設計委託 的英文怎麼說

中文拼音 [shèwēituō]
設計委託 英文
designentrusting
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 委構詞成分。
  • 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
  1. Envisagement about the reform of audit bailment in listed companies

    關于上市公司審改革的
  2. 2 ) the principal factors result in earning management include : clientage - agent model, debt covenant, political cost covenant, asymmetrical information, accounting policy, faultiness of accounting standard and accounting system

    盈餘管理形成機制的主要因素包括:代理關系、債務契約關系、政治成本假、非對稱信息存在、會政策選擇、會準則和會制度的不完善、信息披露制度不完善、上市公司治理結構等。
  3. A concession contract can be regarded as a payoff contract under the framework of principal - agent theory. it needs to meet the participation constraint and incentive compatibility constraint of concessionaire. the payoff designing can be analyzed by the backward - induction method

    特許權合約可以看作一個代理框架下的報酬合約,需要滿足特許權人的參與約束和激勵相容約束條件,報酬可以使用逆序遞推的方法分析。
  4. The party who can actively design the agreement is called consigner and the other party is called deputy who can only passively " accept or refuse the agreement

    在這一契約關系中,人們將能夠主動契約形式的當事人稱為人,而將被動地接受或拒絕契約形式中進行選擇的當事人稱為代理人。
  5. The paper also solves the incentive mechanism designing problem to the power consumer from the power supplier side when it invests the dsm energy saving program. it forms a principle - agent model on the dsm energy saving program investment. it gives the electricity - supplying enterprise a valuable method to incent the power consumer and extend the consumer electricity market

    論文還從供電企業的角度,運用?代理理論解決了投資基於dsm的節能項目時,供電企業對電力用戶的激勵機制問題,構建了基於dsm的節能項目投資?代理模型,為供電企業激勵電力用戶、擴大用電市場提供了一套有效的方法。
  6. He had a commission to design an office building

    他受到一棟辦公大樓。
  7. Develop a supportable piping project plan to include strategies and execution details for engineering design estimates equipment and manpower scheduling quality control / assurance construction / installation and start - up and commissioning

    制定管道項目劃,包括在工程,估算,備和人力的規劃,以及質量保障,啟動和安裝的方面的戰略和實施的細節。
  8. Develop a supportable process project plan to include strategies and execution details for engineering design estimates equipment and manpower scheduling quality control / assurance construction / installation and start - up and commissioning

    制定工藝項目進程劃,包括在工程,估算,備和人力的規劃,以及質量保障,啟動和安裝的方面的戰略和實施的細節。
  9. Unfortunately, the first five holes and the practice range were changed forever in the late 1960s when land was taken along the clubs northern boundary and san bruno creek filled in to accommodate a new expressway called westborough blvd. now, in 2007, kyle phillips golf course design is proud to restore the back nine holes and the classic design essence to many of the front nine holes. in order to achieve this goal, two new golf holes will be placed on vacant land already owned by the club

    凱爾菲利普斯高爾夫球場已得到了世界眾多投資商的認可與,其中包括成功了距離蘇格蘭聖安德路斯市6英里處,典型林克斯風格的kingsbarns高爾夫球場,此球場在2001年榮獲了高爾夫雜志排名的「世界前50個最佳的球場」的稱號同時該球場在同年2月榮獲了美國高爾夫摘要雜志的「全球最優秀新球場」的稱號。
  10. This text takes project of the dalian certain graduate school as the background. based on the dimmer at the current airport, a kind of new - type airfield light dimmer control system is presented

    本文以某研究所我校研究的項目為背景,在現行機場燈光調光器的基礎上,出一種新型機場燈光調光器控制系統。
  11. Foster and partners, the first - prize winner of the concept plan competition, was commissioned by sun hung kai properties ltd

    概念規劃比賽的冠軍作品是由新鴻基發展有限公司foster & partners的。
  12. Based on holmstrom ' s model and by the theories of client - agent and games, we design a model named pacemaker to solve free rider problem. it suggests that we allocate heavy bonus to the pacemaker and punish the scapegoat of the team when allocating incentive compensation

    本文在holmstrom模型基礎之上,運用代理理論和博弈論,了一種「業績標兵」模型,認為重獎內部評選的業績標兵並且引進「替罪羊」制度以懲罰偷懶者有利於抑制團隊內部中的「搭便車」問題。
  13. Responding to the call of industrial policy adjustment in our country, yaoyu special steel company has started replacing hot - rolling with cold - rolling in the production of electric steel since 2003. it entrusted xinye gaoke group to make design and build the production line of cold - rolled electric steel with annual output of 200 thousand tons. after three years of construction, it has achieved the successful trial production of 20 - roll mill and continuous annealing and coating machine imported from germany

