計劃進度 的英文怎麼說

中文拼音 [huàjìn]
計劃進度 英文
target advance
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
  • : 進構詞成分。
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 計劃 : 1 (工作、行動以前預先擬定的內容和步驟) plan; project; programme; device; devisal; design 2 (做...
  • 進度 : 1. (工作進行的速度) rate of progress; rate of advance 2. (工作進行的計劃) planned speed; schedule
  1. Internal audits shall cover all quality management related processes, activities and shifts, and shall be scheduled according to an annual plan

    內部審核必須覆蓋所有與質量管理有關的過程、活動和班次,且必須根據年行安排。
  2. The main parts of this paper is now be showed in the following : 1 ) the development for the compiling of the schedule had been finished 2 ) the realization of the management function for the schedule system, the base managements can be processed with the management tools. 3 ) the data taken and expressed from the drawing layout system, in the schedule system. 4 ) the data transfer from the schedule system to the drawing layout system

    本文的研究工作主要包括以下幾個方面: 1 )適合電廠工程的編制功能的開發完成; 2 )實現電廠工程的施工管理功能,可以利用施工編制系統的管理工具對施工行基本的管理; 3 )實現在施工定製系統中對施工平面布置系統中的數據的讀取和表達; 4 )完成施工數據向施工平面布置系統的傳送。
  3. The different scheduling characteristics of three production types - continuous production, discrete production and mixed production are first described, a solution is proposed that uses buffer to adjust the characteristics of mixed production, and a scheduling model that combines mrp and opt is presented according to the production requirement of fuda co. in chapter three, the production order ( similar to mps ), mrp and crp in the scheduling are discussed in detail

    第二章是混合型生產調特點,首先分析了三種類型生產過程(離散型、連續型和混合型)的特點,而討論了混合型生產調的特殊要求,提出在混合型生產過程中利用緩沖區來實現離散型生產和連續型生產的平穩過渡。在此基礎上結合富達公司的實際生產情況提出了集成mrp和opt思想的混合型生產控制模型。
  4. Combining the theory of production scheduling with the actual scheduling problems of the project - the development of mis for fuda company, the theory, methodology and implementation of the mixed production are studied in the paper. in chapter one, based on discussing the challenge of the global markets and the change of the competition factors, some problems of production scheduling in practice are analyzed

    本文在分析生產調的不確定性和復雜性的基礎上,結合富達管理信息系統項目開發中的實際問題,對混合型生產的生產調的理論、方法及實現行了全面的分析和研究,主要研究內容如下:第一章是緒論,從現代市場需求出發,討論了現代企業面臨的挑戰和企業競爭要素的轉變,而討論了實際生產中調存在的問題。
  5. The panel discussed the progress report on cyd project, including a review on the future management and operation mode of the cyd, with a view to determining the implementation plan of the superstructure works

    事務委員會討論青年發展中心計劃進度報告,包括檢討該中心未來的管理及營辦模式,以便制定上蓋建築工程的施工
  6. 173 what is your suggestion about this schedule

    你也不錯這個計劃進度有何建議?
  7. Progress report on the centre for youth development project

    青年發展中心計劃進度報告
  8. Hong kong special administrative region identity card project

    香港特別行政區身分證計劃進度
  9. Actual and scheduled progress

    實際展的與計劃進度
  10. The current construction progress is on - time for a start - up in july 2005

    項目目前的建設正按計劃進度行,並將於2005年7月正式投產。
  11. A way to track project progress by comparing original plan estimates against actual progress

    通過比較估計劃進度與實際對項目行跟蹤的方法。
  12. The time - limits for the delivery of technology documents shall correspond with the engineering programmer of the recipient

    技術文件交付的時間應當符合受方工程的計劃進度要求。
  13. Make regular contributions, review your status compared to your plan ; adjust your investment risk tolerance at regular intervals

    作定期性供款作計劃進度檢討每隔一段時間調整自己承擔風險的能力。
  14. Annual dinner of the project was held on december 2006 mainly to report the project progress in the year and its future plan

    周年聚餐本之周年聚餐於2006年12月舉行,主要報告了計劃進度及前景。
  15. X. the meeting required hgsp to conduct overall evaluation of the whole construction project and formulate really feasible construction scheduling

    十、會議要求日立環球公司對整個建設工程行全面評估,制定出確實可行的建設計劃進度安排表。
  16. Coordinate programs including planning , scheduling , ordering , and tracking

    項目協調,包括制定安排,分類及跟蹤。
  17. Y2k compliance plan, progress and reference information are posted on the departmental electronic filing systemintranet for easy access by all staff

    至於符合2000年數位標準和參考資料,則載于署內的電子檔案系統內聯網,以方便全體人員查閱。
  18. Based on production plan and status, notify sales department about confirmed delivery time and produced quantity

    根據生產,通知銷售部門訂單的實際交貨時間、實際交貨數量等信息。
  19. In the research and development of cam is, according to the practical need of chongqing chang ' an design research academy, some key techniques have been research and implemented. for example, the technique of dynamical management of work schedule has been presented and implemented, by which the due - date of schedule management has been increased and the economic lose due to the schedule delay has been decreased

    為了提高執行的質量,提出了計劃進度動態監管的構想,研究並實現了在管理信息系統中實現這一構想的具體技術方法,採用這一方法后,顯著地提高了計劃進度管理的時效性、準確性,減少因人為疏忽而致工期延誤而造成的經濟損失。
  20. The conditions of grant would be specified at the outset, with provisions of progress report and financial reports as part of the reimbursement claim process

    我們會在一開始時便訂明獲批撥款的條件,並規定須提交計劃進度報告和財務報告,作為討回開支的理據。
分享友人