設站河流 的英文怎麼說
中文拼音 [shèzhànhéliú]
設站河流
英文
gauged stream- 設 : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
- 站 : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
- 河 : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
- 流 : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
- 河流 : rivers; stream
-
Taking the reach with fluctuating backwater area in jiaokou hydroplant in xiujiang river, guanxi zhuang autonomous region for instance, this paper analyzes the water - sediment characteristics of the fluctuating backwater area, calculates the design level of this reach with samples of level and discharge, etc., and propounds the determination method for the designed lowest navigable level of reach with fluctuating backwater area
以廣西繡江交口電站的變動回水區河段為例,分析了變動回水區的水沙特性,分別利用水位、流量樣本及不同方法計算與分析本河段的設計水位,提出了變動回水區河段設計最低通航水位的確定方法。And from the end of the reservoir, a 3 - mile long aqueduct would gravitate water to the shenzhen reservoir. from the reservoir, water further gravitates to hong kong. the dongshen water supply scheme started at the qiutou (
東深工程運河起自廣東省東莞市橋頭縣,流經司馬、旗嶺、馬灘、塘廈、竹塘、沙嶺、上埔、雁田及深圳等地,全長83公里,主要建設包括6座攔河閘壩和八級抽水站。In order to eliminate the hidden trouble caused by storm runoff erosion, the mechanism of the storm runoff erosion on the slope surface of the yellow river dykes has been studied in this thesis. through the simulation rainfall experiments and field observations, the formation mechanism of storm runoff scouring, rills and sockets have been opened up. meanwhile the possible control measures have been suggested
為了防治黃河大堤由於暴雨徑流沖刷造成的不安全隱患,本文針對黃河大堤上的暴雨徑流侵蝕進行了實地設站觀測及室內模擬降雨侵蝕試驗,通過揭示大堤暴雨沖刷過程機理,查清水溝、水穴(浪窩)等的成因,提出相應的防治對策。A number of statistical and analytical works have been done by the institutions such as thethird shipping affair engineering and relonnissanle design institue of ministry of communications, hohai university, yangize valley water hudroprower planning and institule, nanjing hydraulic research institute and so on [ 25 - 30 ]. in 1993, the correlation analyses based on the data from the short - term situ - observation at near sea - route of the yangtse river estuary and the ship - stations were carried out to deduce the wave factors used in the engineering design
交通部第三航務工程堪察設計院、河海大學、長江流域水利規劃設計院、南京水利科學研究院等單位曾作過不少統計和分析工作[ 25 - 30 ] ,在九十年代前期,人們曾根據長江口深水航道或附近短期實測資料與引水船站進行過相關分析,進而推算出設計波要素。In addition, he translated the cream of cultural relics in shaoxing ( volumes 1 and 2, chinese - english translation ) for the cultural relics bureau of shaoxing city, installation manual for continual casting line of hangzhou steel mill for the no. 13 national metallurgy construction engineering company ( chinese - english translation ), technical documents for the bearing company of wanxiang group ( chinese - english translation ), technical documents for the hangzhou nardi machinery co., ltd. ( english - chinese translation ), technical documents for the taizhou fengrun biochemical co., ltd., profiles of auto parts firms for the jindian ( golden idea ) advertising company of yuhuan county, fsr of wastewater treatment project for the shanghai municipal engineering design general institute, fsr of cultural heritage conservation project for