設計施工經驗 的英文怎麼說

中文拼音 [shèshīgōngjīngyàn]
設計施工經驗 英文
design-build experience
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 經動詞[紡織] (把紡好的紗或線梳整成經紗或經線) warp
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
  • 施工 : be in the process of construction; be under construction; build; construction
  • 經驗 : 1 (由實踐得來的知識或技能) experience 2 (經歷) go through; experience; 經驗教訓 lessons from ...
  1. Hangzhou hing kwok - ting electronic intelligence engineering limited, established in 1995, the company has more acoustic experts, rich experience in the construction works, long in the field of architectural acoustics and audio video systems design optimization

    杭州興鼎電子智能化程有限公司,創建於1995年,公司擁有多名聲學專家,有著豐富的,尤其擅長于建築聲學的及音視頻系統的優化處理。
  2. Lightweight heat insulation sandwich corrugated steel had got golden prize of international invention patent technique new products exposition. nan yang color light steel house co., ltd is an old factory which produce large steel structure, color - steel sandwich board and roof titles die - mould board

    公司致力於活動房、鋼結構事業已有十余年,從水泥活動房到彩鋼組合房發展到今日的大跨度鋼結構廠房,既積累了豐富的、製作、,又增強了雄厚的濟實力。
  3. The precision of its calculating results has an direct effect on the design, construction and safe usage. in the typical calculation of the settlement of foundation, additional stress incurring by loading is calculated according to elastic theory which has the same characteristics in semi - indefinated space, the condesion of soil is decided by the condesion experiment of one - demension and the settlement is calculated by adding results of respective layer

    地基沉降算一直是困擾巖土程技術人員的一個難題,其準確與否將直接影響建築物的和安全使用。在典的地基沉降算方法中,荷載作用下地基中附加應力場是根據半無限空間各向同性彈性體理論算的,土體壓縮性是根據一維壓縮試確定的,並採用分層總和法來算地基的沉降量。
  4. With the research on design and construction specifications of subgrade slope protection, the author in this paper, based on the success experiences of subgrade slope protection all over the country, and considers the advanced technology and experience of abroad, analyzes the slope distress types and causes, and studies systemically the applicability and structure character of these slope protection model, then recommends the typical slope protection model which can used in the most area of our country ; according to the analysis and researches on the types of slope protection, this paper states selection principle of slope protection ; to get the statistical relations between slope surface erosion volumes and related factors, grasp the law of slope surface erosion on the whole, the simulate test of slope surface erosion is done in laboratory ; the drawing library software of typical slope protection is programmed by application the skill of autocad 2000 redevelopment and the tool of vba

    本文結合《路基邊坡防護技術規范》課題的研究,在分析總結全國各地邊坡防護方面的成功的基礎上,借鑒發達國家公路路基邊坡防護的先進和技術,剖析了路基邊坡的病害類型和原因,對各種類型的適用性及構造范圍進行了系統全面地研究;推薦出了適合我國大部分地區的邊坡防護型式;提出了防護類型選擇的原則;進行了室內邊坡坡面沖刷模擬試,得出填方路基坡面沖刷量與有關因素的統關系,從宏觀上了解坡面沖刷的主要規律;應用autocad2000二次開發技術,運用vba開發具,開發了邊坡典型防護型式圖庫。
  5. In this chapter, the basic concept of the system is summarized according to the main experience of the bridge ' s managing system in mainland and foreign, and the developmental history and present state of the bridge ' s managing system is reviewed ; the second chapter is the data managing subsystem. this subsystem is the base in the whole computer system. these data, that of bridge ' s design, record in the period of constructing, datum in experiment and that of datum by regular check and the check in important place, are all collected in this system ; the third chapter is the evaluated subsystem

