試驗頭部 的英文怎麼說

中文拼音 [shìyàntóu]
試驗頭部 英文
test head
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : Ⅰ名詞1 (部分; 部位) part; section; division; region 2 (部門; 機關或組織單位的名稱) unit; mini...
  • 試驗 : trial; experiment; test
  1. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動及相關課題的研究工作,本文以截錐模型模擬地基,對地基(巖基)承載力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土工程界應用樁基設計規范中的難點? ?樁端巖基承載力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷四方面進行了深入討論;本文作者根據多年現場載荷的工程實踐,對深井荷裝置的核心分? ?反力裝置,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。
  2. In the course of working, , the plow will make use of the shuttling method so that it can dig alternately either on the left or on the right. compared to the unilateral plow, it can improve the productivity because it can help leave off the soil 、 take from the consumed energy and reduce the empty journey. to meet the requests above, we will use a remote cylinder with both a small cubage and double functions, approximately designing the plow to be columniform and symmetric. after the experiment for a period in the field, we found that the most frayed areas had happened at the places of both plow shank and share and at the same time the base of the remote cylinder had ruptured suddenly

    與單向犁相比,其優點在於:耕地無開、閉壟,地表平整,降低了耕后整地的能量消耗,減少了地的空行程,因而大大提高班次生產率。為了滿足犁體梭式作業的要求,我們採用了一隻小容積雙作用的液壓油缸;同時對犁壁曲面的形狀採用了近似圓柱形的對稱設計。但經過一段時間的田間,我們發現:該犁犁胸分的犁脛和犁鏵上的犁尖在工作中磨損較為嚴重;主犁梁和油缸缸體的連接分(即油缸底座)突然發生了斷裂,造成整個犁體無法正常工作。
  3. Then, the method of measuring hrtf by mit and cipic laboratory is briefly reviewed. after that, by using sound wave scatter theory and rigid sphere model of head, a simple method for calculation hrtf is proposed. and validating that method through psychoacoustics experiment, and matching database for realizing individual hrtf

    然後簡述了麻省理工學院和cipic實室測量hrtf的方法,通過聲波的散射理論以及利用人模型提出一種簡化的理論計算對尺寸對聲音定位的影響進行了理論分析,並且利用心理學測證利用匹配數據庫實現hrtf的個性化。
  4. Methods of test for petroleum and its products - industrial quenching oils - determination of cooling characteristics - nickel - alloy probe test method

    石油和石油產品方法.第414分;工業淬火油.冷卻特性測定.鎳合金探
  5. Based on extensive investigation of construction technique history of chinese ancient buildings, the structure method, structure developing history and seismic behavior of chinese ancient timber structure buildings are analyzed in several respects of the structural system and form. through a series of experiments on constituent parts of chinese ancient timber building structure, including the tests on the corbels and brackets called dougong subjected to low cyclic reversed loadings, the tests on the wooden frame using the tenon - mortise joints as connections of column and beam subjected to low cyclic reversed loadings, the tests on vibration isolation effect of friction and slippage between column footing and their socle base, and a series of shaking table tests on a chinese ancient timber structure palace building mode under artificial earthquake at serving conditions, destroyed conditions and reinforced conditions, many valuable results of structures such as moment - curvature hysteretic loops of dougong structure and tenon - mortise joints under low cyckc reversed loadings, the static function, the seismic performance, energy dissipation, vibration reduction, energy - loss mechanism, nechanicalmode and failure mode were studied. aplenty of valuable parameters of the structure system were obtained, such as the natural period of structure, vibration modes, damping ratio, factor of vibration isolation, oscillate amplitude of ineitial accebration, velocity and displacement, magnitude of slippage, and the mechanism of structure failure and collapse etc. based on these research, the complete analysis of ancient timber structure under earthquake were carried out in which including mechanism analysis method, calculating mode, strength analysis of members and joints, strengthening methods for serving damaged ancient timber structure buildings were also taken into account

    依照宋代《營造法式》建造了抬梁式殿堂木結構構件及結構模型,對中國古代木結構中的典型構造如:柱腳在礎石頂面平擱簡支、柱架榫卯連接、柱高不越間之廣、側腳、生起、斗拱等的構造機理及結構功能進行了量化分析和實研究: (一)通過木柱石礎靜摩擦,測定了柱腳與石礎古鏡面間的摩擦系數及摩擦力隨上結構荷載變化的規律; (二)通過單柱承載力,測定了古建築中木柱的受力變形特徵、破壞模式、及模型材料的變形模量、極限承載力、極限變形等參量; (三)通過柱架低周反復荷載,測定了柱架的抗側移剛度、柱架恢復力特性及滯回曲線、榫卯張角剛度及其變化規律、柱架及榫卯的極限承載力和極限變形、及榫卯減振參數; (四)通過斗?低周反復荷載和受壓,測定了古建築木構件與木構件間摩擦系數,斗?抗側移剛度,斗?恢復力特性及滯回曲線,斗?抗壓極限承載力及受力變形規律; (五)通過抬梁式殿堂間架模型振動臺,測定了殿堂木構架結構自振周期,地震反應振形、阻尼特性及阻尼比;按結構分層特點對柱腳、柱和斗?層上的屋蓋的地震反應採用多點同步測量,對柱根滑移、榫卯變形、斗?的變形、復位、耗能減振參數等進行了定量分析。
  6. 2. based on the results of experimental data of the tailrace surge tank of yi xing pumped - storage station in jiangsu province, this research investigates the methods for the head loss coefficients of throttled surge tank with linking pipe by means of the method which incorporates experimental results with theoretical analysis

