設計壓頭 的英文怎麼說

中文拼音 [shètóu]
設計壓頭 英文
design head
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 壓構詞成分。
  • 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
  1. Because of the technical complexity of the turbine for the three gorges project and on the basis of several important technical problems which have been defined in the international bidding documents for 14 generating units in the left bank power station, the owner of the project has decided another some important technical problems based on appraisal and comparison in the bid appraisal stage after the bidding documents are analyzed and the tender documents are cleared by the tenderers

    由於三峽工程水輪機技術上的復雜性和挑戰性,在左岸電站14臺機組國際招標文件已明確了若干重大技術問題的基礎上,在機組議評標階段,對招標文件進行分析和投標商對投標文件進行澄清說明后,經評議比選,業主又決策了幾個重大技術問題,主要有:水輪機的確定,負傾角葉片水輪機的應用,兩套水力,舍棄初期轉輪,蝸殼進行水試驗等。
  2. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截錐模型模擬地基,對地基(巖基)承載力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土工程界應用樁基規范中的難點? ?樁端巖基承載力的確定問題,從巖石室內單軸抗強度確定、基於彈塑性模型的有限單元法算、土力學算及深斤載荷試驗四方面進行了深入討論;本文作者根據多年現場載荷試驗的工程實踐,對深井荷試驗裝置的核心部分? ?反力裝置,了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。
  3. To meet the processing requirements before sintering, the pressed briquet was pre - calcined at 1150 to make it possess adequate processing strength at first and then was shaped through precise turning on the numerical control lathe according to the design diagram of the femoral head prostheses of partial hip joint

    為滿足燒結前坯體加工的要求,制后的坯體在1150預燒,使其具備一定的加工強度,然後按照半髖關節股骨假體的形狀尺寸圖在數控車床上進行精密車削成型。
  4. In the course of working, , the plow will make use of the shuttling method so that it can dig alternately either on the left or on the right. compared to the unilateral plow, it can improve the productivity because it can help leave off the soil 、 take from the consumed energy and reduce the empty journey. to meet the requests above, we will use a remote cylinder with both a small cubage and double functions, approximately designing the plow to be columniform and symmetric. after the experiment for a period in the field, we found that the most frayed areas had happened at the places of both plow shank and share and at the same time the base of the remote cylinder had ruptured suddenly

    與單向犁相比,其優點在於:耕地無開、閉壟,地表平整,降低了耕后整地的能量消耗,減少了地的空行程,因而大大提高班次生產率。為了滿足犁體梭式作業的要求,我們採用了一隻小容積雙作用的液油缸;同時對犁壁曲面的形狀採用了近似圓柱形的對稱。但經過一段時間的田間試驗,我們發現:該犁犁胸部分的犁脛和犁鏵上的犁尖在工作中磨損較為嚴重;主犁梁和油缸缸體的連接部分(即油缸底座)突然發生了斷裂,造成整個犁體無法正常工作。
  5. The additional flow is formed by the device of dentoid baffle, and the application of the device of dentoid baffle cooperated with a stilling basin has been investigated by systematic model tests. based on the research results, the hydraulic problems such as the characteristics of hydrodynamic pressure and cavitation on the head of the denotid baffle, the properties of flow under the condition that the device of denotid baffle is used with a stilling basin, the hydraulic computation about a stilling basin, the estimation of energy dissipation and its various affection factors, the mechanism and effect of energy dissipation, and distributions of velocity and pressure and aerating concentration, etc, have been analyzed ; the method and step of hydraulic design of device of denotid baffle by which the additional flow is produced has also been proposed

    文中利用齒墩施實現附加射流,對齒墩施與消力池聯合應用進行了大量的和系統的模型試驗,分析研究了中低佛勞德數條件下,齒墩墩的動水強及空化特性,齒墩施與消力池聯合應用時的流態特性,消力池的水力算,消能量的估算及其各種影響因素,消能機理和效果,消力池內的流速、強特性,摻氣濃度分佈等水力學問題,並提出了實現附加射流齒墩施的水力方法和步驟。
  6. Design of hot extrusion mould of roughcast of multi - joint thin - wall brazen valve body

