計工制工程 的英文怎麼說
中文拼音 [jìgōngzhìgōngchéng]
計工制工程
英文
force-account construction- 計 : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 制 : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
- 程 : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
-
During recently 3 years, i mainly engaged in mechanical vocation ' s plant planning. i attended 25 projects, which including feasible reports, preliminary designing and working drawing designing, ranged over establishment or technology reforming of machine tool factory, gear factory, tractor factory, automobile manufactory, electric pump factory, electromechanics factory, electric cable factory, the highest investment of them is 160 million yuan, total design work expand over 850 million ( no repeat calculate ). for i have professional ability and well up in developmental situation of mechanical vocation and it ' s situation inside jiangsu province, these projects what i designed were all authorized by leading department and expert, introduced into national plan and bring into operation. these projects bring both economic profit and society profit for the factory ' s technical advancement, product ' s update. as the director of these projects in these designing and consultation work, i generally organize and operate these and earn the higher valuation of leading department and consumer
近三年來主要從事機械行業工廠工程設計,先後參與二十五個項目的可行性研究報告編制,初步設計和施工圖設計.涉及機床廠,齒輪廠,拖拉機廠,汽車製造廠,電泵廠,電機廠,電纜廠的新建或技術改造,其中單項投資額最高的為1 . 6億元,總計完成投資額為8 . 5億元(未重復計算)的設計工作量.由於對機械行業發展狀況和省內狀況較為熟悉,具有一定的專業水平,這些設計項目均經有關領導部門,專家審定列入國家計劃,得以實施,為工廠的技術進步,產品更新換代,生產發展創造較好的經濟效益和社會效益.在這些設計,咨詢中,本人均任項目負責人,全面組織,實施設計工作,得到主管部門和用戶較高評價By hydraulic modeling, this paper describes studies on the stability of a floating bulkhead operating in standing water and flowing water, and it ' s hydrodynamic stability characteristics that distinguish in standing water from in flowing water ; and direct measurements of the forces acting on the model floating body during floating and sinking is taken. as a result, the rotation stress curves are produced and analyzed ; to provide data for optimum operation schedule analyses of the sluice, the relationship of the impact forces acting on the side wall of the gate and the running speed is studied ; the reasons of unstably uplifting of the bulkhead are discussed and the method to solve the problem is also given in this paper
本文結合常州新閘防洪控制工程水工模型試驗,系統分析了浮箱門在靜水和動水中的穩定性及其影響因素,指出靜水穩性和動水穩性的不同特點;試驗測定了浮箱門動水運行時的受力情況,給出並分析了定位過程轉動力的變化過程曲線;根據浮箱門啟閉速度與門體和岸墻之間撞擊力大小的關系,選擇合理的動力設備,為設計和工程實踐提供可靠依據;分析浮箱門難以穩定上浮的原因,並給出解決方案。Carrying out cost limited design to control engineering cost
推行限額設計控制工程造價Design - limited can efficiently control cost of building
限額設計可以有效地控制工程造價。Abstract : design - limited can efficiently control cost of building
文摘:限額設計可以有效地控制工程造價。Computer aided control engineering
計算機輔助控制工程Through the comprehensive assessment for the constructional design of offshore drilling and workover machines used in wenchang oilfield group, it is proved that the design possesses the following advantages of high modularization and standardization, excellent matching with platform deck assembly blocks, rational material utilization ratio, reducing self weight, implementing pre - engineering of design, and taking account of the updating demands for later stage
通過綜合評價,文昌油田群海洋鉆修井機的結構設計具有以下優點:模塊化、標準化設計水平高,與平臺甲板組塊的匹配性良好,合理控制了材料的利用率,減輕了自重,實現了設計的預工程化,兼顧了後期改造升級的需要。Rationality is ensured of designing - ecomomy and cost of building is efficiently controlled
從根本上保證設計的經濟合理性,有效地控制工程造價。Record the result accurately and in time, make quality decision according to the records, do statistic work and reports to quality manager, meanwhile, report to purchasing department and expediting engineer about the non - conform quality reports
