設要塞 的英文怎麼說

中文拼音 [shèyāo]
設要塞 英文
fortify
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : 要動詞1. (求) demand; ask2. (強迫; 威脅) force; coerceⅡ名詞(姓氏) a surname
  • 要塞 : fort; fortress; fortification; stronghold要塞區 garrison area
  1. To solve the problem of two separating lobes in a child ' s pulmonary surgery, this paper introduces the design, manufacture and clinical application of the bronchus blocking tube, which can better ensure patients ' safety when anaesthetized

    為解決小兒肺手術兩肺隔離問題,提高圍術期麻醉安全性,詳細介紹了支氣管填導管的計、製作及臨床應用效果。
  2. In combination with project example of the application of microporous aeration and carrousel 2000 oxidation ditch process in a municipal sewage treatment plant, the advantages and disadvantages of the process flow compared with others were described ; the basic principle of degrading organic substance and removing phosphorous and nitrogen by means of the process flow was analyzed ; the main design parameters and economic and technical indices for various structures were put forward

    結合某城市污水處理廠採用微孔曝氣、卡魯爾- 2000型氧化溝工藝的工程實例,闡述了該工藝流程相對于其它工藝流程的優、缺點;分析了該工藝流程降解有機物及除磷、脫氮的基本原理;並提出了該工藝流程中各構築物的主計參數及技術經濟指標。
  3. The fortified height or citadel of an ancient greek city

    衛城古希臘城市的防的城堡或
  4. The spray area of this series of nozzle is formed by one or several continuous hollow cone - shape rings of concentric circles. the nozzle aperture will not be blocked up. it is mainly used for flue elimination, cooling of steel - making convertor. and redistributing in all kinds of washing towers. it also can be used for jar cleaning. used in cooling tower and fire apparatus

    該系列噴嘴的噴霧區域是由一個或幾個連續的同心圓空心錐環組合而成,不易阻,主用於煉鋼轉爐煙道除塵降溫及各種洗滌塔里的再分佈,也可用於清洗罐、冷卻塔、消防備中。
  5. I think those who know is how account wu system is installed, do not come with gibberish please prevaricate. thank

    我想知道的是帳務體系如何置,請不用廢話來搪.謝謝
  6. This article concluded the artificial recharge of ground water of beijing city over the past more than thirty years, and analyzed the reason why the development of artifiial recharge has been stagnated in recent years

    據調查,停灌原因主有:回灌單位停產、轉產、回灌井被占,回灌井阻,泵改調頻,單位搬遷和改換製冷備等。
  7. The thesis consists two parts : failure analysis of hydraulic axial piston pump and maintenance of hydraulic system

    論文主有兩個部分的內容:液壓軸向柱泵的故障分析和工程施工企業液壓備的管理和維護。
  8. As one of the four important parts of water hydraulic axial piston pump, the design of sliding shoes friction matching mainly takes hydrostatic bearing

    作為水壓軸向柱泵的四個關鍵組件之一,滑靴摩擦副的計主採用靜壓支承的方法。
  9. Butterworth - type and bessel function - type two ways are used for design of bandpass filter for receiver, and with the help of eda simulation tools, the bold plot and the group delay characteristics of the filters designed are compared

    採用巴特沃思型和貝爾函數型2種方法進行接收機帶通濾波器計,藉助eda對該濾波器進行波特圖和群延遲特性的比較。
  10. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    論述澤雅水庫面板堆石壩壩基處理和防滲的原則及點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的計和研究提供參考與借鑒
  11. Plunger extrusion molding mechanism of ptfe is introduced, process method and equipments for extrusion molding are also reviewed

    介紹了聚四氟乙烯懸浮樹脂柱擠出成型的原理,敘述了擠出成型加工的工藝方法及備。
  12. The forces acting on a sliding hoot, the key element of swash - plate axial piston pump. are analyzed and the formulas computing squeezing and repelling forces are derived ; the redundant squeezing force method is presented, including the selection of parts materials, squeezing force factor and the determination of geometric parameters of a sliding hoot

