計劃預修制 的英文怎麼說

中文拼音 [huàxiūzhì]
計劃預修制 英文
planned preventive maintenance system
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ動詞1 (修飾) embellish; decorate 2 (修理; 整治) repair; mend; overhaul 3 (寫; 編寫) write;...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • 計劃 : 1 (工作、行動以前預先擬定的內容和步驟) plan; project; programme; device; devisal; design 2 (做...
  1. Preventing means stopping breakdown from taking measures ahead and it will shortening time of maintenance and break down of the machine and turn onrush maintenance into keeping machine sets in good condition, therefore, it ' s a good way to have equipment classified in abc and take a good advantage of limited equipment managing source to make point - check more functional

    防主要是為了防患於未然,變突擊維為狀態維,縮短維時間和便於生產的調整,減少停產損失。為此,對設備進行abc分類管理,以有效利用有限的設備管理資源;健全點檢度,明確點檢內容,使得點檢工作更有成效;重視設備建設期的管理,掌握設備的初期狀態,既可節約建設期的費用,又利於生產期的費用的節約。
  2. Topics discussed included the progress in windshear alerting service, amendment 72 to icao annex 3, re - organization of airspace in the south china sea, the annual survey on services provided by the hong kong observatory, world area forecast system wafs transition matters, the launch of broadband amids and the progress on automatic dependent surveillance controller pilot data link communication ads cpdlc and aircraft meteorological data relay amdar. fig. 15 meeting on aviation weather services with air traffic management bureau, civil aviation administration of china, 12 november 2001, beijing

    會上討論多項議題,包括風切變警告服務的最新進展國際民用航空組織icao附件3須作出的第72號訂中國南海空域的重組天文臺的周年服務意見調查世界航空區域報系統wafs過渡事宜推出寬頻航空氣象資料發送系統amids ,以及自動從屬監視系統飛行員管員數據鏈通訊ads cpdlc和飛機氣象數據下傳amdar的最新進展。
  3. Supervise duty team to carry out preventive maintenance schedule

    督促班組人員巡查度的落實及防性維的執行。
  4. Its major facilities include a dedicated apron for aircraft parking, an executive terminal, a 23, 800 square - foot hangar, aircraft and avionics service bays, refuelling equipment, a maintenance base, weather and flight briefing room and a business centre for travellers, making it the first of its kind in the region

    主要設施包括專停機坪客運中心23 , 800平方尺的飛機庫航機及電子儀器維服務燃油補給設施維基地氣象報兼飛行中心及旅客商務中心,是區內首個擁有上述裝備的商用航空中心。
  5. Since the new china was established, the electricity business enterprise at all times has made varied regulations of equipment maintenance according to the principle of safety first and main prevention

    新中國成立以來,我國發電企業依據「安全第一,防為主」的安全生產方針,定的各種發供電設備檢規程,就是用防為主、的原則對設備的可靠性進行管理。
  6. First, a new methodological framework is developed for investigating the optimal strategies of maintenance scheduling for generating units with risk well taken into account, based on the widely employed power pool mode and the uniform clearing price. two scenarios are examined in detail, i. e., for the two cases that the generation company studied is / is not a price taker in the electricity market operation. based on the electricity market clearing prices estimated, a new methodological framework is presented, mathematical models formulated and a solving method developed

    以國內外廣為採用的聯營體模式、統一市場清算價結算的現貨電力市場為背景,在假設市場電價可以測並能夠描述為某種概率分佈的前提下,採用方差或標準差來描述和度量風險;建立了相應的優化模型,為發電公司在定發電機組的檢時適當兼顧利潤損失的期望值最小和風險最小這兩個目標提供了新的解決途徑。
  7. Participate in the implementation of planning maintenance programs and designing the preventive maintenance system

    參與性維程序和草擬防性維系統
  8. Planned preventive maintenance system

    計劃預修制
  9. When the data of logistics in current process are used for input of simulating logistics in future 100 % continuous casting process, supply of hot metal from iron - making process may not satisfy the needs of 100 % continuous casting on raw materials. because planning scheme in continuous casting process depends greatly on smelting scheme in convertor vessel, it is important for operator to balance raw materials supply, smelting and casting in order to realize the scheme of 100 % continuous casting. when some equipment are work abnormally, mixer of hot metal and lf furnace can be used for logistics buffer

    用攀鋼煉鋼生產數據對模擬軟體系統進行的測試和模擬研究結果表明:模擬系統的隨機數發生演算法可以實現對作業時間的依分佈隨機抽取;在相似的輸入條件下,模擬結果與實際生產物流的時間分佈規律基本吻合,達到了模擬軟體設期目標;若以攀鋼提釩煉鋼廠現工藝的鐵水輸入作為全連鑄后的輸入條件,則現工藝的物料供應能力可能難以滿足全連鑄生產的要求;連鑄機的連澆對轉爐爐次的編有很高的要求,合理安排來料、煉鋼與澆鑄三者間的物流平衡關系將是保證全連鑄作業的重要條件;當出現設備異常情況時,可以利用混鐵爐與lf爐站前等待作為物流緩沖池,通過延長系統的平均物流時間來緩解因設備檢和故障等擾動所造成的影響,確保生產的順利進行。
  10. In general, vibration diagnosis of rotating machinery is an effective and cost - cutting method. with the help of diagnosis, maintenance management will be changed over from planed maintenance system to predicated and preventive one

    總之,振動診斷技術是旋轉機械故障診斷的有效方法,它為企業維知維轉變,為企業設備安穩運行將發揮重要作用。
  11. Scheduling and planning preventative maintenance activities that will maximize equipment availability and minimize downtime

    防性維護,以便最大化利用設備及最小化減少因維造成的停工。
  12. Audit the spare part requirement plan pulled by preventative maintenance ; control the sum of spare parts storage within the limits

    審核由防性維主要拉動的的備件需求,控備件庫存金額在年度目標內。
  13. On the basis of generalizing the advanced theories and learning the latest experience from home and abroad, integrating the practical experience of the life company of xapa, the author systematically puts forward a set of workable annual human planning program made up of three phases, namely, work analysis, the prediction of the human resource demand and supply, and the human resource plan - making. meanwhile, the author applies this program to the life company of xapa to have it checked and modified practically

    論文在歸納總結國內外先進理論、學習借鑒國內外先進經驗的基礎上,結合xapa保險公司的實踐經驗,從系統的角度提出了一套由工作分析、人力資源供需測和人力資源三個階段組成的,可操作性強的人力資源規程序,並將其應用於xapa保險公司的實際人力資源規過程,使之得到實踐的檢驗和正。
  14. Follow up daily assignments, in - house project, inflow analysis, exhibits & displays set - up, punch card system, schedule building preventive maintenance & planned preventive maintenance inclusive pre and pro tasks to eliminate and provide suitable and better quality guest service

    監控日常工作,內部項目,打卡度,防性維包括前期準備和後期總結,以確保提供最優質的客戶服務。
  15. Improve preventive maintenance plan, set up sop for operating equipment

    負責防維和備件的完善、定設備運行操作sop 。
  16. First, the thesis designs a whole geo - spatial data bank. generally, it involves in fundamental information preparation, writing standards, graph layer division, graph digitizing, collection of attribute data, edition, topological treatment, pretreatment, graph splicing, incorporation of attribute data and the final establishment

    論文首先對研究區地學空間數據庫進行了整體設,大體經過基礎資料準備、定數字化圖層及屬性文件格式標準、分圖層、數字化圖形與採集屬性數據、編輯改與拓撲處理、進行處理、圖幅拼接與屬性數據合併,到地學空間數據庫建立。
分享友人