huahui design institute of shaoxing, ea report of cultural heritage conservation project for zhejiang environmental science research and design institute, website homepage and patent documentation of the zhejiang galaxy flood materials company, theses of ciob ( chartered institute of building ) training courses held in shanghai, abstracts of master degree theses for graduates of zhejiang university, solicited articles on rediscovering zhejiang ( english - chinese translation ), wuyi painting album used at the world poverty reduction conference jointly held by the world bank and the central government of china in shanghai, painting album of the new century tourism group, menus for hangzhou dahua hotel, etc
此外,還為紹興市文物局翻譯了紹興文物精華上下冊(漢譯英,正式出版物) ,為中國十三冶翻譯了杭州鋼鐵廠連鑄生產線安裝說明書(英譯漢) 、為杭州萬向集團軸承公司翻譯了技術文件(英譯漢) ,為杭州納狄機械有限公司翻譯技術文件(英譯漢) ,為臺州豐潤生物化學有限公司翻譯技術文件,為玉環金點廣告公司翻譯了多家汽車配件公司(廠)簡介,為上海市政工程設計研究總院翻譯了某污水處理廠項目工程可行性報告(漢譯英) 、為紹興華匯設計院翻譯了工可報告、為浙江省環保科學設計研究院翻譯了文化遺產保護項目的環境評價報告,為浙江銀河防汛物資公司翻譯了網站主頁和專利產品文獻,為上海的ciob (英國皇家特許建造學會)研討班翻譯多篇結業論文(漢譯英) ,為浙大研究生翻譯多篇論文摘要(英譯漢) ,為浙江外事辦公室翻譯中國加入世貿組織與政府職能轉變(英譯漢) ,為浙江省對外友好協會和錢江晚報的外國友人看浙江的徵文多篇(英譯漢) ,為武義縣翻譯了減貧經驗交流材料武義畫冊(用於在上海召開的世界扶貧大會) (漢譯英) ,為開元旅業集團翻譯了介紹畫冊(漢譯英) ,為杭州大華飯店翻譯了菜單(漢譯英) ,等等。In the first part, we compute the site design flood of given design frequency ( 0. 01 %. 0. 1 %. 0. 2 % and 1 % ) using the design flood hydrograph. then we get the design reservoir inflow flood of the same design frequency by the resultant discharge method. according to the computing value we compare the site design flood and design reservoir inflow flood of different time interval
本論文以廣西紅水河龍灘水電站為例,在第一篇中採用洪水過程線法計算了給定設計頻率為0 . 01 、 0 . 1 、 0 . 2和1的壩址設計洪水,並利用合成流量法計算了相應設計頻率的入庫設計洪水。Combined with the significant project - gongboxia hydro - power station construction, emphasized on construction during flood period of power station construction period, the climate character of the upstream of yellow river basin and the practice operation state of cascade reservoirs are analyzed, some problems in construction during flood period such as flood propagation time, interval flood discharge forecast, construction risk, flood period pre - alarm and longyangxia reservoir ' s function on construction of gongboxia are also studied, with an aim at presenting real interval flood forecast scheme and dispatching method, so as to provide technological support for gongboxia hydro - power station construction period
本論文結合國家重點工程項目?公伯峽水電站的建設,以電站建設期施工渡汛為研究重點,從實施出發,分析黃河上游氣候特性和梯級水庫群的實際運行狀況,對施工渡汛中的主要問題?洪水流達時間、區間洪水預報、渡汛風險、汛期預警、龍羊峽水庫在渡汛中的作用等進行了比較全面深入的研究,目的在於提出可用於實際的區間洪水預報方案和調度方法,為公伯峽水電站施工期建設提供技術支撐。Shengxian wang : 1991. 8 ~ 1994. 9, assistant engineer, yancheng chemical fiber factory, jiangsu ; 1999. 4 ~ 2001. 9, lecturer, secretary of degree committee in college of material science and engineering state key lab of concrete material research, tongji university, shanghai, china ; 2001, 9 -, senior research scientist, chemical technology lab, ge ( china ) research and development center
