調水工程 的英文怎麼說

中文拼音 [diàoshuǐgōngchéng]
調水工程 英文
water diversion project
  • 調 : Ⅰ動詞1 (配合得均勻合適) harmonize; suit well; fit in perfectly 2 (使配合得均勻合適) mix; adju...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  1. On irtysh - karaghanda canal water transfer project in kazakhstan

    卡拉干達運河調水工程
  2. A study about water right on water diversion project

    關于調水工程權問題的研究
  3. This paper summarizes construction te chnologies used in canalseepage control project construction of wangzhuang irrigat ion area, suchas the manufacture of vibration machine, prefabrication of concr ete board, filling of expansion and contraction joint, pavement of geosynthetic s materials, and also supplies for reference of alike construction

    調是一項規模宏大,長距離、大規模的跨流域調水工程,由於要在大范圍內重新調土資源配置,必然會對調出區和調入區的社會經濟、生態環境均會產生較大的影響,在興建以前必須慎重研究,周密計劃,進行科學比選
  4. Guan zhong zone is a water resource shortage area. beside of the measures of water saving, constructing water works, and inter - watershed water dispatching, functions of existing water works should be noticed sufficiently to connect and dispatch various water works as a whole, so as to relax or to solve conflict between water resource supply and demand and to make a sufficient and effective use of water resource

    關中地區基本屬于資源性缺地區,要緩解或解決關中地區的資源供需矛盾,除採取節、興建蓄以及跨流域調水工程等措施外,首先應充分發揮已成利設施的作用,實現多種聯合運用、統一調配,使資源得到充分、有效的利用。
  5. Researches on social and economic benefits and ecological problems aroused by water transfer projects in the usa

    美國調水工程社會經濟效益與生態問題研究
  6. Study on multi - industry model for water transfer projects

    調水工程發展綜合經營模式的研究
  7. The following three alternatives are used to assess the impact caused by the projects, ( l ) the entrance of tunnel is at the downstream of the huanren dam and the main purpose of the huanren reservoir is to supply water for the project, ( 2 ) the entrance of tunnel is at the downstream of the huanren dam and the main purpose of the huanren reservoir is hydropower generation and ( 3 ) the entrance of tunnel is at the upper of the huanren dam

    本文擬研究該調水工程?桓仁庫的調度運行方式,使的正面效益較大,負面損失盡可能地小。桓仁庫的調度方式有三個方案: ( 1 )以供為主的壩下取方案; ( 2 )以發電為主的壩下取方案; ( 3 )庫區取方案。
  8. California state water project in usa

    美國加利福尼亞州調水工程
  9. Brief introduction of water transfer project in usa

    美國的調水工程
  10. Execution of water transfer to zhalong nature preservation zone

    扎龍自然保護區濕地調水工程的實施
  11. Effect of water diversion project on water environment of wulihu lake

    調水工程對五里湖環境影響分析
  12. Legislation and finance for the water transfer projects in california

    加利福尼亞州調水工程的法制建設與資金籌措
  13. Two interbasion water transfer projects in u. s. a. and their technical measures

    美國兩項跨流域調水工程和技術特點
  14. Optimization of water head allocation for large - scale water diversion project

    大型調水工程乾渠輸力優化分配
  15. The main channel of the middle route of the south to - north water transfer project, a cross - regional and long distance water transfer project, plays not only a necessary but also an important role in ensuring its main function and exerting landscape environmental benefits

    摘要南調中線干線是跨地域、超長距離的調水工程,在保障主體功能的同時發揮景觀環境效益不僅是必要的,也是重要的。
  16. Presently, the licensing of water rights in many drainage areas of this nation " s cross - regional water conduits is still operated under some loosely defined rules

    跨流域調權交易的法律調整目前,在我國跨流域調水工程中進行權交易尚處于探索階段,沒有一個相對成熟的交易制度。
  17. The paper suggests that the drilling of wells rely on the capacity of underground water, excessive pumping the strictly forbidden, and water - saving agroforestry be practiced, concluding that in the long run only when water diversion in western china is put into effect can the desertification condition in the “ three norths ” be thoroughly changed

    該文建議要以定井,嚴格控制超采,實施節林農業,還認為從長遠考慮,要盡快實施大西線調水工程,才能徹底改變「三北」地區的乾旱荒漠面貌。
  18. The north - to - south water diversion project is a large water a i locat i on project from one river basin to another r i ver basin in the northeast of china. one of the main problems of the project is how to determine the scale and amount of water allocated. since the scenarios of water allocation involve many factors, some of them are quantitative, some are qual itative, it is hard to solve using classical methods

    調是東北地區一項大型的跨流域調水工程,確定調規模、調量是其核心問題之一,而北調調方案涉及許多影響因素,既有定性的,又有定量的,難于用經典理論技術和方法解決。
  19. Rather, the solution would be promote production structure changes among regions or implement inter - basin water transfer projects on the basis of upgrading the efficiency of utilizing irrigation water

    解決的辦法還在提高灌溉用效率的基礎上,對農業生產進行合理的區域布局或是分批分期地實施跨流域調水工程
  20. This paper introduces the social and economic condition arid the status quo of water resources of central yunnan province, planning process and main planning achievements of water transfer to central yunnan province

    介紹了滇中地區的社會經濟、資源狀況,滇中調水工程規劃過和主要規劃成果。
分享友人