試行裝配 的英文怎麼說
中文拼音 [shìhángzhuāngpèi]
試行裝配
英文
tentative assembly- 試 : 名詞(古代占卜用的器具) astrolabe
- 行 : 行Ⅰ名詞1 (行列) line; row 2 (排行) seniority among brothers and sisters:你行幾? 我行三。where...
- 裝 : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
- 配 : Ⅰ動詞1 (兩性結合) join in marriage 2 (使動物交配) mate (animals) 3 (按適當的標準或比例加以...
- 試行 : try out; put into trial use; trial implementation
- 裝配 : assemble; fit together; fit out; assembling; fitting; rigging; erecting; fabrication
-
Also analyzed are the problems which possibly occur during the design, assembly and alignment, and the relevant resolution method is given. the co - alignment device of the c02 and ld lasers is designed, and co - alignment adjustment technique is brought forward in this dissertation. and the system of infrared primary alignment is also designed
探討了儀器的整體設計、裝配與調試等各個過程中遇到的問題與解決方法,進行了可見紅外共光路的設計,提出了共光路調整技術並設計了紅外干涉的初調系統,效果良好。Secondly, paper introduces the composition structure and the manufacture craft characteristic of airplanes, describes the structure and the main assembly process and the assembly characteristic of the n # fuel tank section, points out the assembly accuracy control of the n # fuel tank section. thirdly, paper analyses in detail problems which exist in the current riveted assembly of the n # fuel tank section, proposes the improve measures against the existent problems. finally, paper forecasts in theory the positive effect that the new plan will bring, introduces the practical result after approval test, analyses the differences of both
具體做了以下幾方面工作:第一,詳細闡述了工作研究的基本原理;第二,介紹了飛機的組成結構、飛機製造工藝的特點、 n #油箱段的主要結構、 n #油箱段的主要裝配過程、 n #油箱段的裝配作業特點和n #油箱段的裝配準確度的控制方法;第三,具體分析了n #油箱段鉚接裝配生產線現行作業中存在的問題,針對存在的問題,提出了具體的改進建議,並形成了新的改進方案;第四,從理論上預測了新方案將會帶來的積極效果,介紹了新方案在現場試驗驗證的實際結果,並對兩者之間存在的差異進行了對比分析與研究。These appointed examiners, categorised into boiler inspectors and air receiver inspectors, carry out inspections and testings of any pressure equipment subject to registration and are responsible for scrutinising documents on design, construction, quality of fabrication and issuing certificates of fitness
這些委任檢驗師分為鍋爐檢驗師和空氣容器檢驗師兩種。他們為須登記的壓力器具進行檢驗及測試,並負責審查有關設計、構造及裝配質素的文件,以及簽發效能良好證明書。Before studying the concrete composite deck pavement, we introduce the basic theory of touching analysis, and come up with the realization of touching analysis in the fem analysis considering the touch of concrete bridge cover plates, asphaltum concrete overlay with bridge cover etc. connect with the experiment on the spot of bridge, the software ansys is used to solidity modeling and analyzing an assembly simply supported bridge before adding overlap, after adding overlap etc., and study the influence of adding overlap on the underside bridge structures
在進行裝配式混凝土簡支板橋復合鋪裝結構的探討性研究前,先介紹了接觸分析基本理論,並提出了考慮混凝土橋面板板間接觸、瀝青混凝土加鋪層與橋面接觸等接觸分析在有限元分析中的實現思路。結合一座裝配式簡支板橋現場試驗數據,採用ansys對該橋在加鋪前後進行了實體建模與計算分析,討論了瀝青混凝土加鋪層對下部結構物的影響。The paper describes the modeling techniques and main points of the whole vehicle in the virtual proving ground by modeling the finite element models of the body in white, suspension system, tire and nonstructural masses of a business car, and simply verifying the whole vehicle model
摘要通過對某型商務車白車身、懸架系統、輪胎、非結構質量進行有限元模型的建立、聯接裝配,直至完成整車的有限元模型的過程,並對該模型進行簡單的驗證,來說明在汽車虛擬試驗場中整車的建模技術與要點。For complex boards or boards that aren ' t tested with an in - circuit tester, most companies perform a functional test before final assembly
對于復雜的電路板或者沒有經過在線測試的電路板而言,很多公司在最後裝配之前進行功能測試。3 ) a 3 - d geometry and finite element model of the assembly of the obturator of the breech mechanism is established. quasi - static and dynamic finite element analysis of stiffness, strength and obturating performance of the obturator of the breech mechanism is carried out, based on elastoplastic theory and multi - body contact algorithm, and the simulation results coincide with experimental results, further, th e effect of friction factor on its obturating performance is investigated
建立了炮閂閉氣結構的三維裝配體幾何實體模型和有限元模型,對炮閂閉氣結構剛強度和閉氣性能進行了準靜態及動態多體接觸彈塑性有限元分析,分析結果與試驗結果相吻合,進一步研究了摩擦系數對其閉氣性能的影響。The main contents are as follows. by the experiments of two joints under low - reversed cyclic loading, the paper analyzes the failure pattern, energy dissipation, ductility and cracking in the joint cores, evaluates the seismic performances and anti - crack behaviors of the joints, and deduces the anti - crack formula of the subassemblage and prestressed frame joint. through the fini te element analysis software ansys, the paper analyzes the specimens nonlinearly, and the theoretical analysis results are well consistent with those of the experiment
