調制設施 的英文怎麼說

中文拼音 [diàozhìshèshī]
調制設施 英文
curing facilities
  • 調 : Ⅰ動詞1 (配合得均勻合適) harmonize; suit well; fit in perfectly 2 (使配合得均勻合適) mix; adju...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
  • 設施 : installation; facilities
  1. Paragraph of time, the physical - training teacher educating a branch to organize implement new class bid to middle and primary school reforming condition making an investigation, indicate on inquiry in the front, scale is small since a little school running a school, a little rural area elementary school, does not move space especially, be not enough to pay attention to waiting a minute or to physical training, do not have very good according to that new class switches over to demand to open enough physical education, since entering the higher school the system restraint, a little school defies student sports activities and good health, physical education birthplace having some of higher class with the method of work " resorting to fraudulence ", go ahead culture class within outside row physical education, at present major middle and primary school stadium field layout, equipment and material facilities are obsolete, short - supplied, foundation has no way to ensure that regular sports of school is flexible carrying out, is difficult to say material request adapting to new class more

    前段時間,教育部門組織體育教師對中小學實新課標改革情況進行調查,調查表明,一些學校由於辦學規模小,特別是一些農村小學,沒有運動場地,或者對體育鍛煉不夠重視等等,沒有很好地按照新課改要求開足體育課,由於升學度的約,一些學校無視學生體育活動和身體健康,有些高年級的體育課貫用「偷梁換柱」的做法,外排體育課,內上文化課,目前多數中小學體育場地布局、器材陳舊、緊缺,根本無法保證學校正常的體育活動的開展,更難以說適應新課材的要求。
  2. Measuring method for the level of intermodulation products generated in a gyromagnetic device

    回轉磁中互相調乘積發生水平的測量方法
  3. And painstaking investigation for the industrial port of wisco production equipments, loading and unloading technological process and transportation assignment process and collecting a great deal of datum. they have found out the climacteric element which had made quantitative analysis and research about those climacteric elements. they have had come to the conclusion that the climacteric element of influencing the finished product wharf of the industrial port of wisco production ability, loading and unloading assignment efficiency, loading and unloading quality was the contradiction between goods " distribution of cargoes and the not match of shipping style, the transport organization process of steel was incardinate

    本文針對以上問題,在深入武鋼工業港生產實際,對其生產備、裝卸工藝流程、運輸作業流程等進行調查研究和收集大量數據的基礎上,分析研究了約武鋼工業港成品碼頭生產能力的關鍵因素,並對這些關鍵因素進行了量化分析和研究,得出了影響武鋼工業港成品碼頭生產能力、裝卸作業效率和裝卸全面質量的關鍵性因素是貨物配載和船型不匹配、鋼材運輸組織流程不協調的結論,指出克服這些影響因素的思路和方法。
  4. 120 ac, air conditioned, airline desk, baby sitting, bar, barber shop, beauty salon, porters, boutiques, business center, conference facilities, coffee shop, coffee maker, concierge desk, 24 hour front desk, disco, drugstore, driving range, elevators, florist, exercise gym, hairdryer in room, health club, horseback riding, international direct dial, kitchenette, guest laundromat, maid service, mini bar, modem jack, multilingual, free newspaper, news stand, small pets allowed, playground, heated pool, indoor pool, outdoor pool, poolside snackbar, bus parking, parking, putting green, refrigerator, restaurant

    酒店擁有標準間豪華間商務豪華間及商務套間,以及商務豪華復式套房408間,房內全,有彩色電視衛星電視頻道閉路電視及收音波段室內冰箱獨立冷暖風空調系統。酒店的「浪花」會員娛樂部更擁有北京市獨有的室內外連通的超豪華暖水游泳池,溫泉歐式桑拿日式沖浪按摩及太陽浴將滿足您健身及放鬆的需要。酒店附近的跑馬場和27洞高爾夫球場則是鍛煉的好去處。
  5. As the market economy system is founding and china is to be accepted by wto. all parts of the coastal coal transportation system, especially the coastal harbors, face very drastically competition. the aim of this paper is to summarize the experiences of the construction of coal harbors, forecast the harbor throughout and shipping quantity based the main effect of the sea coal market by the investigation of the equipment of coal harbors, give the coal harbor evaluating index and methods, and analyze the foreground and countermeasure of the harbors based the system innovation by the developing forecast of coal market and the capacity analyze of coal harbors