及時準確記錄檢查結果,根據檢查結果對產品質量進行判定,統計檢查數據並匯報給質量經理,同時根據流程要求將不合格產品質量報告反饋給采購部或監制工程師。We are a professional translation company, relate to scopes include : accountant, mechanics, electronics, chemical, bio - pharmaceuticals, motorcar and other fields, have experience in translation, handle with more than 20 kinds of different languages, such as : english, french, german, russian, arabic, danish, dutch, portuguese, japanese, turkish, spanish, italian, korea, polish, finnish, czech, norwegian, swedish, vietnamese , greece , hungarian ; have experts on proofread and layout co - workers, competitive price, high quality and consummate service
我公司是專業從事翻譯服務的機構,涉及的領域包括:會計、機械、工程、電子、化工、生物制藥、汽車等方面,具有豐富的翻譯經驗,現已做過的語種有二十種:英、法、德、俄、阿拉伯、丹麥、荷蘭、葡語、日語、土耳其、西班牙、義大利、韓語、波蘭語、芬蘭語、捷克語、挪威語、瑞典語、越南語、希臘語、匈牙種語;有專業的校對和排版人員,低廉的價格和好的質量及優質的服務This paper, based upon two technical fields - material engineering and control engineering proceeds to study the development of low - voltage electromagnetic forming machine and its control system with using modern control theory and computer technology. the main contents are as follows : first, this thesis expatiates the research and development of low - voltage electromagnetic forming machine
本文涉及材料加工和控制工程兩個主要領域,對低電壓電磁成形機的研製,及基於現代控制理論與計算機技術的電磁成形機控制系統的研究進行了詳細闡述。主要內容有:一The new control point is planned to operate round - the - clock. we are already at the detailed design stage of the control point, which is targeted for completion in july 2006
預期新管制站會提供24小時服務,而相關的配套設施已進入詳細設計階段,工程暫定於二零零六年七月完成。The new control point is planned to operate round - the - clock. we are already at the detailed design stage of the control point, which is targeted for completion in july, 2006
預期新管制站會提供2 4小時服務,而相關的配套設施已進入詳細設計階段,工程暫定於二零零六年七月完成。The new control point is planned to operate round - the - clock. we are already at the detailed design stage of the control point, which is targeted for completion in july 2006. 16
預期新管制站會提供2 4小時服務,而相關的配套設施已進入詳細設計階段,工程暫定於二零零六年七月完成。Abstract : taking the boshan - laiwu freeway as an example, the paper discusses the rocky deep cut slope problems from many sides such as : slope stability assessment, slope design, protection engineering and the constructional monitoring especially the explosion control etc. it stresses on the informational control principle of the deep and large cut slope
文摘:該文以博菜高速公路為例,從邊坡穩定性評價、邊坡設計、防護工程及施工監控、尤其是控制爆破等多方面探討了山區高等級高速公路石質深路塹邊坡問題,強調了高大路塹邊坡工程的信息化控制原則。This artick introduced the design of project amount bill counfing system based on excel, which will improve the project accounting settlement level and pronda a tool for accountant
摘要本文介紹了用日常通用電子表格軟體excel編制工程量清單計價系統,為實現工程預結算電算化的快速普及和提高提供參考,並為相關造價人員提供一種實用的計價工具。Mine project evaluation, work out project suggestions, feasibility report, plan design and basic design of mines, cement plants, fruit processing plants, as well as consultation of overseas project overall contracts investment risk forecasting and mine water prevention and control
礦山項目評估;編制礦山、水泥廠、果汁飲料加工廠項目建議書,可行性研究報告,方案設計,初步設計;海外工程總承包項目咨詢,投資風險預測;礦山水害預防及治理措施。Preloading design : the heaped loads, preloading stages and preloading speeds can be calculated according to the settlement and bearing capacity requirements of subsoil
加壓設計:根據工程對地基沉降及承載力的要求,通過計算確定堆載的大小、分級和加載速率控制等。This adrc is designed in distribute form and easily applied to engineering
該控制器以離散的形式進行設計,易於工程實現。This paper advances some measures for controlling effectively the construction cost in the construction stage from aspects of optimizing the construction organization design, implementing the dynamic control of the construction cost, controlling the construction alteration, strengthening the field signature management, and strengthening the management of the project material prices, etc
從優化施工組織設計、控制工程變更、加強現場簽證和工程材料價格的管理等方面提出了有效控制施工階段工程造價的措施。分享友人