計算結果 的英文怎麼說

中文拼音 [suànjiēguǒ]
計算結果 英文
caiculated effects
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : Ⅰ動詞1 (計算數目) calculate; reckon; compute; figure 2 (計算進去) include; count 3 (謀劃;計...
  • : 結動詞(長出果實或種子) bear (fruit); form (seed)
  • : Ⅰ名詞1 (果子) fruit 2 (事情的結局; 結果) result ; consequence 3 (姓氏) a surname Ⅱ動詞(吃...
  • 計算 : 1 (求得未知數) count; compute; calculate; reckon; enumerate 2 (考慮; 籌劃) consideration; pla...
  • 結果 : 結果bear fruit; fruit
  1. The computational results of the particle images are agreement with the simulated datain reasonable, the most absolute difference of the displacement is 0. 6671 pixel at the x abscissa and 0. 7928 pixel at y abscissa ; the computational results are equal to the data form the algorithm of particle brightness - distribution pattern tracking ( the conventional cross - correlation algorithm ) at voluminous points, their discrepancy is only one pixel at few points, mostly in boundary area

    西安理工大學碩士學位論文最後,在visualfortran環境下給出了這種演法的具體實現,處理模擬粒子圖像的與模擬數據比較吻合,最大位移絕對誤差在x方向是0 . 6671像素,在y方向是0 . 7928像素;計算結果與示蹤粒子灰度分佈模板法(基本的互相關法)在絕大部分點是相同的,只在少數點相差一個像素,而且大多出現在邊界區域。
  2. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和構溫度監測的方法。
  3. In this paper, using the program ( epagpll ), the bored testing pile group of the chinese architecture science and research institute at luokou area are analysised. the comparisons among analytical results of four constitutive models of soil are made, and the deformation of piles and soil, the soil resistance of the piles, the friction beneath cap, the aclinic displacement of the ground soil before piles and the failure pattern of pile group are discussed in detail

    本文利用所編的程序,對上海地區豎向荷載作用下的單樁的流變效應進行了分析,並通過樁體位移?時間關系曲線,確定軟土地基上豎直受力樁的承載力,分析了豎直受力樁的最終沉降量的大小,並合《上海地區地基基礎》地方規范就程序計算結果進行了對比。
  4. In addition, this paper carry out successfully the support design practice in the preceding excavation of 4km long exploratory tunnel. according to the thesis research results, the following conclusion can be drawn. if the grouting rock can possess sound anti - seepage capability and the liner structure can hold higher hydraulic permeability relatively, and if the adjoining rock can be made as primary load - bearing structure by construction measure, the stability of country rock and the safety of liner structure will be guaranteed

    計算結果表明,如能使錦屏工程引水隧洞灌漿圈圍巖具有較好的防滲性能,將高外水壓力控制在灌漿圈以外,再配合透水性相對較好的支護構以及排水措施,使灌漿圈圍巖成為主要承載構,並使襯砌構和灌漿圈共同承載,是可以保證圍巖的穩定和支護構安全的。
  5. The result agreed with experimental data.

    計算結果與實驗數據相符。
  6. Based on characteristics and connectivity of the groups in molecules, the group contribution method and topological method was combined together, a new method was developed which can be used to calculate the density of alkyne from molecular structure

    摘要根據分子中基團的特性和連接性,將基團貢獻法和拓撲方法合在一起,發展了一種炔烴密度的新方法基團鍵貢獻法,該方法具有基團貢獻法適用范圍廣和拓撲方法計算結果準確可靠的特點。
  7. When analyzing the intensity of the drum with the simple numeration and the analogism or the shell theory, the calculative result is not very precise and it " s difficult to describe the nice change of the stress distinctly

    採用粗略的簡化法及類比法或者用板殼理論等方法對滾筒進行強度分析,計算結果不是很精確,應力的細微變化也很難描述清楚。
  8. According to the experimental results of the four knots designed for it, we has arrived at that the dimensional angle iron framework is truly efficient to knot

    通過對試驗的分析及與理論計算結果的對比,發現與預策的很接近,說明空間角鋼骨架切實能夠有效地提高節點抗震性能的各項指標。
  9. Because it is hard to mesh for small angularity in the body, especially spline, so we have to simplify these parts. we adapt two methods to simplify them, and choice the better one to calculate the strength of the shafts. above all, we also optimize the shafts structure

    針對實體構存在小角度問題給網格劃分帶來的困難,本文對構進行了必要的簡化,並通過兩種簡化方式的對比,從中選擇了較為合理的一種,使計算結果更為準確。
  10. Perfect pre - processing and post - processing function is one of the main factors to evaluate the vitality and market value of the finite element analysis system surveying today development of finite element analysis technology, most of which concentrate on establishing fine user interface, also has some limitation on application, and especially, the research on the visualization of arbitrary cut - plane is always in ascendants to realize the visual processing on cut - plane needs reprocessing the results of finite element analysis which have get, so the algorithm is two parts : seeking the physical value of cut - plane and drawing 2d contours, the former, based on the theory of stress on " arbitrary inclined plane " in physical mechanics, use the method of linear interpolation method to get the coordination and physical value of intersection between cut - plane and element arris ; the latter, based on the tables on elements, nodes, stress and strain, summarize a rapid algorithm of generating 2d contours based on the grid. this thesis synthesizes there two parts and get a visual processing program under fortran