    隨著社會主義市場經濟體的逐步建立以及我國加入世界貿易組織的步伐日益加快,煤炭海運系統的各個環節尤其是沿海煤炭運輸港口也面臨著十分激烈的市場競爭,本項研究的目的是總結歸納十幾年來我國煤炭港口建的歷史經驗,通過對我國煤炭海運港口基礎狀況進行深入調查,在研究煤炭海運市場主要影響因素的基礎上,預測我國中長期煤炭海運量和港口吞吐量,進而提出煤炭海運港口評價指標和方法;通過對煤炭市場的發展預測以及煤炭海運港口的能力分析,結合港口體的改革,分析研究煤炭海運港口的發展前景和對策。
  6. Based on the construction of the testing section for the lining of jiping main canal in shandong province of south - to - north water transfer project, the main causes of the cracking from the mechanized lining concrete slabs are analyzed from the aspects of foundation treatment, bedding layer placement, quality of the raw materials for the concrete, placement of the concrete, cutting of the hardened concrete and the curing of the concrete, and then the relevant prevention and control measures are pertinently put forward

    摘要結合山東省南水北調濟平乾渠工程襯砌試驗段工情況,著重從地基處理、墊層料鋪、混凝土原材料質量、混凝土澆築、成型混凝土割縫及養護幾個方面分析了機械化襯砌混凝土板裂縫產生的主要原因,並針對性地提出了預防及控
  7. How to grasp the historic opportunity of " the western developing " and the strategically modification of economic structure, how to speed up the urbanizing of ningxia according to its reality, and how to decrease the deference between the town and rural, is an important task of ningxia for its rapidly, healthly and commodiously development of the economy and social during the new century

    全區各類城鎮的規模普遍偏小,城鎮基礎落後,管理體落後,山川發展不平衡差異較大等問題,嚴重製約著農村城鎮化的發展。如何抓住西部開發和經濟結構戰略調整的歷史機遇,從實際出發,加快寧夏城鎮化進程,盡快縮小城鄉差距,是新世紀寧夏經濟社會快速、健康、協調發展的重要任務。
  8. Power dispatch facilities : power dispatching stations, power dispatch communications facilities, power grid dispatch automatic devices and power grid operation control facilities

    (四)電力調:電力調度場所、電力調度通信、電網調度自動化、電網運行控
  9. Takes several energy saving measures for air conditioning system, nick a large capacity centrifugal chillers working with variable frequency nil capacity chillers, variable frequency and variable flow control on secondary pump water systems, cooling tower for four - pipe water system in winter, fan - coil unit for commercial peripheral zones aid all - air systems for interior zones, variable frequency control on supply and exhaust air fain, enthalpy control on fresh air cooling in winter and intermediate season

    採用了多項空調節能措:大冷量離心冷水機組搭配變頻小冷量機組,二次泵變頻變流量空調水系統,四管風機盤管冬季用冷卻塔換冷供冷計,商業外區風機盤管、內區全空氣空調系統,送風機、排風機變頻控,過渡季、冬季利用室外新風通風降溫的焓值控計。
  10. This paper mainly focuses on the noise limiting by means of the direct sequence spread spectrum ( dsss ) and the analysis of the transmission performance of the plc and some digital modulation technology. the contents of the paper is as follows : 1 ) the technical feasibility is proved after simulating noise limiting principle of dsss by means of systemview, the simulation software ; 2 ) a kind of band pass filter ( bpf ) is realized according to the requirement of filter and the principle of butterworth approximation, which satisfies the index of performance of dsss. 3 ) the low voltage plc system includes the sc1128, the specific modulation / demodulation ic, the bpf filter and other circuit components, furthermore, the control function of system is realized by means of the personal computer and the microcontroller

    本課題在對低壓電力線的傳輸特性和數字調技術進行分析的基礎上,將通信理論中的直接序列擴頻技術( dsss )用於解決低壓電力線通信的干擾問題,主要研究內容如下: ( 1 )用通信模擬軟體systemview對dsss技術的通信和抗干擾原理進行模擬分析,分別對時域和頻域下採用dsss技術前後接收信號的頻譜進行分析,驗證dsss技術在本系統中的可行性; ( 2 )由dsss技術對濾波系統的要求,根據濾波理論分析了巴特沃思型濾波器的逼近原理並計了合適的濾波電路; ( 3 )用調調晶元sc1128和自行計的濾波器加之輔助外圍電路,構造出低壓電力線載波通信系統,並採用atmel公司的單片機計了接收和發射電路的微控器; ( 4 )分別對採取抗干擾措前後輸入和輸出信號進行對比實驗,並對結果進行分析,驗證了dsss技術對干擾信號的抑作用。
  11. Abstract : this paper discusses the method of adjustable speed driving with bi - directional power transferring converter for motors used in draining and irrigating pumps, a control strategy is proposed to realize super / hyper synchronous speed running with ac - ac converter, and a design for the driver is given based on 16 bit micro - controller

