豎接 的英文怎麼說

中文拼音 [shùjiē]
豎接 英文
vertical joint
  • : Ⅰ形容詞(跟地面垂直的; 從上到下的) vertical; upright; perpendicular Ⅱ動詞(使物體跟地面垂直) se...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  1. Equilateral triangle that appears to be carved into marble. the triangle contains a circle ; both are bisected vertically

    像是鐫刻在大理石上的等邊三角形。三角形中有一個內圓;圓和三角形都被直等分。
  2. The removal of nocturnal solitude, the superior quality of human mature female to inhuman hotwaterjar calefaction, the stimulation of matutinal contact, the economy of mangling done on the premises in the case of trousers accurately folded and placed lengthwise between the spring mattress striped and the woollen mattress biscuit section

    消除了夜晚的孤寂,人成熟的女性的溫暖勝過非人「湯壺」的熱氣以及早晨的觸給予的刺激把長褲疊,著夾在彈簧床墊帶條紋的和羊毛墊子黃褐色方格花紋之間,就能節省熨燙之勞了。
  3. The paper mainly consider the followings : the performance parameter determination of cryopump, heat load determination and heat transfer of large cryopanel, reasonable distribution of heat load, the condition for construct steady flow in small vertical circle pipeline, balance condition for gas and liquid two - phase flow in the connection pipe between cryopanel and dewar, the safety of cryopump

    文中探討了低溫泵性能參數的確定;大抽速低溫抽氣面的熱負載的確定及合理分配;冷凝面上直圓管內受熱建立穩定流動的條件;冷凝面與杜瓦間的連管道內氣液「雙相流動」的平衡條件;低溫泵系統運行的安全問題。
  4. From prince shtcherbatovs house the prisoners were taken straight downhill across the virgins meadow to the left of the monastery of the virgin, and led to a kitchen garden, in which there stood a post

    離開謝爾巴托夫公爵府,俘虜們被帶著直往下走,經聖母廣場,到聖母修道院左邊,然後又被帶到一個菜園,那裡立著一根柱子。
  5. The wave forms of the glass building are highlighted by a series of extruded aluminum brush finish mullions, following the vertical, curvilinear shape on the north and south facades

    波浪式的玻璃建築上是層層凸起的鋁刷墻面框,緊南北墻面的垂直曲線。
  6. A few paces off is an enormous pillar, and another ? seven in all down the length of the hall, supporing in the centre line the springing arches of the double groining

    幾步開外有根高大的柱子,著又一根,再著又是一根;大廳縱深一共著七根大柱,支撐著雙拱屋頂落在橫向正中的拱底石。
  7. The mountains are a body of granite, often with vertical joints

    這些山峰都是花崗巖體,通常是由合點連
  8. Performance analysis of single pile - soil interface under vertical load

    向載荷作用下單樁觸面性能分析
  9. 2 ) the value of base frequency, which is the first order vertical - bending vibration, is bigger in box girder bridges than those of t - beams. it shows that the vibration performance of box girder bridge is better than t - beams. 3 ) when considering the shear deformation of beam, the vibration frequency calculated by is bigger than those not considering the shear deformation

    T型梁的基頻為橫向振動,而整體箱梁的基頻為向彎曲振動;整體箱梁的一階彎振動的頻率比t型梁得到了提高;整體箱梁的動力性能優于t型梁;考慮剪切變形后,梁的自振頻率降低,對于整體箱梁其降低值近於5 ,在分析時不應忽略。
  10. And so, the gis - based electric cable information management system can administrate transformer substation, switch substation, power distribution room, power cable, silo, canal and high voltage user according to their location, drawings, cable records. the system provides multiple index for query service and statistical electric cable graph and information on properties

    本系統可以實現對變電站、開關站、配電室、電纜、井、溝道及高壓用戶等空間位置、圖形資料(包括一次線圖、竣工圖、斷面圖) 、電纜臺帳信息的綜合管理;並可按多種方式來查詢、檢索、統計電纜圖形及屬性數據信息。
  11. "i could see them pricking up their ears and looking at each other, " went on the mole.

