 50 % increase of the velocity will result in about 40 times change of the block weight. after that, experiments were conducted in a flume, focusing on the relationship between incipient velocity and some main factors including block weight, water depth over the dam, cross - section size, block material and river bed material

    本文首先根據散拋石壩損毀情況的現調查資料,結合有關專家多年的整治經,總結出壩體的損毀原因及影響因素;對現有塊體穩定性的研究成果進行回顧和總結,並針對散拋石壩的直接損毀現象,結合山區河流的水流、地形特點,利用塊體粒徑與起動流速的關系,提出塊體穩定重量與起動流速高次方成正比的概念,流速50的增長可能導致塊體穩定重量接近40倍的變化;通過二維變坡水槽,研究了壩體穩定的主要影響因素,包括塊體重量、壩頂水深、斷面尺寸、塊體材料(塊石和卵石兩種) 、護底等,結果表明對于山區河流,圖僅僅通過增加壩體單個塊體重量或斷面尺寸來提高壩體穩定性效果甚微;最後,根據西地區的自然、經濟、交通等條件,提出可以採用柔性混凝土鉸鏈體等一類整體性較好的護面層作為散拋石壩的防沖毀措施,以期取得良好的工程效果。
  3. During the research period, by combining theory analysis with engineering practice, the field tests in three sections with high rock - filled embankments, which are over 30m hig h, are put over. through the tests, plenty of valuable field data are obtained which will be helpful in the highway constructions in western china in the future

    此外,本文結合理論分析與工程實踐,成功地完成了三段高達30餘米的高填石路堤的現路,通過周密系統的分層沉降觀測和分類現檢測,取得了豐富的現資料,為今後西高等級公路建設積累了寶貴的經和數據。
  4. Based on the investingation and some study methods of the stability on the goaf, the paper has the goaf of the first and second tunnels of wu long channel on coal mine railway leased line in da ning of shanxi province as an example, according to the engineering geological invesitigation and maping in the earth ' s surface, also combining the visit on the relate people, firstly has a geological judge on the space extend of the mostly ledges which have been picked ; then adopts the instrument of engineering surveying and checking ( for short sws ) which is relatively advanced inside and outside to test by surface wave the rockmass and solid near the middle line of the tunnel ( total forty meter ), and has a relatively exact judgment on the place that the goaf impossible reveal ; lastly passing the validate by drilling, it make clear that the results which tested by sws is reasonable and believable, based on finding out clearly the space extend of the goaf, the author makes a relatively systemic study on the stability of wall rock around the goaf

    因此,查明采空區的具體位置,在此基礎上對地進行工程適宜性評價,對整個工程建設具有重要的指導意義。本論文在總結前人對地下采空區勘察及有關穩定性研究方法的基礎上,以山西大寧煤礦鐵路專用線五龍溝1 ~ # 、 2 ~ #隧道采空區為研究實例,在詳細的地表工程地質調查和測繪的基礎上,結合通過對采空區有關人員的探訪,首先對主要開采礦層的空間展布進行地質判斷;然後採用國內外較為先進的工程勘探與檢測儀(簡稱「面波儀」 ) ,對1 ~ # 、 2 ~ #隧道中線兩側一定范圍內(共40米)進行了面波測,對采空區的可能出露位進行了較為準確的判斷;最後通過鉆探加以證,表明面波儀的測結果是較為合理可信的。
  5. It was learned recently from the datang group that thanks to the joint effort on the part of technical personnel of the datang group and the siemens company, important progress has been made since the fourth quarter of 2001 when the internal field experimental network supported by three sets of td scdma base stations was put into operation

    日前從大唐集團獲悉,經過大唐集團和西門子公司科技人員的聯手奮戰,由三臺td - scdma基站組成的內網從2001年四季度開通后,迄今已經取得重大進展。
分享友人