    文摘:針對農用電力排灌站電機調速改造問題,討論了雙饋調速實方案,提出了採用交交變頻實現超/低同步調速的一種控方法,給出了以高性能16位單片機為核心的雙饋調速控系統軟硬體
  12. The main points of hlsip quality control includes : during the design stage, it is necessary to control the scheme comparison and optimum design, esp. the waterwork, electromechanical device and irrigation region planning, to improve the design quality and pay attention to control the long - term benefits of design results ; during construction period, the supervisor should help proprietor choose construction contractor, sign the construction contract, supervise the manufacture of equipment and strictly execute the quality control procedure to subject the construction to controlled mode ; in addition, the contractors must improve their quality self - control, maintain the notion " quality first " and insist the full process, multiway, and multi system control of construction quality

    高揚程梯級提水灌溉工程質量控的重點包括:計階段控好方案對比、計優化,特別是水工建築、機電安裝、灌區規劃等多專業多目標的確定和協調,提高計質量和深度,注重控計成果的長期效益;工階段協助業主選擇好工承包商,定出嚴謹、完備的工合同,搞好備監造,嚴格執行質量控製程序,使工程工時時處于受控狀態;同時要提高承包商的質量自控能力,堅持工質量的全過程、多方法、多體系控
  13. In this paper, it is put forward the basic train of thought on implement metrobus traffic systems in shijiazhuang : ( 1 ) to improve the basic facilities of road to provide hardwares to metrobus traffic systems. ( 2 ) to build special road for bus or to build the bus priority control and management system are the first step to carry out the metrobus traffic systems. ( 3 ) to practice the running program that government and corporation are separated out or to mobilize the enthusiasm of the bus corporation

    石家莊的metrobus快速交通系統的思路如下: ( 1 )完善道路基礎,為metrobus快速交通系統的實提供硬體條件; ( 2 )開辟公共汽車專用道和建立公交優先控和管理系統,是實metrobus快速交通系統的第一步; ( 3 )推行政企分離的公交運行機調動公交企業的積極性。
  14. Some proposeals of comprehesive countermeasure for eutrophication were put forward., including pollution wource control of the basin, littoral management, optimal dispatch of water conservancy facilities, the project of helping lake taihu with diversion of changjiang river, and as well ass the setting of the water quality protection and legal system

    文章還提出了太湖富營養化綜合整治的若干建議措,包括流域污染源控,沿湖岸和湖內的綜合治理,水利優化調度,引江濟態工程和水質保護管理與法等。
  15. Part three has expounded further the explorations investigated rs activities in it environment in several middle schools in lan zhou and the relevant analysis based on those. such aspects as it environment, schools, teachers, students and practice of pbl activities are investigated. it was found that those schools who have no any pbl activity are lack of finance, it facility, rs knowledge, consciousness for rs from leaders in schools, effective organizing activities for pbl, and teachers " research capabilities for pbl ; on the contrast, those schools who have pbl activities achieved many benefits such as students " improved capabilities of acquiring, analyzing, evaluating, and processing information, changes of students " traditional studying manners, students " advanced capacities of synthetically applying knowledge, communication and cooperation, students " developed creative intelligence and practice abilities on research, students " high social responsibility and courage facing to frustration, extended modern education concept and increased performance of teachers, update of schools " facilities, innovation of schools " management system

    在本部分,論文通過初步走訪調研、問卷調查,研究從信息技術環境、學校、教師、學生以及研究性學習活動開展的具體實情況幾個層面進行了詳盡的調查,發現了在未開展活動的學校主要存在以下原因:資金短缺、信息技術環境落後;師生有關研究性學習活動的理論素養貧乏;學校領導思想意識不到位,對研究性學習活動的領導組織不得力;教師的業務能力、科研水平低下等原因;同時也分析了開展活動的學校在活動中取得的收益和存在的不足,其中收獲有:學生方面培養了學生獲取、評價、處理和分析信息等多方面的能力、轉變了學生的學習方式、培養了學生綜合運用知識的能力、培養了學生的創新精神和研究的實踐能力、增強了學生與他人交往、協同工作的能力、增強了學生的社會責任感以及面對困難、戰勝挫折的心理素質;更新了教師的現代教育教學觀念和意識,提高了教師的業務能力和素質;加快了學校教學的完善和更新,推動了學校各種管理體、激勵機的改革。
  16. Aim to analyze the problems in the course of the exploitation and utilization of water resources and offer some references to the sustainable utilization of water resources in baoji city, shaanxi, china in the future. methods beginning with the restrained factors that affects the sustainable exploitation of water resources, the main problems is systematically analyzed that exposed in the course of the exploitation and utilization of water resources : utilization ratio of water resources is low, water waste is serious ; groundwater is exploited excessively, water level drops continuously ; water pollution is serious, water quality worsens obviously ; management system of water resources is imperfect, the facilities of irrigation works wear out seriously. results it is suggested that pursue saving water all - round to build a water - saving society, and perfect the paid - use system of water resources to implement the industrial management of water resources, and strengthen the protecting consciousness of water resources together with controlling groundwater exploitation strictly, and increase the fund investments to enhance the irrigation works abilities of adjusting, holding and preventing the flood, and strengthen the network management of water resources besides improving the official specialized quality. conclusion the reasonable exploitation and utilization of water resources plays a key role in the sustainable development of economy and society in baoji city, shaanxi, china