    全文共分為七章:第一章是緒論部分,根據國內外橋梁管理系統實踐的主要,總結和概括了橋梁維修加固算機系統的基本概念,回顧了橋梁管理系統的發展歷史及現狀,確定了本文的研究方向和指導思想;第二章是數據管理子系統,收集了橋梁的記錄和試資料的數據,以及橋梁檢測資料包括通過常規檢查和重點部位檢查得到的相關數據。
  6. Technological innovation is the development of enterprises in the last word, i have always maintained the secretary rise in special wallssevered the forefront of the core system, in 2000, the high - intensity of my invention cesium potassium glass chip. test success has been on the market seven years, 2007 to special ( fire ) glass wallsindoor fire glass partition, fire glass window design, construction and 10 years of deep - processing glass curtain wall designconstruction and constantly sum up experience and experiment, glass walls severed system to fire. high temperature must be within the framework of anti - bomb material support fixed glass in the event of fire. at the time of the explosion have enough time to ensure the integrity of the entire system. bullet - proof glass or glass does not fire in a short period of time due to damage fixed framework, a glass panel fell off, lost the fire or bomb - functional

    企業不斷的技術創新是我們發展的硬道理,也是我司一直保持林立於特種幕墻、隔斷系統前沿的核心, 2000年,我司發明的高強度單片銫鉀防火玻璃,檢測成功推向市場以來已有7個年頭,七年來特種(防火)玻璃幕墻、室內防火玻璃隔斷、防火玻璃門窗的及十多年來的玻璃深加,幕墻及不斷的總結和試,玻璃幕墻、隔斷系統要防火、防炸彈沖擊波必須要有耐高溫高強度的框架材料固定支撐玻璃,在一旦發生火災、爆炸的時候要有足夠的時間保證整個系統的完整性,不至於防火玻璃或防炸彈玻璃在短時間內由於固定框架破壞,而玻璃脫落,失去了防火或防炸彈的功能。
  7. In the south - to - north water diversion centre line, beijing west 4th ring road tunnel the waterproof design and operation, they use the construction experience of the urban subway of beijing for reference, adopt the compounding type and line with and build waterproof craft

    南水北調中線北京段西四環暗涵程在防水中,借鑒了北京城市地鐵的,採用復合式襯砌防水藝。
  8. Combining with the project example, this paper made some studies on the foundation underpinning and structure stabilization technology, covering the theoretically discussion, and design innovation, and advanced technique ' s application and dissemination and the summary of construction experiences, etc., in order to provide reference for similar project in the future

    本文結合程實例,擬就獨立柱基礎托換及結構加固技術進行理論上的探討、方面的創新、先進技術的推廣和應用、的總結等各方面的研究,為同類程提供一些可借鑒的
  9. In this paper, combined with the research project " study on the design, construction and quality monitoring of foundations in karst and mined - out regions along tanshao highway " financed by the department of communication of hunan province, a deep analysis has been made to find out the factors influencing the safe thickness of bearing stratum under the pile tip in karst region. three simplified models are set up to calculate the safe thickness, from which empirical calculation formulas are deduced. and a few important conclusions drawn from the discussion can be used to guide engineering practice, which are also valuable materials for the revision of current criterions later

    本文結合湖南省交通廳「潭邵高速公路巖溶及采空區路、橋基礎與質量監控方法研究」研究課題,以潭邵高速公路為程依託,通過深入分析巖溶區基樁樁端持力層安全厚度的影響因素,提出了樁端持力層安全厚度算的三類簡化模型,以此為基礎,推導出了樁端持力層厚度算公式,並通過討論得到了可用於指導程實踐的幾點重要結論,可供今後規范的修改參考;本文針對巖溶地區的特殊情況,提出了巖溶區樁基方法及具體步驟,並借鑒國內外巖溶區樁基的成功,提出了巖溶區樁基處理幾種特殊方法,可供同類程借鑒;另外,本文通過具體的程實踐,系統總結了巖溶區樁基技術及常遇問題的處理方法。
  10. The jiangya water control project has a lot of successful experience in its planning, design, construction, financing, project management and operation system, which could be used as a reference for the similar project

