設備分組配置 的英文怎麼說
中文拼音 [shèbèifēnzǔpèizhì]
設備分組配置
英文
device grouconfiguration- 設 : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
- 備 : Ⅰ動詞1 (具備; 具有) have; be equipped with 2 (準備) prepare; provide with; get ready 3 (防備...
- 分 : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
- 組 : Ⅰ名詞1 (由不多的人員組成的單位) group 2 (姓氏) a surname Ⅱ動詞(組織) organize; form Ⅲ量詞(...
- 配 : Ⅰ動詞1 (兩性結合) join in marriage 2 (使動物交配) mate (animals) 3 (按適當的標準或比例加以...
- 置 : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
- 設備 : equipment; device; facility; implementor; apparatus; installation; appointment; furnishing; setou...
- 配置 : dispose (troops, etc. ); deploy; allocation; collocation; configuration; positioning; allotment
-
To meet the service support requirements of the maintenance and repair vehicle for field medical equipment, the analysis of electric power for war - time maintenance and repair, generating set selection and installation design are performed. a series of technique improvements are also involved in, which make the generating system and vehicle integral design merge into an organic whole and provide a scientific and convenient electric power support for war - time maintenance and repair
為使車載發電機更好地滿足野戰衛生裝備維修車開展維修保障需要,在車輛研製過程中,對戰時維修用電進行了詳細的需求分析、發電機組選型和安裝設計,並對常規配置的小型柴油發電機進行了一系列的技術改進,使得野戰衛生裝備維修車的發電系統與車輛整體設計融為一體,為戰時開展維修工作提供科學、便捷的電力保障。In order to improve the quality of service and enhance the operating efficiency of ccs, an intelligent supporting platform ( isp ) is designed and applied to the system. the basic goal of isp is to get more comprehensive management information about ccs, to assess operators " behavior with more scientific method, to train employees on the network and help operators with more functional database. the main goals of isp are as follow : 1
本文以充分發揮該系統的潛能為目標,深入研究了指揮調度通信系統的使命、特點,指出該系統存在著服務質量不穩定、訓練成本過高、系統可靠性不高、設備配置和網路組織不盡合理、管理能力弱等問題,提出了旨在提高系統管理效率、充分發揮系統效能的智能支撐平臺建設構想,明確了智能支撐平臺建設的目標和原則,考察了系統應用的效果。Faraday rotation spectra was measured on samples with model cgx - 1 fr test apparatus by ourselves using the magneto - optical modulated double - frequency method. the development on magneto - optical material and devices, especially on rare - earth ion garnet, were reviewed. as a solution to the problem for temperature stabilized and wideband magneto - optical materials which could satisfy the development of magneto - optical devices for integration and miniaturization, a modified liquid phase epitaxy ( lpe ) technique was brought forward to grow thin film yb3fe5o12 onto substrate ybilg or thin film ybilg onto sustrate ybig
本論文工作包括對ybiig 、 ybig系列石榴石薄膜制備的實驗構想、相圖分析、制備工藝分析和配方設置,搭建了液相外延設備;比較系統地研究了ybiig 、 ybig系列石榴石薄膜的生長、測試,首次成功制備了ybig ybiig 、 ybiig ybig ggg系列復合膜,並採用xrd 、 sem 、 epma等方法對所得樣品進行了結構、組分和微區形貌分析,用紫外可見光光譜儀測試了其在可見近紅外波段光吸收。Low - voltage switchgear and controlgears assemblies - part 3 : particular requirements for low - voltage switchgear and controlgear assemblies intended to be installed in places where unskilled persons have access for their use - distribution