    目的分析寶雞市水資源開發利用中存在的問題,為今後水資源的可持續利用提供參考依據.方法從影響寶雞市水資源可持續利用的約性因素入手,系統分析了在水資源開發利用中存在的主要問題:水資源利用率低,浪費嚴重;地下水開采過度,水位持續下降;水污染嚴重,水質明顯惡化;水資源管理體不健全,水利工程老化嚴重.結果提出了相關的解決對策:全面推行節約用水,建立節水型的社會;完善水資源有償使用度,實現水資源的產業化管理;強化水資源保護意識,嚴格控地下水開采;加大資金投入力度,提高水利工程的調蓄防洪能力;加強水資源網路化管理,提高管理人員的專業素養.結論水資源的合理開發和利用是實現寶雞市經濟社會可持續發展的關鍵
  17. The situation of yellow river dry - up is gradually rigorous. it has being influenced the development of the lower reaches of yellow river and the implement of strategy on developing the western areas. based on analyzing the harmfulness, causes of its dry - up from the factors of physical geography and human activities, this article put forward the engineering and non - engineering control measures for controlling yellow river dry - up : strenghtening the unified management and despatch for its water resource ; resorting to compulsion to save water ; quickening key projects duild for the addition of balance and water storing capacity ; increasing synthetical administer to ecological environment ; increasing effectivesupply of water resource

    黃河斷流形勢日趨嚴峻,斷流的頻率增加、時間延長、里程增大,嚴重製約了黃河流域尤其是黃河下游地區的可持續發展和開發大西部戰略的實.在分析黃河斷流造成的危害、黃河斷流的自然因素和人為因素的基礎上,提出了加強黃河水資源的統一管理和調度、採取強厲行節約用水、加快骨幹工程建增加調蓄能力、加大流域生態環境綜合治理的力度、適時開源增加水資源的有效供給等工程性和非工程性措,以防治黃河的斷流
  18. By analyzing existing situation of groundwater over - exploitation in the benefited regions of the south - north water transfer, based on the national and local legal systems, policies, we discuss the measures which should be taken to control groundwater tapping in the project

    摘要通過分析南水北調受水區地下水超采現狀,在分析國家有關法、政策以及南水北調受水區各地有關法及工作成效基礎上,從法角度對南水北調受水區地下水控開采魚需採取的措進行了初步探討。
  19. With the growing market trends to outsource and privatize non - core services by large conglomerates and multinational corporations, urban group focuses on this opportunity to enhance its services in facility management. developed from its total quality management approach, urban groups facility management service emphasizes people, process and space performance. services include facility space planning and design, cost control, operations and maintenance, supporting services, and value and process improvement services, which aim to enhance the productivity of the facility assets for different organizations to achieve the expected business results

    富城集團的管理服務概念源自全面優質管理理念,強調人才流程及空間表現三者的相互配合,服務范圍涵蓋空間策劃及計成本控運作及保養支援服務提升價值和改善運作流程等,協助各企業提高生產效率,強調因應不同機構的營運而作出配合,達致業務持續增長的目標。
  20. But we are telling them that we have tremendous concerns about what s going on, that china as a member of the permanent 5 the five permanent members of the un security council, has in many ways special responsibilities to make certain that the sanctions regime is enforced, and that we would really appreciate an answer to the inquiries that we ve made

    該法一般性的規定是,環保署應要求針對這些受管所排放的危險物質,進行調查、清理、或復育。這個計劃稱為糾正行動。一九九六年環保署估計,約有五千個相關有可能成為採取補救行動的對象。
分享友人