    多接薄壁銅閥體毛坯熱擠
  7. 3. the mechanism of toe part pressing pad adopts adjustable 2 - stage pressure the design of compound cylinder helps shoes reach the best quality on the proceeding of wiper lasting and final pressing and ensure the smoothness of shoe lasting feather edge

    3 .鞋著機構採用可調二段式力,子母缸,使鞋子于掃刀結幫過程中及最後著能達到最後之著能達到最佳之效果,確保幫角平整。
  8. When the design pressure of the reactor / regenerator is less than or equal to the design pressure of the main fractionator, or there is some absolute mechanical limit to the regenerator pressure ( plus the static head difference between the regenerator and reactor ) that is less than the main fractionator design pressure, the units do not need large relief valves on the main fractionator

    當所反應器或交流熱換器的力小於或等於主分餾器,又或者有些機械上無可避免的限制(還有就是兩靜電的不同)小於交流熱換器的力,其時整個部件就不需要大的調劑電子管了。
  9. Hot extrusion technology and die design of oxygen spray nozzle

    氧氣噴的熱擠工藝及模具
  10. 2 ) the structure elements should be laid out symmetrically and uniformly when designing steeve - arch structure, what ' s more, the reasonable selection of section geometric size near the arch foots of first beams is paid attention to and the arrangement difficulties of steel bar due to the big eccentric pressures 2, the analyses of anti - seismic features on transverse direction of the aqueduct l ) the method of adjusting the elements " mass can be harnessed in order to even the layout of seismic loads

    2 )吊桿式拱架支承結構時,各部分構件應當均勻對稱布置。另外,還應注意道梁拱腳附近截面的尺寸擬定,克服地震內力造成的大偏心受狀態給結構配筋增加的困難。 2 、橫槽向抗震性能分析1 )可利用調整構件質量的方法,使得結構的某些構件的地震荷載分佈均勻一些。
  11. In this paper, firstly the macro parameter of the series connection app was comprehensively analyzed, among which the trajectory location of the bullet emission and the terminal velocity of the bullet were mainly analyzed, and the feasibility of the series connection app to cope with explosive reactive armor was demonstrated. and then the macro design about the head of the series connection app was made, among which a particular analyse about the bullet " s launching process was made, from which we concluded the relation between the thickness of the airproof loop and the velocity of the bullet detached from the carrier and the relation between the length of the bullet and the velocity of the bullet detached from the carrier and the relation between the length of the bullet and the burning rate of the powder and the relation between the length of the bullet and the maximum pressure of the emission hole and the relation between the length of the bullet and the emitting time of the bullet, and the reasonable str ucture of the head of the carrier and bullet were designed, then the intensity of the head of the carrier was checked out using of the software of ansys

    本文首先對子母式穿甲彈總體參量作了全面的算分析,其中主要分析了子彈射出的彈道位置和必要的子彈著靶速度,論證了子母式穿甲彈對付爆炸式反應裝甲的可行性,然後對子母式穿甲彈彈部進行了總體,其中主要對子彈的發射過程進行了詳細的分析,得出了母彈彈部發射孔內閉鎖環厚度與子彈飛離母彈速度的關系、子彈長度與子彈飛離母彈速度的關系、子彈長度與火藥燃燒率的關系、子彈長度與母彈彈部發射孔內最大力的關系以及子彈的長度與子彈發射所需時間的關系,出了合理的母彈彈部結構和子彈的結構,並利用ansys有限元分析軟體對母彈彈部的強度進行了校核。
  12. This paper studies to get the image of thenar by using a video camera, and carries on the necessary image processing by software with the information captured, and gets the ideal image to provide the image data basis for follow - up cad after the processing such as median filtering, sobel or kirsch ' s operator edge detection, image reversal and image enhancement etc. in this paper, the pressed image information of thenar captured by camera have been carried on processing and analyzing, and the result has been compared with that of image acquired by the scanner

    本文研究了利用攝像獲取腳底圖像,再通過軟體將所獲信息進行必要的圖像處理,經中值濾波、 sobel或kirsch運算元邊緣檢測、亮度調整及反置、圖像增強等處理后,得到滿意的圖像為后續的cad提供圖像數據依據。本文對攝像採集的足底受圖像信息進行了處理和分析並與掃描儀的圖像處理結果進行了比較,由結果得知攝像輸入方法是一種簡單實用的輸入方法,且能很好的滿足要求。
  13. In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively

