調節河流流量 的英文怎麼說

中文拼音 [diàojiéliúliúliáng]
調節河流流量 英文
regulated stream flow
  • 調 : Ⅰ動詞1 (配合得均勻合適) harmonize; suit well; fit in perfectly 2 (使配合得均勻合適) mix; adju...
  • : 節構詞成分。
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 調節 : regulate; adjust; monitor; measure; take care of; condition; regulation; adjustment; conditioning...
  • 河流 : rivers; stream
  • 流量 : rate of flow; flow; runoff; discharge; throughput; (flow) rate; quantity (of flow); flux
  1. By means of kiba formation, k. ibt " and kibt2 segments analysis on the equivalent time stratigraphic framework, subtle traps will be predicted on stratigraphic traps and lithological traps. the results from the research indicated that : ( 1 ) this paper further indicates the control significance of southern boundary fault displacement component, which downthrown side forms syncline or anticline, and points out that 4 anticlines in south are adjustment zone and are the entering lake position of ancient river

    本論文的主要認識和結論如下: ( 1 )進一步認識南緣邊界斷層位移對下降盤形成次凹或橫向突起的控制意義,認出南緣的4個突起是調帶之所在,也是古入湖處。這種格局導致凹陷強烈分割,並以橫向搬運為主。
  2. Built up the optimal compensation regulation model of cascade hydropower stations for water resources system in the main stream of the yellow river, adopted poa method to solve optimal model in order to analysis water supply and generation electricity compensation benefits, discussed its distribution project and implementation countermeasures

    本論文主要針對黃水資源系統建立幹梯級水庫、電站補償調優化模型,採用逐步優化演算法( poa )求解模型,定分析計算了黃以及電補償效益,探討了黃補償效益的分配方案和實施對策。
  3. Runoff is also governed by the number and the length of streams in the basin.

    盆地內的和長度也能調
  4. So far as the alluvial fiver is concerned, the sediment - carrying capacity of flow and hydraulic geometry of river channel can be regulated by regulating the composition of flow rate, silt concentration and sediment ( water and sediment regulation ) during water and sediment discharge ; with which the relative balance for water and sediment discharge and the river channel evolution can be obtained

    摘要沖積性床在輸水輸沙過程中,調及含沙和泥沙組成(調調沙)可以調床水力幾何形態和水挾沙力,追求水沙輸運和床演變的相對平衡。
  5. B ) utilizing dong zhuang reservoir to adjust during on year. thus can decrease the sediment deposit of lower wei - river as result small flood and non - flood season

    利用東莊水庫調洪水,進行年內調,盡可能減少小洪水和非汛期小水對渭下游的淤積。
  6. In this passage, author has studied the quota of irrigation that can make water used economically for various plants, if the irrigation quota can be lowered from 6795 m3 / a to 4500 m3 / a during the processes of irrigation, there will be a saving water amount of 3. 386million m3 / a, in shiyang river basin. there is no doubt that we can open the second source of river water that can provide the possibility of transporting 300 million m3 / a water amount to lower reaches of the river. in this paper, there are some analysis and prospects for the future situation of supply and demand of water resources in 2010

    民勤水資源減少的主要原因是人為因素,如全域人口增加、中上游耕地面積擴大,用水增加,造成灌區重心上移;沒有樹立可持續發展觀,在經濟中搞短期行為;對石羊入民勤水不斷減少、地表水、地下水轉化活躍、生態用水問題突出等方面進行了分析論證;對目前開發利用現狀、供需狀況進行了較為詳細的計算和評價;通過對各種農作物水灌溉定額的研究,若從現狀灌溉定額6795m ~ 3 ha降低到4500m ~ 3 ha實施灌溉,石羊域將水3 . 3867億m ~ 3 ,這無疑于開辟了第二水源,提供了向下游調水3億m ~ 3的可能性。
  7. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃小浪底水利樞紐復雜的水文、地質條件以及龐大的工程規模.該樞紐設計有3條排沙洞,擔負著泄洪、排沙、調和保證進水口不被泥沙淤堵的任務.根據排沙洞的水庫運用要求,灌漿帷幕下游排沙洞洞身段設計為混凝土后張預應力隧洞.通過大調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧洞襯砌工程,在國內尚屬首例
  8. The main features in the study of flood forecasting and control system are as follows : ( 1 ) runoff generating and confluence theory and hydro - dynamic method are adopted to predict the water level of taihu lake and key nodes, the basin wide forecasting and control system with the function of real time correction has been first established in plain river network to meet the complicated flow conditions of taihu lake basin and to enhance the reliability of forecasting results ; ( 2 ) according to the rainfall in foreseen period multiple schemes can be made in the forecasting model and adjusted with time, which overcomes the errors caused by the uncertain rainfall in the foreseen period so as to make the forecasting results approach reality

    本文所研究的預報調度系統有如下特點: ( 1 )本系統採用產匯理論和水動力學方法預報太湖及重要點水位,首次在平原網地區建立了具有實時校正功能的全域預報調度系統。以適合太湖域復雜的水力條件,增強預報的可靠性; ( 2 )預報模型可以根據預見期降雨進行多方案預報,並隨時間推移,可以實時進行調整,克服由於預見期降雨不確定引起的誤差,使預報結果更接近實際。
  9. Article 9 relevant departments under the state council and local people ' s governments at various levels shall, when developing, utilizing, regulating and allocating water resources, make integrated plans for maintaining proper river flows, proper water levels of lakes, reservoirs and proper ground water tables, in order to retain the natural purification capacity of water bodies

    第九條國務院有關部門和地方各級人民政府在開發、利用和調調度水資源的時候,應當統籌兼顧,維護江的合理和湖泊、水庫以及地下水體的合理水位,維護水體的自然凈化能力。
  10. ( 2 ) in term of two cases that being upstream long - liu regulation or not, solved optimal model to obtained compensation results of water supply and generation electricity. the ning - meng system increased water 17. 08 * 10a8 m3, the downstream system increased 7. 13 * 10a8 m3 ; the runoff power stations increased generation 8. 93 * 10a8 kw - h, the san - xiao increased 9. 10 * 10a8 kw - h

    ( 2 )按照「無」龍劉調和「有」龍劉調兩種情況,分別進行模型求解計算,對比分析得到黃上游水電站為中下游提供的水以及電補償調結果:多年平均上游水電站為寧蒙灌區增加有效供水17 . 08億m ~ 3 ,為下游省市增加有效供水7 . 13億m ~ 3 ;為上游徑式電站增加電8 . 93億kw ? h ,為三小增加電9 . 10億kw ? h 。
分享友人