主要內容包括:通過兩榀節點在低周反復荷載作用下的試驗,分析其破壞形態、耗能能力、延性性能和節點核芯區裂縫開展情況,評估節點的抗震性能和抗裂能力,推導出預壓裝配式框架節點的抗裂驗算公式;並運用ansys對試驗中的節點進行了非線性分析,計算結果與試驗結果基本吻合。Currently, the 70mm hspc is under development. it is expected that the assembly and system testing can be finished by the end of this year and delivered to the user
目前, 70mm間歇式高速攝影機項目的研製工作正在順利進行,預計今年能夠完成系統裝配和調試並交付用戶使用。According to the parameter we carries on the structure, the hydraulic system design and the blueprint, making this machine realize rotary drilling movements, break the frozen coal and unload the frozen coal to the outside of rail car ; carries on the processing, the assembly and the debugging of this machine
根據得出的參數進行結構和液壓系統的設計,繪制圖紙,使該機實現旋挖進給運動,破碎凍煤和凍煤卸車;進行零部件進行加工、裝配,經過樣機調試,達到了設計的目的。Second, the test report produced by the system is not the standard case report. the purpose of this article is to develop a way to increase the clinical samples per test and design the mis for autodelfia 1235. [ methods ] ( l ) the remain volume in the reagent bottle corresponding of the assay buffer, incubation buffer, eu and ab was obtained by surveying the limited probe position of the right and left dispenser, respectively
[方法]測定左右兩個試劑分配器的探測極限位置,獲得各類試劑的最低剩餘量;定量分析和測試配套藥盒各類試劑的實驗用量,獲得雙微孔板測試各類試劑的實驗配置量;定量檢測各類試劑瓶的容積,評估雙微孔板測試採用單微孔板封裝藥盒的可行性。Based on comprehensive literature research, this dissertation carried out the experimental study and three - dimension finite element analysis of the behavior of subassemblage and prestressed frame joints under loads
本文在廣泛閱讀國內外文獻的基礎上,進行了預壓裝配式框架節點受力性能試驗研究及三維有限元分析。Before apply the test, all the welding work of block or section should be finish and accepted by view inspection
當片體、分段組立裝配焊接完工後,經焊縫外觀檢查合格后,就可進行角焊縫密性試驗。This paper mainly makes the research of construction method for cast - in - situ concrete box girder of continuous girder bridge, using assembled highway bridge steel truss ( often known as bailey truss ) as the falsework, technical schemes for the falsework erected over river, particularly the rigid slant supports of the falsework on piers, and analysis, calculation methods and deformation of the falsework in accordance with the related tests in field
摘要主要研究了採用裝配式公路鋼橋桁架(通常稱為貝雷架)做為支架進行連續梁橋現澆箱梁混凝土的施工方法;研究了跨河施工支架的技術方案,特別是施工支架在橋墩上的剛性斜撐,同時結合現場試驗研究了施工支架的分析計算方法及變形。Tests are carried out on mechanical performance, tired performance, rubing performance and gasket to bear the weight of performance to analyze the existing problems in the assemble technology of bolt production. the improvement measures of this model the cylinder head and the corresponding torsion and checks the standard are put forward in the thesis according to actual product conditions
對缸蓋螺栓機械性能、疲勞性能、摩擦性能及缸墊承載性能進行了測試,分析了現生產螺栓裝配工藝存在的問題,根據實驗情況及生產條件,提出了該機型缸蓋螺栓裝配工藝改進措施及相應的扭矩檢查規范。In this paper, we analyze the variations of sheet metal assembly according to the method of orthogonal design
同時,利用正交試驗設計法對薄板的裝配偏差進行正交分析。Yoke ? fully fabricated yoke is seismically qualified while offering easy maintenance and actuator mounting
軛架?完全裝配式軛架通過抗震測試,易於維護和安裝執行機構。To serve the optimum hydraulic design for a large pumping station, a new method to separate inlet and outlet conduit from tubular pump system was put forward for measuring their hydraulic baa, by the way to design a special measuring system
摘要為了配合某大型泵站貫流泵裝置的優化水力設計研究工作,本文提出了設計專用模型試驗裝置,將貫流泵裝置進水流道和出水流道從水泵裝置模型中分離出來分別進行模型試驗及水力損失測試的方法。4. this thesis introduces the application of rd - 1005 mrfd in hunan yueyang dongting lake bridge and permanent magnetism adjustable assemblage mrfd in changsha hongshan bridge and changsha liuyang river bridge. the studies on cable vibration mitigation field tests in these bridges are presented
4 .介紹了湖南嶽陽洞庭湖大橋上安裝磁流變阻尼器的情況,在長沙洪山大橋、長沙瀏陽河大橋全橋拉索上安裝了永磁調節裝配式磁流變阻尼器,並進行了現場拉索減振試驗研究。During the design of new type attack helicopter, we need to assembly the engine, the gear box, the driving shaft and the rotor system together on the ground, so that we can use it to test its performance and try whether they work in harmony
在某新型武裝直升機的研製過程中,需要把發動機、減速器、傳動軸和旋翼系統在地面進行裝配,做地面試驗,以檢驗各子系統的性能和相互間的協調性。分享友人