    分析了斜盤式軸向柱泵的關鍵摩擦副零件滑靴的受力,導出了壓緊力和分離力的計算公式;介紹了滑靴計方法中的剩餘壓緊力法,包括零件材料、壓緊力系數的選擇以及滑靴關鍵幾何參數的確定。
  13. With no way of turning off the connection and no means of reasoning with a force they cannot understand, a desperate group of college students must discover a means of stopping the takeover before the entire planet is transformed into a cosmic haunting ground for wayward souls in search of a home

    此時,佐殊再寄來另一封e - mail ,警告眾人這個螢幕通道,否則後果不堪想。可惜眾人已無意識地開啟了不存在的陰間頻率,收到連鎖信的同學接二連三地意外身亡。
  14. The autonomous underwater vehicle which carries liquid oxidizer and liquid incendiary agent and uses the outside seawater as coolant request the oxidizer 、 incendiary agent and coolant can supply the power system according to accurate proportion and reasonable flow on any condition. the system should have small volume and light weight and should be easily realized. the system and control mode introduced in this article can fit these requirements well

    控制或降低液壓系統油液的污染度和提高液壓元件的污染耐受能力是確保液壓系統可靠工作的兩個重方面,本文分析了液壓柱泵所在系統油液污染特性一定時影響泵污染耐受能力的諸多因素,指出了在結構形式確定的條件下計高污染耐受度液壓柱泵所求的摩擦副材料與主表面工藝
  15. Many geological and hydrological factors of the river section, where the yellow river water intake engineering is laid out, such as the capacity of the reservoirs along the river section upstream and downstream, the rate of the flow discharge, the erosion and silt of the watercourse, the form of the riverbed and the water current, ice tuck, the convergence of the upstream branches of the river section, flood crest, sand crest size, the capacity for flood discharge of the watercourse, the effect of flood control structure around and the impacts on surrounding environment and the third person " s legitimate rights and interests, should be considered

    黃河取水工程的布考慮工程所處河段的地質水文等諸多因素。如該河段上下游水庫的庫容,泄水流量、河道沖刷、淤積、河床形態、水流形態、冰、河段上游的支流匯入、洪峰、沙峰的大小、河道行洪能力的大小、周圍防洪工程的影響及對周圍環境和第三人合法權益的影響等等。
  16. You will experience this philosophy put into practice in utgarde

    你將會發現這種計思想在「烏特加德」中的實際體現。
  17. We hope you enjoyed this preview of utgarde keep and dungeon design in wrath of the lich king and look forward to seeing you in northrend

    我們希望你對這篇「烏特加德」的前瞻以及《巫妖王之怒》副本計的總結滿意,諾森德再見。
  18. The design process behind utgarde keep, and the other dungeons of wrath of the lich king, has evolved from years of experience developing for world of warcraft

    烏特加德,以及《巫妖王之怒》中其他的地下城的計流程,取自於計《魔獸世界》數年以來的經驗。
  19. In this article, the world of warcraft design team explores the goals and overall philosophies at the foundations of the five - person dungeons of northrend, and gives us a behind - the - scenes look at utgarde keep itself

    在此篇文章中, 《魔獸世界》計隊伍將揭示他們計所有諾森德的5人副本時遵循的主導思想和獲得的經驗,以及對烏特加德自身的幕後視點。
  20. If you go to the other side, to the borean tundra, the alliance comes into a giant alliance stronghold, with a brand new leader that we ' re building up - and a massive alliance steam ship

    如果你選擇了大陸的另一邊? ?北風苔原,那麼聯盟玩家將到達一個巨大的聯盟? ?由一個我們正在計的全新聯盟領袖統管? ?以及一艘龐大的聯盟蒸汽船。
分享友人