調停製度 的英文怎麼說

中文拼音 [diàotíngzhì]
調停製度 英文
reconciliation system
  • 調 : Ⅰ動詞1 (配合得均勻合適) harmonize; suit well; fit in perfectly 2 (使配合得均勻合適) mix; adju...
  • : Ⅰ動詞1 (停止) stop; halt; cease; pause 2 (停留) stay; remain; stop off [over]: 船在錨地停了一...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 調停 : mediate; intervene; accommodate; interposition; act as an intermediary
  1. Rolling - cutting biscuit shaping machine is new equipment of making soda biscuit, good toughness of thin biscuit and super - thin biscuit. it ' s high production efficiency, low noises, safe operation, convenient, beautiful outer shape. this machine can press and roll rough flour 3 times and equiped with remaining flour recycling machine, also equiped with double - rolling cutting shaped equipement, in the mean time, it can produce two biscuit embryo of differnt shape. 3 times pressing - rolling machine can adjust different thickness and biscuit rough surface. it can roll rough flour and do not stick to rough flour embryo, correctness rate of adopting mould to cut margin of flour embryo reaches 100 percent so that avoid deforming of embryo due to deviation. this machine is one equipment which adopting advanced and won first technical rewarding for its independently control operation, beautiful outer appearance

    滾切式餅干成型機是連續作梳打餅、韌性和薄餅超薄餅的新型設備,具有生產效率高、噪音低,操作安全、方便,外型美觀等優點,本機具有三道軋輥制皮和余料回收機,配備雙滾切成型裝置,同時能生產兩種不同形狀的餅干胚不機,三道軋輥能同時調節不同厚和餅皮具有軋輥不粘皮、採用印模切邊一次同步進行準確率100 % ,避免偏差而造成餅胚變形,該機具有獨立控制操作,外形美觀,是目前國內較先進而獲得技術一等獎的設備。
  2. The paper analyzes the non - lineal relations of the quantity of heat exchange and water flux of coil exchanger in part - load operating condition, the shortage of deciding the water flux in bypass pipe, the disadvantage that the operating condition of pumps and chiller ca n ' t be met with the load change of the air conditioning system in different operating condition of using pressure - difference bypassing control in primary water pump system. using load control method in the change of the operating condition of primary water pump system can realize that the load change is small and reasonable in the on / off condition of pumps and m m chiller by comparing load control method in primary variable - flow water pump system with pressure - difference bypassing control method, back water temperature control method

    本論文從目前空調工程中使用的變流量水系統入手,研究了盤管換熱器在部分負荷下水流量與換熱量的非線性關系,分析了文獻中介紹的旁通管通流能力選擇的不足之處和一次泵水系統採用壓差旁通控制時,工況轉換不能滿足系統控制要求的缺陷;比較了一次泵變流量水系統中壓差旁通控法、回水溫法、負荷控法的精確性,並得出了在一次泵水系統的工況轉換時,採用負荷控法能使冷水機組及其相應水泵在啟時的負荷變化范圍較小,更符合建築物的冷量需求,節能效果較好的結論。
  3. The problem of energy saving of water systems in the operating condition of part load is studied. the aim is to get a more reasonable control method. using this method, the supplied flux of chilled water can meet the needed flux of the building during the operating times of part load, the on / off condition of pumps and chiller can be decided reasonably and it has the advantage of saving energy in pumps and chiller

    本論文主要研究空調水系統在部分負荷下輸送的節能問題,其目的在於尋求一種較合理的控制方法,使冷水機組和水泵在空調部分負荷下運行時,輸送的冷量與實際建築物所需冷量相匹配,以決定水泵和冷水機組的啟,最大限地節約水泵輸送能耗及冷水機組的冷能耗。
  4. This experiment include many contents, in a word, that is summer condition experiment, winter condition experiment > summer - winter transition condition experiment and winter - summer transition condition experiment, furthermore summer condition experiment still include flux changing experiment and winter condition experiment still include thermal balance experiment this article dealt with the data of the test, calculating out energy absorbing ( energy discharging ) of buried pipe in winter condition ( summer condition ), input power of heat pump x heat exchanging of piece buried pipe length x co - efficiency performance ? op ( energy efficiency rate ? er ) and average heat exchanging coefficient ; in additiont this article compares the inlet water temperature and outlet water temperature of underground the first layer and the second layer buried pipe when heat pump was running, the results are that the heat exchanging ability of the second layer buried pipe outgos the first layer buried pipe, and heat exchanging is more stable ; and still analyse earth temperature resuming in the transition season. the results are earth temperature resume fast in the first week when the heat pump runs off

    本文測試內容相當多,概括地說就是四個工況的測試,即夏季冷工況的測試、冬季供熱工況的測試、夏?冬過渡季測試和冬?夏過渡季測試;另外在夏季工況的測試中還進行了變流量測試,在冬季工況的測試中還進行了熱平衡測試。本文對測試數據進行了處理,計算出了冬(夏)季工況埋管吸(放)熱量、熱泵空調器供熱量(冷量) 、熱泵空調器輸入功率、埋管單位管長換熱量、供熱性能系數(冷能效比)和平均傳熱系數等;另外,還比較了熱泵運行時地下一二層埋管進出水溫變化情形,得出地下二層埋管換熱能力優于地下一層埋管,且換熱很穩定;並分析了過渡季地下一二層埋管溫恢復情形,得出熱泵系統機一周內地溫恢復特別快。
分享友人