    耀宇特鋼從2003年開始,響應國家產業政策調整的號召,開始電工鋼以冷代熱技改工程,新冶高科集團原冶金部鋼研院,進行年產20萬噸冷軋電工鋼生產線的建,經過近三年的建,目前從德國引進的20輥軋機及連續退火塗層機組均已試產成功,為提高產品的性能和質量,同時提升我國電工用薄鋼板的生產作出了卓越的貢獻。
  14. In the last several years, we have successfully accomplished many competition and entrust projects in shanghai, hangzhou, nanjing, changchun and other cities in china and we have been good fellowship with our clients since our wonderful service

    在過去的幾年裡,我們在上海、西安、杭州、南京、長春等地出色的完成了許多大型投標和,得到了業主的好評,並與之建立了良好的合作夥伴關系。
  15. Project showcases prototype furniture and home accessories at the oxo gallery by young designers commissioned by uk retailers, with the aim of bridging the gap between design, manufacturing and retail

    受英國零售商,一批年輕的師們在此展示樣板傢具和家庭用品,主要目的是為了縮短、製造和零售幾個環節之間的距離。
  16. From 1996 to 1998, as a project manager, i finished the studies on simple constructed venturi water film scrubber desulphurization technology and equipment for small and medium _ sized coal _ fired power plant. such studies are one of the projects required to rack one ' s brain with emphasis by ministry of science and technology in " ninth _ five _ year " plan. on the basis of the aboved researches, being entrusted with jiangxi provencial electric power bureau and guizhou provincial electric power bureau, we conducted the engineering feasible researches and preliminary design for nanchang power power plant and guixi power plant in jiangxi province, guiyang power plant in guizhou province, yongji power plant and taiyuan thermal power plant no. 2 in shanxi province to use venturi water film scrubber simple constructed desulphurization technology. the major technical targets of above consultation are around 70 % of desulphurization rate and improved dust removal efficiencies comparing with original efficiencies. the key features of this new technology are advanced and practical, low in investment cost, small in land occupied, suit for renovating the existing power plant and suited to chinese conditions

    1998年完成了"九.五"國家科技攻關項目< >的開發工作.在此基礎上,受貴州省電力局,江西省電力局,山西省電力局的,分別對貴陽發電廠,南昌發電廠,貴溪發電廠,永濟發電廠,太原第二熱電廠等進行了簡易脫硫技術的工程可行性研究以及初步等.上述咨詢內容中的主要技術指標是脫硫效率達到70 %左右,並可提高原除塵器的除塵效率.有投資低,佔地面積小,適合老廠改造,技術先進實用等特點
  17. To meet this challenge, a research project was supported by ministry of communication and bv shanghai zhenhua port machinery co. ltd. focusing on analysis of tdtcd ( traditional design theories of crane drums ) the paper has studied the impacts of features under the binding force of wire ropes, the end - plate and rope slot. this study is based not only on the thin shell theory and viscoelastic mechanics to calculate the strength and stability of drum, but also on an experiment with technology in " state of act "

    本文結合交通部重點科技項目「港口起重機鋼絲繩傳動件高性能技術研究」和上海振華港機股份有限公司項目「起重機焊接捲筒極限壁厚研究」 ,針對起重機捲筒傳統方法偏於保守的情況,以薄殼理論和近代力學為基礎,以現代試驗技術為研究手段,對鋼絲繩緊箍力作用下的外載特性、端板、繩槽等因素對捲筒強度和穩定性的影響進行了系統的理論研究,在深入開展捲筒強度、穩定性和實驗模態分析等試驗的基礎上,提出了有別于傳統方法的捲筒強度、穩定性算方法。
  18. In general, a firm begins collecting all kind of materials about economy development and environment after accepting a assignment, and then studying a feasible path based on one of these materials individually. these suitable paths will be compared and outline a final solution

    一般情況下,公路單位在接受設計委託后,要開始收集項目影響區經濟、交通發展資料和地質水文普查資料、各種比例的地形圖等資料,然後在此基礎上,對單個條件進行研究,再就可能的方案總體對比,才編制出該工程的線路規劃方案。
  19. If they want to reverse engineer at some point in time our design, they will be able to. however, they need to make a commitment also

    如果他們在我們時,對其中某些點要求進行逆向工程,他們將可以得到滿足.但他們還需要對此進行設計委託
  20. The owner and the successful bidder shall, within 30 days of issuance of the bid awarad notification, enter into a design contract to the extent that the contract is in no event in contravention with any content in the bidding documents and the bid documents, and perform all obligations as provided in the contract

    招標人和中標人應當自中標通知書發出之日起三十日內,按照不違背招標文件和中標人的投標文件內容簽訂設計委託合同,並履行合同約定的各項內容。
分享友人