  1. Ch400 transformer coulometer can be widely applied in test on production line of small manufacturer of transformer or rectifier power or in labs

    Ch400電量測量儀系列可廣泛用於各種小型或整流電源等廠家的生產流水線測,實等場合。
  2. Guide for field testing of relaying current transformers

    中繼電流現場指南
  3. The calculation method using in factory has larger error and is n ' t used in high ignition point oil transformer. in this paper a calculation method, which has been verified by experiment results, is presented based on the fundamental theories and rule equation of heat transfer to calculate the temperature rise of average oil, top oil, coil, core and hot - point. a program has been compiled

    本課題立足於工程實際應用,根據傳熱學基本原理和經典換熱準則式,通過對發熱冷卻原理進行分析和研究,提出了一套計算平均油溫升、頂油溫升、繞組溫升、鐵芯溫升和最熱點溫升的計算方法並編制了計算軟體,對影響溫升的因素進行了分析。
  4. From the results of 10 ( superscript # ) transformer oil and deionized water, the error is limited to 5 %, which indicates the definite feasibility of the experiment

    通過對110 (上標# )油和去離子水等流體樣的測量,實誤差控制在5 %之內,表明本實具有一定的可行性。
  5. The main discharge types in insulation of electrical transformers were analysed, 7 kinds of experimental models simulating discharges in electrical transformers and 3 kinds of models simulating interfering discharges in air were designed and model experiments under some circumstances were performed

    分析了絕緣的主要放電形式,設計了模擬放電的7種模型和3種模擬空氣中放電干擾的模型,進行了不同情況下模型的放電
  6. Guide for diagnostic field testing of electric power apparatus - part 1 : oil filled power transformers, regulators, and reactors

    電力設備的診斷現場指南.第1部分:充油電力調節和電抗
  7. Guide for diagnostic field testing of electrical power apparatus - part 1 : oil filled power transformers, regulators, and reactors

    電力裝置鑒別現場指南.第1部分:油浸式電力,調節和電抗
  8. Fluids for electrotechnical applications. halogenous isolating liquids for transformers, other than pcb. general. test methods. specifications

    電工技術用流體.除pcb外,liht用的鹵化絕緣液.總則.方法.規范
  9. Aeronautical ground lighting electrical installation. isolating transformer. equipment specifications and tests

    航空地面照明電子設備.絕緣的設備規范和
  10. Aeronautical ground lighting electrical installation - isolating transformer - equipment specifications and tests

    航空用地面照明電氣設施.隔離.設備規范和
  11. As the main automation contractor, emerson will leverage its significant engineering expertise to design, install and commission the digital automation system and also perform various specialized services on the units ' electrical subsystems, such as the generator, transformers, feeder ducts and switchgear

    作為主自動化承包商,艾默生將派出其最具經的工程專家來設計,安裝和調數字自動化系統,以及為機組的電氣子系統,例如發電機,,饋電管道和開關設備等,提供多種專業服務。
  12. Three phase oil - immersed distribution transformers, 50 hz, from 50 to 2500 kva with highest voltage for equipment not exceeding 36 kv - requirements and tests concerning pressurized corrugated tanks

    最高電不超過36kv的設備用50hz 50 2500kva三相油浸式配電.關于加波紋罐的要求和方法
  13. Transformers ; oil trap dn 25 ; requirements and test

    .集油槽dn25 .要求和
  14. Cascade testing transformator

    用級間
  15. Scii is equipped with an up - to date comprehensive test lab, which can be used to check various parameters for our parts of relays, contractors, transformers and photo - controls

    Scii擁有現代化的綜合實室,可以完成對繼電、接觸、光控等產品的各項技術參數測,確保為客戶提供優質產品。
  16. Impedance - matching balanced traction transformers ( balanced transformers in this paper for short ) are step - down transformers, they transfer symmetrical three phase voltage in primary side to perpendicular two phase voltage in secondary side. they are different from any other transformers, so their short - circuit current analysis and short - circuit test method must be taken into special account

    阻抗匹配平衡牽引(本文中簡稱平衡)是一種將一次側三相對稱電換為二次側二相垂直電的降,它不同於已有的任何一種,短路電流的分析計算和短路必須予以重新研究。
  17. Knowledge of transformer and inductor principles and applications. well know related standards and qualification tests

    熟悉高頻、電感工作原理及應用;了解相關國際標準及資格證測
  18. After the installation of the transformer, the sealing points will be guaranteed without leakage and the correct readings of every instruments until the handover is up to the grade

    6安裝完畢后,保證各密封點焊縫無滲漏,各表計準確無誤,各項交接合格。
  19. General technical specification of high voltage test devices part 3 : non partial discharge testing transformer

    裝置通用技術條件.第3部分:無局放試驗變壓器
  20. General technical specification of high voltage test devices part 4 : triple - frequency test transformer

    裝置通用技術條件.第4部分:三倍頻試驗變壓器裝置