    縱觀有限元分析技術的發展,目前大多集中在建立良好的用戶界面上的研究仍存在許多應用上的局限性,其中對任意剖面上可視化的研究仍處于方興未艾的階段。要實現任意剖面上可視化處理,必須先將得到的有限元計算結果進行再處理,因此在演法上分為兩部分:求任意剖面上物理量值的演法及二維等值線演法。前一部分以彈性力學中「任意斜截面的應力」為理論基礎,利用線性插值方法得到截面與單元棱邊的交點坐標及交點物理量值;在此基礎上;根據已得到的單元及節點序號表、應力應變物理量表,總出一種基於有限元剖分網格的快速生成二維等值線的演法。
  11. With the help of the electronic computers, engineers employ it to figure out nearly all kinds of engineering problems ranging from astronavigation, construction, waterpower projects, ship - building and mechanical engineering etc. owing to the strong power of finite element method, one kind of software pack which based on the method is exploited and named algor feas to resolve problems on structure analysis for trusses and shells. this paper also employ algor feas software pack to analyze and compute the cableway towers, giving the accurate result on stress and displacement both in location and whole. finally, we also bring out some advice on structure improving

    在此分析過程中:首先將物理模型簡化為力學模型,主要是將塔架構按空間桿單元簡化為空間桁架構,目的是將力學模型變換為數學模型;這一過程主要是利用autocad2000建立塔架的模型;再者,利用algorfeas軟體包讀入autocad建立的塔架模型生成初始數據卡利用機進行編程進行風載,再將論整合入algorfeas產生的初始數據卡中,生成數據卡;接著,利用algorfeas軟體包塔架在不同載荷情況下的應力圖,位移圖,並且求出在不同載荷條件下的最大位移和最大應力等;然後,對塔架的穩定性進行分析;最後;根據計算結果提出改進建議。
  12. Compared with the observed result in clinical experience, atheroma often occurs at the place where the wss is greater and less, this experience is corroborated by the result obtained in the numerical simulation, that is to say, where the higher or the lower the wss is, where it is more possible for atherosclerosis to take place

    因此,在建立幾何精確建模和方程求解上可以節省相當的時間和精力,並能使一部分工作得到簡化,所以能夠克服通常編程時一些細節上的煩雜,將主要精力放到計算結果的后處理和的分析上,以便為;臨床提供更多有價值的
  13. Furthermore, to make the stress analysis of bank slope easier and more intuitionistic, the author develops a special post - processing software for fem to visualize the calculating results of fem. the engineering applications show that the software is banausic

    為了便於岸坡有限元計算結果分析,作者開發了有限元后處理軟體,工程應用說明該軟體使用方便,對有限元計算結果進行了可視化處理,從而使得岸坡穩定性分析更加直觀方便。
  14. The computational result suggests this system can solve practical engineering problem rightly and efficiently and owns the biggish applied value

    計算結果表明,本系統能正確有效地解決實際的工程問題,具有較大的實用價值。
  15. Let 's make a check on his calculation.

    讓我們查核一下他的計算結果
  16. Also, they were favor for further explanations and canalization. the results of solar heating rate and infrared cooling rate and the model output were displayed as data forms and curves in the paper

    文中將加熱率和冷卻率的計算結果以及與之相關的模式計算結果(可見光波段的大氣輻射收支和紅外波段的大氣輻射收支)以數據表和曲線圖的形式列出。
  17. The result shows that it is practicable to analyze the fuzzy risk of earth dam. with fuzziness considered, risk falls into circumscription category, and it is more reasonable and in more accordance with actual engineering compared with the traditional risk determinative value

    計算結果表明:對大壩進行模糊風險分析是可行的,考慮了模糊性的模糊風險為區間值,該區間值較傳統的風險確定值更為合理,更符合工程實際。
  18. The results show that the measurement result is in concordance with the result of calculation by theory on powder - pulse - booster impulse

    研究表明:單擺試驗測量火藥脈沖助推器沖量與理論計算結果基本一致,證明了此實驗方法的正確性。
  19. In most cases, it was found that the jb criterion is safer than hg specification, but adverse result was obtained when r / r is close to 0. 8 and d / t is too small ( less than 40 ). code in c language was worked out for simplifying the calculation

    在大多數情況下,按照jb標準對此種構進行補強設時其安全裕度要比hg標準為高;但是當開孔率接近0 . 8且d t很小時(不大於40 ) ,依jb標準補強設后的安全裕度反而較按hg規范計算結果要小。
  20. The results from the pollen densitometers indicate the number of pollen grains sucked into a device per square millimeter of the aperture.

    花粉顯像密度計算結果,可以表明每一平方毫米孔徑上吸入的花粉粒數。
分享友人