低壓開關設備和控制裝置組件.第3部分:預計在非專業人員可能進入的場所中使用低壓開關設備和控制裝置組件的特殊要求.配電盤Answer : preparative job includes : understands workplace one, the moving circumstance of 2 equipment, this job has with moving equipment without direct connection, have the job that cooperates without need with other team and group ; makes working priority discipline and the blemish that prepare to solve and weak point ; the staff member makes clear to divide the work and be familiar with the concerned data such as blueprint and test gauge cheng ; should be had the blueprint that agrees with actual state, record that examines last, newest rectify spare parts of the instrument that decides requisition, test gauge cheng, qualification, machine parts or tools kept in reserve, tool and join lead to wait ; is a few righter important equipment, especially complex protector or couplet jumps loop protector, should weave test program, working controller should fill in ticket of protection safety precaution, examine and approve via technical chief, just can carry out
答:預備的工作包括:了解工作地點一、二次設備的運行情況,本工作與運行設備有無直接聯系,與其他班組有無需要配合的工作;制定工作重點項目及預備解決的缺陷和薄弱環節;工作人員明確分工並熟悉圖紙與檢驗規程等有關資料;應具備與實際狀況一致的圖紙、上次檢驗的記錄、最新整定通知單、檢驗規程、合格的儀器、備品備件、工具和連接導線等;對一些重要設備,非凡是復雜保護裝置或有聯跳迴路保護裝置,應編制試驗方案,工作負責人應填寫繼電保護安全措施票,並經技術負責人審批,方能實施。Low - voltage switchgear and controlgear assemblies. part 5 : particular requirements for assemblies intended to be installed outdoors in public places. cable distribution cabinets for power distribution in networks
低壓開關設備和控制裝置組件.第5部分:安裝于室外公共場所組件的特殊要求.網路電力配電用電纜配電盒Result the emergency control ability has improved a lot since the last three years, including those aspects : emergency institution construction, organization construction, functions, project constitution, human resource collocation, material storage, fieldwork of disposition, rapid testing, emergency drilling and training
結果三年來,疾病預防控制機構的突發應急工作能力有了明顯的進步,這種提高反映在以下幾方面:突發公共衛生事件制度建設、組織建設、職能分工、預案和技術方案制定情況、人力資源配置、物資儲備、現場處置、快速監測和應急演練和培訓。Low - voltage switchgear and controlgear assemblies ; part 3 : particular requirements for low - voltage switchgear and controlgear assemblies intended to be installed in places where unskilled persons have access for their use ; distribution boards ; amendment 1
低壓開關設備和控制設備組合裝置.第3部分:用於安裝在非熟練人員可能進入使用的場所的低壓開關設備和控制設備組合裝置的特殊要求:配電盤.修改件1Low - voltage switchgear and controlgear assemblies - part 3 : particular requirements for low - voltage switchgear and controlgear assemblies intended to be installed in places where unskilled persons have access for their use ; distribution boards ; amendment 2
低壓開關設備和控制設備組合裝置.第3部分:用於安裝在非熟練人員可能進入使用的場所的低壓開關設備和控制設備組合裝置的特殊要求:配電盤.修改件2The appreciated combination and planning of the space in kitchen & toilet are conceived according to the current behavior habit of the chinese in kitchen & toilet combined with human engineer. the principle of everything served to people is the soul of the design. according to this principle, some ideas and methods suit to the design of kitchen & toilet of affordable decent housing are conceived, ie
針對目前存在的問題進行深層次的分析研究,剖析其原因所在;並結合壩代生活行為模式和對廚衛間的使用行為規律,依據人體工效學原理,獲得經濟、適用的空間組合尺度和布局關系;同時,對設備設施的配置進行了系統分析和綜合比較;對廚衛的環境、環保以及節能、節水等方面也進行了深入系統的分析和論證。The main idea of this hybrid algorithm is : at first, all candidates in task collection is lined according to a dispatching rule ( earliest due date, edd ), then this linear queue is divided into some tiers under a criterion that partial order is not allowed to exist in the every tier, many feasible sequences is generated by constructing a neighborhood of a initial sequence in every tier, the allocation of the resources over time is conducted to perform every feasible task sequence, and a set of approximate optimal scheduling schemes is achieved as the precondition of the next tier ’ s disposal in meeting multiple scheduling objectives to obtain the global near - optimal schedule which makes these program run tier by tier until the last task is completed