    江埡程在規劃、、資金籌措、程管理和營運機制等方面積累了一些,也有些值得總結和改進之處,可供類似程參考。
  11. In the light of its special property being not easy to gain strength, through mechanics researches on different methods to stabilize this kind of low _ liquid _ limit silty soil as subbase material, evaluated both technically and economically, we have got a cement lime stabilization plan to meet the index requirements for non _ side _ limit strength of compression of subbase of class2 road stipulated in the specification ; by means of improving the workmanship, thickening the loose layer of soil, adding soil on covering weave fabric before compaction, such problems can be solved as very poor compaction, loose surface during compaction, roughness and unevenness, coats of layer and shear damages

    本文針對黃河沖積而成的低液限粉土其粘粒含量極低、土的不均勻系數很小、膠體活性差的程特性,通過採用不同方法穩定該類土作底基層材料的力學性能研究,從技術、濟角度綜合評價,得到滿足規范抗壓強度指標要求的水泥石灰穩定方案。通過對原材料、試配合比、等方面進行優化,從而顯著減輕了基層的早期及長期縮裂程度,從而提高了路面的耐久性。
  12. The paper, in the light of my bureau ' s construction experience and project practice in constructing large span prestressed continuous beam bridge ( continuous rigid frame ) in recent dozens of years, introduces a new thinking about the standardized design of cable - stayed hanging basket and the standardized construction technology of the continuous beam bridge ( continuous rigid frame ), gives the detailed account of a series of construction technique and achievements such as : the development and construction ways of large span continuous beam bridge, the standardized design thinking and operation of cable - stayed hanging basket, the standardized construction technology of the continuous beam bridge ( continuous rigid frame ) etc., meanwhile, it is attached with a whole set of detailed standardized design sample drawings of cable - stayed hanging basket

    本文根據我局十幾年來修建大跨度預應力連續梁(連續剛構)橋的程實例,介紹了一種斜拉式掛籃標準化的新思路及連續梁(連續剛構)橋標準化藝。詳細敘述了大跨度連續梁橋的發展、方法、斜拉式掛籃標準化思路及做法、連續梁(連續剛構)橋標準化藝等一系列技術及成果,並附有全套詳細的斜拉式掛藍標準化定型圖。對同類型橋梁的及掛籃具有參考價值。
  13. This paper show the brief introduction the nanjing metro line 1 and the environment along the line, analyze the problems in the design and the construction stage

    摘要介紹南京地鐵1號線一期程線路概況及沿線環境特點,通過實例對線路中的和後期過程中發生的問題進行分析。
  14. This paper takes sudan three - seven oilfield project for an example to illustrate the requirement for raw and processed materials, prefabrication process of foam yellow jacket and key points of field joint operation, and summarizes briefly relevant experience and lesson, finally puts forward some suggestions of design and construction for future projects

    文章以蘇丹三七區油田程為例,介紹了對原材料性能指標的要求、泡沫黃夾克預制藝、現場補口操作要點,並簡要總結了在蘇丹生產泡沫黃夾克防腐保溫層的和教訓,對今後的提出建議。
  15. A great deal of design and construction experience has been accumulated during the construction in coastal all over china

    在我國沿海地區的建築中,積累了大量的
  16. But there are few twin - bore tunnels in constructed highways, so the experience that we can make for reference is scarce

    但我國已建成的連拱隧道的數量較少,缺乏可借鑒的設計施工經驗
  17. Ganfa has over 50 years experience of designing and manufacturing and has many items of patent techninque. the synchronous generators and permanent magnet generators which are manufactured with advanced technology and excellent machining equipement, will be able to meet the requirement of different technical condition which matched with various type turbines. ganfa has manufactured the generators of 0. 1 to 20mw in capacity which have been put into operation at present and owns the capability to manufacture the following generators : the capacity per unit up to 180mw, the stator outer diameter of generator up to 9, 000mm, the speed of vertical type generator up to 750r min, and thespeed of horizontal type generator up to 1, 500r min, both the b - grade and f - grade insulation class, the terminal voltage can up to 13. 8kv. ganfa manufactured 34, 500kw water turbine generator sets for the donghewan power station, yongchang, gansu, china which is located in 2. 868. 5m height above sea level, and has successfully solved the difficult problems such as plateau corona - shielding. ganfa is equipped with the generator test station and insulation material laboratory which are advanced test facilites and testing means to make each item electrical performance of products meet designing requirements from purchasing to delivering

