調節壩 的英文怎麼說
中文拼音 [diàojiébà]
調節壩
英文
regulating barrage-
For example the concrete faced rock - fill dam in frigid zone is distinctive in terms of frost resistance and durability, cushion material seepage prevention and frost heave, adaptability of darn filling with season coordination among construction diversion, flood discharge and the whole construction schedule etc. lianhua construction which is situated in mudanjiang basin of heilongjiang province firstly creates the successful record of construction of large - size faced rock - fill dam in frigid zone, a series of internal and external problems not having a precedent to go by have been solved
如在面板的抗凍耐久性、墊層材料防滲和凍脹特性、壩體填築與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地區混凝土面板堆石壩均有其獨特之處。蓮花工程位於黑龍江省牡丹江流域,首創了高寒地區修建大型面板堆石壩的成功記錄,解決了一系列國內外均無先例的難題。In this paper according to the design scheme of yao heba power station in nan yahe river, the mathematical model with longer and complicated conduit system, elastic water hammer and pid regulating low of voter turbine adjusting system in the case of the small fluctuation has being built, which include conduit system, surge tank, draft tube, water turbine, generator and governor. the hydraulic losses are taken into account, and nonlinearization in water turbine and the governor is also taken into account
本文根據南椏河姚河壩水電站的設計方案,對水輪機調節系統,按長引水管道復雜引水系統、彈性水擊、調速器為pid調節規律,在小波動情況下,對包括引水道、調壓井、尾水管、水輪機、發電機、調速器在內的水輪機調節系統建立數學模型,並計及引水管道水力摩阻損失,對水輪機、調速器考慮了其中的非線性,利用功能強大的matlab軟體編制了源程序進行計算機模擬計算。Considering the joint operation of the three gorges and gezhouba hydropower stations, influences of the daily regulation planning of the hydropower stations on the water surface slope of the downstream reach of the three gorges reservoir are studied
?結合三峽和葛洲壩兩電站聯合運行的實際情況,研究了調節方案對三峽水庫下遊河道水面比降的影響。The scour and silting situation of the reversed equalizing pond of shimen hydropower station and the capacity of regulating volume after the flexible dam restored are expounded, the operation mode for shimen reservoir is put forward
根據實測結果,闡明了石門電站反調節池沖淤形態和橡膠壩恢復后的水量調節能力,提出了石門電站運行調度的基本模式。After the hydraulic project of the three gorges of the yangtze river is completed, the water level in front of the dam of the three gorges reservoir area will be raised from the now several tens of meters to 175 meters. furthermore, because of the needs of preventing floods, the water level of reservoir area will be adjusted periodically between 175 meters and 145 meters every year. this will inevitably cause the revival of part ancient landslides and the formation of new landslides, which will definitely influence the urban construction, the traffic transportation, the people ' s life and property security, etc. in the three gorges reservoir area
長江三峽水利樞紐工程建成蓄水后,庫區壩前水位將由現在的幾十米海拔高程提高到175m ,且由於防洪的需要,庫水水位每年還將在175m與145m之間進行周期性調節,這無疑將導致部分古滑體的復活和新滑體的產生,結果勢必會對未來三峽庫區范圍的城鎮建設、交通運輸、人民生命財產安全等造成一定的影響。The dam gantry crane design of xixiayuan counter regulate reservoir
西霞院反調節水庫工程壩頂門式啟閉機設計Critics say that while the dam can handle flood surges, it may contribute to downstream flooding for an unforeseen reason
然而批評人士稱,盡管大壩能起到調節洪水的作用,但卻有可能因一個意想不到的原因釀成下游地區洪水泛濫。Hongjiadu hydraulic power plant is the only leading water storage reservoir of wujiang cascade hydraulic stations, which is a full - time storage reservoir. 2 * landslide body is distributed at the right side of downstream, which is just located in the region of energy dissipation. erosion gully may cut the bottom of the landslide body. there are roads on the top of the landslide body during the construction period and operating period
洪家渡水電站是烏江梯級水電站中唯一具有多年調節性能的「龍頭」水庫, 2 #塌滑體分佈於壩址下游右岸,恰好位於泄洪消能防沖區內,沖坑將塌滑體下部切腳,而且施工期和運行期在其上都布置有公路,因此2 #塌滑體失穩將影響整個水電站的正常運行。Adaptability of dam filling with season and coordination among construction diversion, flood discharge and the whole construction schedule should be taken into consideration. the choose of dam site, layout of the multipurpose project, design of concrete faced rockfill dam, construction and prototype observation are covered in this paper
如在混凝土面板的抗凍耐久性、墊層材料防滲和凍脹特性、壩體填築與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地區混凝土面板堆石壩均有其獨特之處。分享友人