設計負荷 的英文怎麼說

中文拼音 [shè]
設計負荷 英文
a umed load
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
  • 負荷 : [電學] load; charge; weight
  1. In addition, the hf in the downcomer of ctst plate is 110 ~ 150mm lower than that of fl valve plate. it was showed that making a comparison of two plates, the downcomer of ctst tray can cope with more operation loads with the same size downcomers

    這說明相同大小的降液管, ctst塔板上的降液管可處理的操作比浮閥塔板的要大;即若在相同的操作下,在降液管時, ctst塔板的降液管尺寸可比浮閥塔板的小。
  2. In the process of arithmetic design, newton " method is used to compute power flow of network. graph theory knowledge is used to determine all paths from generator to load. to improve efficiency, thesis use branch expunction method to optimize the node order

    在演算法過程中,採用牛頓拉夫遜法進行潮流算得到系統潮流分佈,利用圖論原理中的路徑搜索演算法確定了發電機對的供電路徑,此外為了提高潮流跟蹤的算效率,利用了支路消去法進行節點順序的優化。
  3. The calculation and design procedures of air conditioning load, ground loop heat exchangers, radiant floor system, distribution system between heat pump and build are mainly introduced

    重點介紹了建築空調算、地下埋管換熱器系統、輻射地板系統以及熱泵和建築物內分配系統等方面的內容。
  4. Accepted design loadings in the united states vary with the latitude.

    在美國被採用的設計負荷隨著緯度而變化。
  5. Planning of assembly line production cycle time based on the balance of load

    基於平衡的流水線生產節拍
  6. Presents the steady - state programming with constant coolant average temperature and constant live steam pressure, an ideal programming for marine nuclear power plant ( npp ), under which, both the coolant average temperature and the live steam pressure of nuclear steam supply system ( nsss ) are constant when the steady state operating condition is varied, and points out that in comparison with the steadysate programming with constant coolant average temperature, the ideal programming can improve the overall operating performance of npp effectively, especially in low - load range, for instance, raise the heat efficiency of npp, decrease the operating noise of main coolant pump, and improve the conditions of design, operation and control of the secondary loop system

    雙恆定運行方案是船用壓水堆核動力裝置的理想運行方案.在這種運行方案下,當裝置穩態功率變化時,冷卻劑平均溫度與蒸汽壓都保持不變,與通常採用的冷卻劑平均溫度恆定運行方案相比,有效地改善了核動力裝置的總體運行性能,特別是在低運行時,可以提高裝置經濟性、降低主泵運行噪聲、改善二迴路系統的、運行和控制條件,這對于提高船用核動力裝置的運行可靠性和安全性具有實際意義
  7. Another critical factor when designing tricycle gear is to properly balance the load carried by the main gear versus the nosewheel

    前三點起落架的另一個不利因素,時需要較精確的分配主輪與前輪的
  8. This article aims at the boiler ' s problems in operation : 1 ) under nominal load, the smoke temperature at the outlet of hearth reaches 1200, far more exceeds 1050 the original designed temperature. this will always result in slag inside boiler and the temperature of overheater ' s pipe superheat, so that boiler cannot take nominal load and all these influence boiler ' s nomal operation heavily, 2 ) this article also studied the reason why the assistant oil becoming necessary when coal changes. during the nomal operation, many factors ( makeup of combustor and its disposal, smirch and encrust of water wall, excessive air coefficient, temperature of primary air, coal type and density of coal dust ) can deviate the designed working conditions, then affect the boiler ' s nomal operation

    本文針對該鍋爐在實際運行中存在的問題:在額定下,爐膛出口超溫、低溫段過熱器前煙溫高達936 ,遠遠超過815的值;噴燃器四周水冷壁結焦嚴重,過熱器管壁溫度超標,無法帶上額定;甚至有時因燃煤質量的變化,必須投油助燃的嚴重情況進行了分析研究。在實際生產過程中,燃燒器的結構、布置,水冷壁的粘污、結垢,過剩空氣系數、一次風溫、煤種及其濃度變化等許多因素都會偏離鍋爐的工況,從而影響爐內的傳熱和燃燒,造成爐膛出口超溫、水冷壁結渣等問題。
  9. The date of completion of the dam, its design life and allowable vehicular traffic load

    該堤壩的建成日期、使用期限,以及可承受的汽車行駛
  10. Eurocode 1. basis of design and actions on structures. traffic loads on bridges united kingdom application document

    歐洲法規1 .的基礎和結構的作用.橋梁的交通
  11. The # 9 and # 10 142mw heat supply units in gansu xigu power plant, the steam extraction main pipe system adopt westation control system of westing house company and deb coordination control policy in design. the coordination control policy successfully expand the whole the running range, from the normal running condition to abnormity running condition and start or stop condition, which simplicity base on burthen and main steam pressure coordination control