    本文通過試驗研究與理論分析對旋流式豎井泄洪洞應用於高水、大泄流量情況時存在的一些水力學問題進行了研究和探討,取得以下主要成果:一、結合小灣工程導流洞改建,對高水( 252m ) 、大泄流量( 1400m ~ 3 s )條件下旋流式豎井中的水流運動特徵進行了比較全面的測量,包括空腔形態、徑向流速分佈及井壁強等;二、提出了豎井空腔段螺旋水流水力算方法,其算結果與實測值吻合良好;三、利用試驗與算結果,對旋流式豎井的消能機理進行了探討,對豎井各部分的消能能力有了總體認識;四、對豎井下部消力井的合理井深進行了優化試驗研究,發現消力井合理深度為0 . 9d左右;五、通過試驗研究,歸納出豎井水流總摻氣量估算方法,為導流洞排氣方案的提供了參考依據;六、在高水、大流量條件下,豎井空腔段下部流速很高,盡管水流螺旋運動引起的離心力可以確保井壁強保持正,但空化數依然較低,因此豎井的空化空蝕始終是工程界關注的重大問題。
  14. On the base of the basic structure study of the tooth - locked quick closure vessel of middle and low pressure with crown head, the optimization method of parameterized whole device is presented in this paper, the emphases of research is put on optimization of the tooth - locked quick closure device whose structure and load distribution is complicated, the wall of vessel, however, is designed according to the existing strength formula

    本文對帶有球冠形封的中、低齒嚙式快開容器的基本結構進行研究的基礎上,提出了齒嚙式快開容器的參數化整體優化方法,研究重點放在結構和受力復雜的齒嚙式快開裝置的優化,對于容器簡體壁厚仍採用現有強度公式
  15. In the part of the transmitter, the pre - amplifier logarithmic amplifier, temperature complement circuit, anti - disturbing circuit, and v / i circuit, are discussed. the transmitter outputs 4 - 20ma. in the part of the displayer hardware design, the i / v convert circuit and the flame intensity signal processing circuit are introduced

    在探中,詳細介紹了前置對數放大器電路,在對數放大器加入了溫度補償電路和抗干擾電路,以保證測量精度和較大的量程,最後信號經電電流的轉換,得到4 - 20ma的標準信號作為探的輸出信號,進行遠傳。
  16. In order to observe process and study the rule of producing and collecting dust, and to study the performance of high - voltage electrostatic dust - collecting system, a set of analog device is designed based on on - site measure for workshop of unloading coal of qing huangdao port

    對秦皇島煤碼翻車機房進行實地測量,製造了試驗模擬裝置。觀察翻卸作業起塵與收塵的物理過程,描繪起塵量與收塵量之間的變化規律。檢驗了高靜電除塵器的工作性能。
  17. In a short, answer to the optimizing length of porous pipe is very important in optimum design of trickle system

    毛管和支管的直徑以及力水一定的情況下,大於或小於毛管的經濟長度,都會使滴灌系統的費用增加。
  18. In case of a vertical veseel tested horizontally in the shop, the test pressure shall relate to the design pressure adjusted for static head when the unit is in the vertical position

    5如果立式容器在車間進行水平測試,測試力應相對力進行調整,當裝置在立式位置時調整靜封
  19. Large - scale compaction tests have been carried out and compared with design compacted standards before embankment in order to ensure embankment parameter for dam construction

    摘要盤石水庫面板堆石壩,在填筑前進行了大型碾試驗,復核實標準,確定各區築壩材料的填築參數,供壩體施工採用。
  20. Abstract : the effect of turbine characteristic on stable sectional area of surge tank can be expressed by the synthetic characteristic coefficient of turbine, it shows the effect of turbine efficiency. based on the analysis on the variation of the characteristic curve for middle or high specific speed turbine, this paper demonstrates that the largest stable sectional area of surge tank is not dependent on the lowest water head of hydroelectric plant but the design head

    文摘:通過理論推導,研究了水輪機綜合特性系數對調室穩定斷面的影響,即水輪機運行中不同工況點效率的相對變化對調室穩定斷面的影響.得出了最危險的調室穩定斷面取決于,並通過實例得到驗證
分享友人