設梁托 的英文怎麼說

中文拼音 [shèliángtuō]
設梁托 英文
corbeling
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • : Ⅰ動詞1 (向上承受) support from under 2 (陪襯) set off; serve as a contrast or foil 3 (委託; ...
  1. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案計,對比幾種不同的換方案和節點及構造計,提出了「通筋穿柱法」做承臺, 「抗彎抗剪錨筋法」強化柱加固效果, 「鋼板箍法」做地基鋼筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用鋼筋砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺施工採用主筋橫穿柱身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  2. We are constantly comming ourselves to research and develop new products from established our products cover all types of storage equipments and the relevant equipment ( pallet, care, steel container, rollor conveyeer )

    公司自建立以來一直致力於物流備的生產、研發,產品覆蓋輕型、中型貨架、流利式貨架、重型橫式貨架、駛入式貨架、后推式貨架、閣樓式貨架及周邊備(物流容器、盤、推車、料箱、輸送輥道等) 。
  3. In this paper, the steps and frame of analysis and design is presented and the influence of column capital, drop panel, edge beam and flat beam on structural analysis is introduced

    在本文中,還給出了預應力混凝土板柱結構用等代框架法進行分析和計的步驟和框圖,闡述了柱帽、板、邊、扁對結構內力分析的影響。
  4. Security group : composed by one rifle squad and one tank platoon in order to protect the bridge conquested on the road tschaltir - rostov and to block the roads leading to krim and tschaltir

    保障群:由一個步兵班個一個坦克排組成,目的是保護特查爾梯-羅斯夫道路上已經攻佔的橋和在通向克里米亞和特查爾梯的道路上置障礙。
  5. Quote : - security group : composed by one rifle squad and one tank platoon in order to protect the bridge conquested on the road tschaltir - rostov and to block the roads leading to krim and tschaltir

    保障群:由一個步兵班個一個坦克排組成,目的是保護特查爾梯-羅斯夫道路上已經攻佔的橋和在通向克里米亞和特查爾梯的道路上置障礙。
  6. The results show that the antipunching shear bearing capacity and ductility of frame column underpin system are improved by installing coupling bar at the interface of the new - to - old concrete and enlarging the reinforcing bars at the centre and upper position in the underpinning beam

    結果表明:置新老混凝土界面連接鋼筋和增大中部和上部配筋可提高框架柱換體系的抗沖剪承載力和延性。
  7. According to a practical non - conventional type column head concrete replacement project, authors introduce some aspects of the continuous trim joist split replacement technology including its design calculation, construction methods and technical measures and so forth

    通過某工程異形柱頭混凝土置換實例,介紹了連續分次置換技術的計計算、施工方法和技術措施等。
分享友人