    甘肅西固熱電廠# 9 、 # 10142mw抽汽母管制供熱機組,選用美國西屋公司westation控制系統,、應用了deb協調控制策略,從單純作為和主蒸汽壓力控制協調的基本功能,成功擴展到整個運行范圍,即從正常運行工況到異常運行工況及啟、停工況。
  12. The remote diagnosis center is based upon the implementation of remote signal analysis system. general methods of signal processing are discussed. they are accomplished by java, jsp programming language in j2ee environment, which can keep the balance of system and utilize resources sufficiently expert - diagnosis system is an important part in the remote diagnosis center

    對于遠程診斷中心,主要研究了遠程信號分析系統的與實現,討論了信號分析處理常用的一些方法,並將這些方法用java 、 jsp編程語言在j2ee環境下實現,使得系統平衡,更靈活、充分地利用資源。
  13. The problem was a familiar one : most of the sewage disposal facilities in the beach hinterlands had been built in the 1970s and designed to serve a relatively small population. with the rapid growth of the 1980s, pressure on the facilities increased to breaking point

    水質欠佳的主要原因是當時泳灘腹地的污水處理施均建於1970年代,原本只可供少數人口使用,至1980年代人口急劇上升,令污水量大增,沉重的壓力幾乎導致系統崩潰。
  14. In view of this situation this article has conducted research to the design of metallurgy auxiliary biography with the frequency conversion table electrical machinery first multianalysis to the frequency changer and the frequency conversion table electrical machinery movement characteristic is carried out, the voltage waveform harmonious which the frequency changer outputs is big, attacks in a big way, and the voltage climbing rate reaches as high as 6600v / mu s which is 20 times ordinary sine alternating voltage, the rolling mill auxiliary biography table set the extremely strict request to the electrical machinery ; its movement frequency is very low, rate frequency in 8 - 20hz ; the velocity modulation scope is wide, the lowest movement frequency lowers to 1hz, and the starting number of times is quite frequently, each hour reaches as high as 600 - 800 time, the impact shoulders in a big way, the overload capacity request is high

    針對這一情況本文對冶金輔傳用變頻輥道電機的進行了系統研究。首先對變頻器和變頻輥道電機的運行特性進行詳細分析,變頻器輸出的電壓波形諧波大,沖擊大,電壓上升率高達6600v / s ,是普通正弦交流電壓的20倍;軋機輔傳輥道對電機提出了十分嚴格的要求:其運行頻率很低,額定頻率在8 - 20hz ;調速范圍寬,最低運行頻率低到0 . 5hz ,起動次數相當頻繁,每小時高達600 - 800次,沖擊大,過載能力要求較高。
  15. Analyses the determination of surface heat transfer coefficient, interior building envelope load, air infiltration load, equipment load and heat storage load, etc

    摘要分析了民用建築舒適性空調算中表面傳熱系數、內圍護結構、滲透風、蓄熱的確定等問題。
  16. Design loads for buildings ; soil characteristics ; specific weight, angle of friction, cohesion, angle of wall friction

    建築物的設計負荷.土壤特性值.比重磨擦角粘著力
  17. Standard practice for specifying an equivalent 3 - second duration design loading for blast resistant glazing fabricated with laminated glass

    用夾層玻璃製造的防爆玻璃窗的等效3秒持續時間設計負荷規定的標準實施規范
  18. Standard practice for minimum structural design loading for underground precast concrete utility structures

    地下預制混凝土公用施的最低結構設計負荷的標準實施規程
  19. The equipment has been put into operation after installation, the actual operation shows the newly designed exhaust boiler reached the design load, s table operation. the economic efficiency increased apparently. the total investment was 5 million yuan, the comeback time of invest only 6 months

    備安裝完畢已投入運行,實際運行工況表明,新的余熱鍋爐達到設計負荷,工況穩定,經濟效益顯著增長,投資500萬元,投資回收期僅為六個月。
  20. The progress of the building energy conservation of our country is rapid now, but it started late in hot summer and warm winter zone. taking the thermal performance and energy consumption as the targets, with the methods such as calculation, analysis, data comparison in the simulation software, the dissertation incarnates that the design can be totally controled. some better thermal design methods are mentioned to decrease the loads of the air - condition, which lend themselves to achieving the local residential building energy conservation standard

    當前我國建築節能工作正在迅速發展,本文以夏熱冬暖地區居住建築熱工性能及其能耗為研究對象,通過模擬軟體進行算、分析、數據比較等方法,充分體現建築過程中的可控性,並對減少空調設計負荷提出一定的熱工方法,以有助於達到的該地區居住建築節能指標;為夏熱冬暖地區建築節能工作的開展做部分研究準備工作,同時總結dest - h軟體在測試研究應用方面的一些經驗。
分享友人