豎向接縫 的英文怎麼說

中文拼音 [shùxiàngjiēféng]
豎向接縫 英文
vertical abutment joint
  • : Ⅰ形容詞(跟地面垂直的; 從上到下的) vertical; upright; perpendicular Ⅱ動詞(使物體跟地面垂直) se...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : 縫名詞1. (接合處) seam 2. (縫隙) crack; crevice; fissure; slit
  • 接縫 : seam; jugum; joint; kiss; unwelded joint接縫刨 jointer; 接縫構造 seam construction; 接縫灌漿 joint grouting
  1. ( 1 ) based on the experiments, this thesis discusses the stress loss of vertical prestress caused by deformation of anchorage, the resilience of the tendon and the joint compression ( l2 ), the elastic compression of the concrete ( l4 ) and the relaxation of the tendon ( l5 ). it is concluded that the anchorage deformation is dominated in vertical stress loss. measures are suggested to diminish the loss of the vertical prestress during the design and construction of the bridge

    ( 1 )本文在試驗的基礎上,研究了預應力筋的錨具變形、鋼筋回縮和壓縮損失l2 、混凝土的彈性壓縮損失l4和力筋的應力鬆弛損失l5 ,其中,第一項是最主要的損失,論文據此對設計和施工中如何減小預應力的損失提出了自己的看法和建議。
  2. Besides, with stated heightand brendth ratio, acted on by horizontal and vertical load, the ultimate loads of wall failed in bending - shear is similar to one failed in shear. the walls crack form is indefinite. we ca n ' t define consolidate menthod only by the crack from

    另外,一定高寬比的磚墻在與水平荷載聯合作用下,當彎剪破壞與剪切破壞的極限荷載比較近時,其破壞形式具有不定性不能簡單地以裂形式確定加固方案。
  3. An overview of the monitoring of the cantilever cast - in - place construction of pre - stressed concrete continuous rigid frame box - beam

    豎向接縫對連續剛構橋長期變形的影響分析
  4. The writer has been engaged in research from construction supervisory control. the paper mainly includes calculation theory of structure, supervisory control of elevation, technology of closure, vertical seam problem, and so on. at the same time, some feasible operating methods and advice are brought forward

    本文從施工監控的角度對連續剛構橋進行了研究,對于其結構計算理論、標高監控、合攏工藝、豎向接縫等問題做了較細致探討,並提出一些切實可行的操作方法和建議。
分享友人