試驗井 的英文怎麼說

中文拼音 [shìyànjǐng]
試驗井 英文
exploratory well
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  • 試驗 : trial; experiment; test
  1. Geotechnical investigation and testing - graphical presentation of logs of boreholes, trial pits, shafts and adits

    土工調查和檢.礦坑豎和入口測記錄
  2. Brief analysis on test of reversing air current with mine air draft

    利用風道反風淺析
  3. It can be said that the solution to the space problem of limit load and the calculation of foundation bearing capacity for deformed groundwork have some academic and scientific value. the dynamic pile testing of foundation and batholith as well as deep well load testing system has been put into use in real work environment and gained some social and economic benefit

    本文關于界限荷載的空間問題解答,考慮地基變形的地基承載力工程演算法具有一定的學術價值;本文中的地基(及巖基)承載力動測法及深載荷系統已在工程實踐中應用,並取得了較好的社會和經濟效益,具有一定的工程實用意義。
  4. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承載力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土工程界應用樁基設計規范中的難點? ?樁端巖基承載力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷四方面進行了深入討論;本文作者根據多年現場載荷的工程實踐,對深裝置的核心部分? ?反力裝置,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。
  5. Test technique for short - breakdown test in cbm well and its application

    煤層氣微破裂技術及應用
  6. On the basis of having refered larg number of abroad test - well data and having investigated same local test - well, this dissertation have designed the drill and petroleum extraction tools test - well whole scheme to fit the well drill and petroleum extraction busywork characteristic and the demand of technique store for the dagang oil - field

    本文是在進行了大量的國外試驗井資料查閱及國內試驗井調研的基礎上,根據大港油田鉆采作業的特點和技術儲備的要求進行了鉆采工具試驗井總體方案的設計。
  7. The drill and petroleum extraction tools test - well is made up of the multifunction test - machine system ( hydraulic system ), the calefaction system the circulation system, the testing system and the assistant system

    鉆采工具試驗井共由多功能機系統(液壓系統) 、加熱系統、循環系統、測系統和輔助系統組成。
  8. Experimental study on the air floatation treating mine wastewater

    氣浮法處理煤礦下排水研究
  9. Standard practice for field procedure for constant drawdown tests in flowing wells for determining hydraulic properties of aquifer systems

    用於測定含水層系統水硬性的流動中恆定水位下降現場程序的標準實施規程
  10. Perhaps there will be a short trip to test the possibility of a blowout - in case the will is acting up

    的情況不好時,也許要進行為時較短的起下鉆作業來試驗井噴的可能性。
  11. According to the requirement of the tools test parameter and craft test parameter, have done the design and analysis for the subsystem parts

    根據工具、工藝參數要求,完成了該試驗井各組成系統零部件的設計分析。
  12. According to the requirement of the drill and petroleum extraction tools test and craft test, have made the design and performance analysis for every subsystem of the drill and petroleum extraction tools test - well

    根據鉆采工具、部分鉆采工藝的需要,完成了鉆采工具試驗井各組成系統設計及性能分析。
  13. Standard test methods for density of soil and rock in place by the sand replacement method in a test pit

    試驗井中砂子替代法在現場對土壤和巖石的密度的標準方法
  14. A study on well completion technology of a geothermal test well in dinfuzhuang, beijing

    定福莊地熱試驗井工藝研究
  15. The principle is advance capability and credibility function and safety operation in the design of the drill and petroleum extraction tools

    鉆采工具試驗井的設計中體現了「性能先進、運行可靠、操作安全和維護便捷」的原則。
  16. The intention to build the drill and petroleum extraction tools test - well is to meet the dagang oil - field ' s requirement for developing the drill and petroleum extraction tools

    大港油田鉆采工具試驗井項目的建設正是為滿足大港油田鉆采工具研製的需求而開展的。
  17. The drill and petroleum extraction tools test - well is built in room, that not only can ensure that test environment meeting the test request but also is very convenience for equipment maintenance

    整個鉆采工具試驗井建在專用實室內,既可保證環境符合測要求,又可極大的方便設備維護。
  18. Using for reference the experience of tools test - well and crafts test - well domestic and international, to fit the dagang oil - field ' s requirement for developing the drill and petroleum extraction tools, the author have made the basic work parameter of the drill and petroleum extraction tools test - well in this dissertation

    本文借鑒國內外工具試驗井和工藝試驗井的經,結合大港油田鉆采工具研製的要求,確定出鉆采工具試驗井的基本工作參數。
  19. The results obtained show that the success rate from both controlling lost circulation and initial operation is 100 percents

    在塔里木油田進行了4口的現場漏控製成功率為100 % ,堵漏一次成功率為100 % 。
  20. During the research on the method of development and fracture in low permeability reservoir, the results from the dsa and palaeomagnetic tests were ana lyzed and compared with the results of other methods. then the synthetical results were used for the well - web design in the low - permeability experimental area. the good developing results and economic benefit are produced when the well - web design was operated

    結合「低滲油藏開發壓裂方法」研究,將該方法測的結果與其它方法的測結果進行分析、對比,並將綜合結果應用於低滲開發壓裂試驗井區的網布方案的設計中,該網布方案實施后產生了較好的開發效果和經濟效益,間接的說明了該方法的可靠性和實用性。
分享友人