    結合江蘇宜興抽水蓄能電站尾水調壓室水力模型成果,採用理論計算與模型結果相結合的方法,對有連接管的阻抗式調壓室局損失系數的計算方法進行了討論。
  7. In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively

    本文通過研究與理論分析對旋流式豎井泄洪洞應用於高水、大泄流量情況時存在的一些水力學問題進行了研究和探討,取得以下主要成果:一、結合小灣工程導流洞改建,對高水( 252m ) 、大泄流量( 1400m ~ 3 s )條件下旋流式豎井中的水流運動特徵進行了比較全面的測量,包括空腔形態、徑向流速分佈及井壁壓強等;二、提出了豎井空腔段螺旋水流水力計算方法,其計算結果與實測值吻合良好;三、利用與計算結果,對旋流式豎井的消能機理進行了探討,對豎井各分的消能能力有了總體認識;四、對豎井下消力井的合理井深進行了優化研究,發現消力井合理深度為0 . 9d左右;五、通過研究,歸納出豎井水流總摻氣量估算方法,為導流洞排氣方案的設計提供了參考依據;六、在高水、大流量條件下,豎井空腔段下流速很高,盡管水流螺旋運動引起的離心力可以確保井壁壓強保持正壓,但空化數依然較低,因此豎井的空化空蝕始終是工程界關注的重大問題。
  8. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水流流態是否滿足要求,需要經過模型進行論證,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經確定,為碧流河水庫增建旁通管設計提供依據。
  9. Destructive tests on welds in metallic materials. hardness testing. part 1 : hardness test on arc welded joints

    金屬材料焊接的破壞性.硬度.第1分:電弧焊接的硬度
  10. ( 4 ) through the hydraulic property experiment of micro - hole lateral pipes of simple sdi in air, it was found that the average pressure of 60 mitre length lateral pipes was at the position of per 40o / o ~ ~ ~ 50 % of the effectual pipe length from the fist micro - hole, major pressure - loss was occurred at the ahead part of half pipe. the pressure uniformity reduced with orifice aperture ? increasing, and the relationship between pressure uniformity and initial water pressure was poor. running under the initial water pressure of 1. 5 meter, the discharge uniformity reduced with orifice aperture ? increasing, and when the orifice aperture smaller than or equal 1. 0mm, irrigation uniformity could achieve above 0. 6

    ( 3 )通過對空氣介質中簡易地下滴灌的微孔毛管研究發現: 60m管長的毛管平均壓力水的位置基本上在距第一孔口的有效管長40 - 45的地方;大分水損失發生在毛管的前半分;壓力均勻度隨孔徑的增大而減小,但與初始工作水關系不密切;在1 . 5m以下的工作壓力下運行,沿程出流均勻度隨孔徑的增大而降低,當孔徑不大於1 . 0mm時,灌水均勻度可以達到60以上;當孔徑大於等於1 . 2mm時,灌水均勻度低於50 。
  11. Test conditions for machining centers - part 3 : geometric tests for machines with integral indexable or continuous universal heads vertical z - axis

    多工序自動數字控制機床加工中心的條件.第3分:帶總組合工位轉臺或連續通用的機床的幾何
  12. To determine the bank - head ' s ice force of the lead - navigating bank at key position that faces the ice directly of certain water conservancy, ice model test in reduced scale is designed and carried out based on the local situation on the spot and data observed

    摘要以現場實際工況及觀測數據為依據,以確定某水利樞紐關鍵迎冰位引航導堤堤冰荷載問題為目的,設計並進行了縮尺的冰模擬
  13. Paints and varnishes - stone chip resistance test for coatings - part 2 : single impact test with conducted indentor

    塗料和清漆.塗層耐石片劃性.第2分:壓單沖擊
  14. Tap - changers - part 1 : performance requirements and test methods

    切換開關.第1分:性能要求和方法
  15. Z test conditions for machining centers - part 1 : geometric tests for machines with horizontal spindle and with accessory heads horizontal z - axis

    多工序自動數字控制機床加工中心機床的條件.第1分:有水平軸和附屬的機床的幾何
  16. Valves for water supply - fitness for purpose requirements and appropriate verification tests - part 6 : hydrants

    供水用閥門.適用性要求和專用檢查.第6分:消防龍
  17. In this paper combustion performances of the single - head annular combustor with different swirler cups are investigated by experiment and numerical simulation. under different fuel - air ratios, profiles of exit temperature 、 combustion efficiency 、 lean blowout limit and pollutant emission are measured

    在相同的雙級旋流器情況下,分析不同油氣比對單環形燃燒室的出口溫度分佈、燃燒效率、貧油熄火油氣比以及污染物( co _ 2 、 co和nox )排放等燃燒性能的影響規律。
  18. Connectors for electronic equipment - tests and measurements - part 25 - 3 : test 25c ; rise time degradation

    電子設備用接.和測量.第25 - 3分:25c .上升時間遞降
  19. Methods of test for pallet joints - part 2 : determination of withdrawal and head pull - through resistance of pallet nails and staples

    托盤接方法.第2分:托盤釘子和u形釘抗拔出和釘拉穿的測定
  20. Plastics piping systems. elastomeric sealing ring type joints and mechanical joints for thermoplastics pressure piping. test method for leaktightness under external hydrostatic pressure

    塑料管道系統.熱塑塑料壓力管道用的彈性密封環型接和機械接.外液壓條件下防漏密封方法
分享友人