    公司具有50年的製造,擁有多項專利技術,生產的同步發電機永磁機技術藝先進,製造精良,能滿足與各式水輪機配套的不同技術條件要求。目前公司已製造投產的發電機容量范圍為0 . 120mw ,具備生產單擊容量50mw的能力,發電機機座號最大可達9000mm ,立式機最高轉速750r min ,臥式機最高轉速達1500r min ,絕緣等級有b級和f級,圈式線圈最高電壓達13 . 8kv ,公司製造的甘肅永昌東河水電站34500kw水輪發電機組,海拔為2868 . 5m ,成功解決了高原防暈等難題。公司擁有電機試站絕緣材料試室等先進的實和測試手段,使產品從原材料進產,到成品出產的各項電器性能測試均能滿足要求。
  18. Our fabrications expertly mimic the natural environment in every way. over 10 years experience designing and constructing artificial rockwork, the techniques allow for the creation of spectacular large outcropping of natural features which could never be replicated using natural stolen features

    各類造型雕塑,以及特效領域的開發研製,更是推廣這些產品技術的先鋒,我們精於環境藝術及相關產業,超過10年的假山造景的,使我們的技巧可以建造出大型,壯觀,引人入勝的山體景觀,這是用從自然界取石進行拼裝無法達到的。
  19. In the advanced technology countries such as japanese and europe countries, there is more experience that we can make for in twin - bore tunnel design and construction because of the long theory of twin - bore tunnel construction

    日本及歐美等公路隧道修建技術發達的國家,連拱隧道的出現的歷史較我國要長,已有相當的設計施工經驗
  20. At the meantime, the rock mass may alternate between loading and unloading and it exists in certain kind of liquid, such as surface water, unconfined water, confined water etc for its intrinsic crannies. the practical rock mass concerned project must solve the key stability pr oblem after the understanding of the complicated mechanical characteristic and the deformation trends to guide the following project design and construction for the demand of security, economy, feasibility and validity. however, the intrinsic nonlinearness and complexity of the engineering rock mass become the main difficulty to predict the stability and deformation, the corresponding structure design must ensure enough safety with all the determinate or random force combination, so a model without the geometry distortion and constitutive equation warp is necessary to be built for the quantificational analysis of practical structure ' s stress, for the simulation of the real process and for the determinate evaluation system and optimization

    由於實際程巖體其固有的非線性和復雜性,使得求解對應的諸如其穩定性、變形等問題面臨較大的困難,而有關的程結構的必須保證該結構在外來因素的作用下具有足夠的安全度、濟性和合理性,這必然要求對巖體及其程結構的受力與變形有一套量化評判體系和優化技術,抓住實際程問題的本質特徵並建立可行的符合幾何模擬、本構模擬、受力模擬、過程模擬四原則的求解模型,通過該模型的數值模擬成果來指導巖體程的及運營、管理;而巖體結構面的存在使得基於傳統連續介質力學理論的理論分析和數值模擬面臨巨大的挑戰,物理模擬的試周期和成本也大大增加,而巖土體程問題則成為典型的數據有限、了解程度有限類問題,這類問題的解決需要綜合應用理論分析、判斷、物理模擬和數值模擬等方法,數值模擬可以完成目前許多技術手段無法完成的實,如參數控制,復雜條件下的邊界條件的處理,同時數值模擬具有高可重復性,且數值模擬的成本和人力開銷等遠低於物理模擬,因此研究巖土體程問題的流形元數值模擬方法是一項具有理論和實際程應用價值的重要課題。
分享友人