姜樂華: 2005至今,主任,國防科學技術大學指揮軍官基礎教育學院渡河指揮系工程裝備教研室; 2002 - 2004 ,博士后,國防科學技術大學機械與電子工程博士后流動站; 2001 - 2002 ,副主任、副教授、碩士生導師,國防科學技術大學工程兵學院機械教研室,學校「十五」學科(載運工具運用工程學科)建設負責人兼學科帶頭人。Detailed diagnoses is made on a heavy - hard rain in the northeast qinghai - xizang plateau using ncep data of 1 x 1 with 6h intervals, more complete and integrated conventional observational data and the data set of automatic meteorological stations in plateau and new generation doppler radar data and satellite images and etc. the following conclusions can be drawn : 1. the distribution of heavy - hard rain, which is characteristics of valley topography in northeast qinghai - xizang plateau is obviously effected by topography. the distribution of yearly mean precipitation and the frequencies of heavy - hard rain in this area are descending from east to west
本文首先利用ncep時間間隔為6小時的1 1的格點資料、更全面、更為完整的常規探測資料和高原地區布設的自動氣象站資料、新一代多卜勒天氣雷達資料、衛星雲圖資料等對高原東北部地區大到暴雨的天氣、氣候特徵及大尺度環流背景進行分析,形成對高原暴雨的整體認識,並為以後的數值模擬提供大尺度環流背景及依據,分析中發現: 1 、高原東北部地區大到暴雨的分佈明顯受到地形影響,年降水量和大到暴雨次數自東向西呈階梯性遞減趨勢,分別在高原東北部的外流河谷地區和四川北部地區存在大值中心。Influence of construction of the supahe river cascade hydropower projects on the river basin ecological environment
蘇帕河梯級電站建設對流域生態環境的影響The axial flow type turbines manufactured by the ganfa, are raging from 3 to 45m in water head, 100kw to 30mw in capacity and 0. 8 to 6m in runner diameter. in recent years, ganfa gained fast growth in this type of turbines. since manufacturing type zz560 - lh - 250 3. 2mw units for the nanhe power station in jiangxi, ithas also manufactured type zdjp502 - lh - 275 5. 5mw units for the niubilong power station in chongyi, jiangxi, and zd680 - lh - 420 4. 5mw units for the shamaoshi power station in shanghang, fujian
我公司軸流式水輪機適應水頭345m ,轉輪直徑0 . 86m ,容量10030000kw ,自80年代為江西南河電廠生產zz560 - lh - 250型3 . 2mw機組以來,軸流式機組有較快的發展,近年來又先後為江西牛鼻壟電站設計製造了zdjp502 - lh - 275型5 . 5mw機組,為福建上杭電站設計製造了zd680 - lh - 420型4 . 5mw軸流式機組。Answer 5 : although the detailed planning of the area north of the qinhuai xin river ( for detail see appendix 1 ) has been compiled, influenced by the scale, layout, streamline organization the nanjing south railway station, the planning offers only a preliminary conception on the land use, development intensity, public facilities around the nanjing south railway station
答:南京南站地區已編制有《秦淮新河以北地區控制性詳細規劃》 (詳見質疑附件? 1南京南站周邊土地利用規劃圖) ,但由於南站周邊地區規劃受南站站房的規模、布局、流線組織等影響很大,因此,在站房設計未初步明確的情況下,控制性詳細規劃對南京南站周邊地塊的用地性質、開發強度、公共設施配套等的規劃方案僅為初步設想。The selection of impoundment level and dam site, the general layout, the design optimization of structures, construction diversion and construction period all are the important context of the design of hydropower station across river with low head
蓄水位選擇、壩址選擇、樞紐布置、建築物設計優化、施工導流與工期等是低水頭河床式電站設計的重要內容。Firstly in the paper the research of hydraulic characters and the optimize of structure have being carried out on the four bigger design schemes of permanent internal dissipation discharge tunnel reconstructed from the right bank ' s diversion tunnel of gongboxia power station with a method of theoretical analysis combined with test comparisons. on this basis, two form swirling flow internal dissipation schemes, vertical and horizontal axis are recommended to the construction unit of the station as the schemes to be selected next
本文採取理論分析與試驗比較相結合的方法,首先對黃河公伯峽水電站右岸導流洞改建為永久式內消能泄洪洞的四個較大設計方案進行了水力特性的試驗研究與體型優化,在此基礎上,向建設單位分別提供了豎井旋流內消能的推薦方案與水平旋流內消能的推薦方案。分享友人