該演算法按照最早完工時間優先( ect )分派規則,先將參加排序的工序合併成一個串列序列,然後按照同層內不存在偏序關系的原則,將其分解為若干個時間上相互銜接的層次,在每個層次內部,通過構造鄰域產生出多個可行序列,對每個可行序列進行設備配置,採用鄰域搜索演算法進行方案的尋優,保留一組滿足評價要求的可行方案作為下一層設備配置的背景環境,通過層層遞進最終獲取全局的近似最優解。When using the optional pcsa - dsm1 data solution module, which is neatly integrated into the rear of the unit, the sony pcs - tl30 is capable of sending or receiving any image that can be displayed on a pc presentation data in native xga resolution during a video conference. and because the pcsa - dsm1 is equipped with an rgb out connector, presentation data from the pcs - tl30 can be enlarged by connecting the unit to equipment such as a projector or a large display
使用選購的pcsa - dsm1資料分享器模組時,該模組整地集成在設備的後部, pcs - tl30能夠在視頻會議中,以xga解析度,發送或接收pc機上所能夠顯示的任何圖像會議報告數據.而由於pcsa - dsm1配備rgb輸出介面,因為可以將系統與投影機或大屏幕顯示屏等設置連接起來,放大pcs - tl30輸出的會場報告數據The purpose of measuring spectral absorption spectral experiments is determined. the makeup of experiment instruments is introduced and the configuration of testing system is performed
確定了吸收光譜分析實驗的目的,介紹了實驗儀器設備的組成,對實驗系統進行了配置。A removable cover assures enough space to lay line while the floor is low. the floor is equepted with the management of the laying of line and chese - like conpound line laying. all that provides sufficient layout and configuration of line for modern official networks as well as enough expanding space for years later
,活動式蓋板設計,保證了地板系統鋪設較低時仍有較大的布線空間,地板系統配備有先進的線路管理功能,棋盤式綜合布線,模塊化組裝方便,為現代辦公網路提供了充分的線路規劃及配置,即使若干年後也留有辦公設備擴展餘地。Adsl is generally apply to the soho accessing to internet, we present the design of the adsl soho gateway, including the hardware and software implementation. both hardware and software are contracted designed, we adopted elansc520 as the cpu, plus 2m flash and 16m sdram, and it ' s a typical example of embedded system. we adopted itex ' s apollo 3 pci solution as the uplink end, realtek 8029 and wlan at the other end. we adopted linux as the gateway operating system and integrated some application with it to implement dhcp, snmfj and firewall etc
我們採用amd公司的elansc520做網關的cpu , 2m的flash , 16m的sdram , rs - 232介面,這些可以看作是嵌入式系統的典型配置,採用itex的apollo3adslpci解決方案作internet的接入部分,即上行埠uplink ,另一側為以太網或無線局域網接多用戶,介面為rj - 45 ? ? o和無線訪問點( ap )天線,提供了靈活方便的組網方式,可以廣泛應用於家庭,小型辦公室的接入,如pc機、筆記本、列印設備的互聯。This paper also puts forwards several solution based on the conception of design patterns and frameworks which are signify to the reality of dynamic re - configurable property of drcmis. the mechanism and concrete procedure of developing method based on component technology is also introduced and analyzed via a topical case in the end of the final
文中針對系統適應bpr所需具備的動態可重配置特性,給出了採用設計模式、面向對象框架和基於corba規范實現系統整合的解決方案,並通過一個局部開發範例的介紹,分析了基於組件的系統開發過程的各階段的工作要項及其主要描述模型的具體形式。Since many data are handled, the fiber - optic net is needed in the central control room. the data include the process tags from the control stations, the orders to the control stations, and the data from internet. especially the " three defend " center can be connected in the key moment
現場設備層採用profibus現場總線技術,連接現場分站的控制設備,可收集處理現場運行數據、對控制分站發送控制指令,並可與「三防」中心相連,組成遠程網路調度和監測系統,以期達到水資源優化配置和宏觀預測的目的。The paper presents a big descriptions on the automatic material tracking system from design to controls in the no. 2 galvan - aluminum processing line. detailed descriptions have been made on the layout, equipment features to be used for designing the configuration of the automation system and its typical control design as well as the material tracking system
從機組的生產工藝布局、設備特點分析及生產工藝參數的分析描述中尋求自動化系統的設計方案及系統配置和組成,進而論述機組自動化系統的典型控制方案,同時對物料跟蹤系統進行了詳細闡述,結合生產工藝給出了具體的實施方案和控制思想。分享友人