    鼴鼠著說:「我看到他們都起耳朵在聽,還面面相覷。」
  12. A dozen of these sectaries of tingou lay flat upon their backs, while others, dressed to represent lightning - rods, came and frolicked on their noses, jumping from one to another, and performing the most skilful leapings and somersaults. as a last scene, a human pyramid had been announced, in which fifty long noses were to represent the car of juggernaut

    首先是有十二三個這種「天狗神派」的演員仰臥在臺上,著又來了另一些長鼻子夥伴跳到他們那些象避雷針一樣立著的鼻子上,他們在這些鼻子尖上蹦跳,飛躍,從這個鼻子到那個鼻子來回表演著各種令人難以相信的絕技。
  13. It ' s an ideal structural system and has multi - earthquake resistance ability because of a great deal of slabs removed in floors above the transfer - story amended the lateral stiffness of the stories near the transfer - story. based on the available references, the five - spring line element, the three - spring line element and the multiple vertical - line - element model are introduced to model special column, beam and shear - wall, the relevant stiffness matrixes are deduced and the restoring - force models are gaven to deep into the elasto - plastic seismic characteristics of the structure. acording to the results of shaking table test and elastic finite element analysis, a new making model melhod is presented in which uses the linear and the nonlinear element and the assumption that the floor is infinitely rigid in different areas

    為進一步研究這種復雜高層建築結構的彈塑性性能,本文在國內外現有研究的基礎上,提出利用五彈簧桿元、三彈簧桿元及多線單元模型分別模擬空間柱、梁和剪力墻,推導了相應的剛度矩陣並給出了恢復力模型;結合試驗研究和精細有限元分析的結論,提出線性和非線性單元相結合,剛性樓板假定和彈性樓板相結合的建模方法,較好地解決了空間結構彈塑性分析中佔用計算機資源較多的問題;力大型有限元分析程序? ? ansys ,在上述建模思路的指導下建立了結構的空間非線性分析模型,進行了空間三維彈塑性時程分析。
  14. The ears are sutured and either tapped over the head and covered with gauze, or are taped and glued to a wedge of foam, or a styrofoam cup, or some other manner to keep the ears upright to allow for healing of the edges

    耳朵縫合,兩只耳朵在頭部上方用紗布包裹搭或者沾在一個楔形物上,或者用一隻泡沫聚苯乙烯杯子等其他一些方式來保持耳朵在切口愈合期間立。
  15. Each filter option contains a description of the filter, followed by the vertical bar and the filter pattern

    篩選器字元串包含一個或多個篩選選項。每個篩選選項都包含一個篩選器說明,後線和篩選模式。
  16. Members section of the steel truss are designed mainly according to vertical load, which earthquake load can not change. however, changes of members stress should be regarded, such as the steel truss members connecting shearwall

    鋼桁架轉換結構設計主要受向荷載控制,地震荷載不改變其主控荷載,但對地震荷載作用下鋼桁架構件受力的變化應予以重視,尤其是與向構件連的鋼桁架兩端構件。
  17. ( 1 ) based on the experiments, this thesis discusses the stress loss of vertical prestress caused by deformation of anchorage, the resilience of the tendon and the joint compression ( l2 ), the elastic compression of the concrete ( l4 ) and the relaxation of the tendon ( l5 ). it is concluded that the anchorage deformation is dominated in vertical stress loss. measures are suggested to diminish the loss of the vertical prestress during the design and construction of the bridge

    ( 1 )本文在試驗的基礎上,研究了向預應力筋的錨具變形、鋼筋回縮和縫壓縮損失l2 、混凝土的彈性壓縮損失l4和力筋的應力鬆弛損失l5 ,其中,第一項是最主要的損失,論文據此對設計和施工中如何減小向預應力的損失提出了自己的看法和建議。
  18. The elaborately - planned event began with a chinese zither recital, followed by choral singing that captivated the hearts of audience members. next, a piano and violin duet gave immense pleasure to music lovers, who also enjoyed a tenor s singing, which left the whole auditorium reverberating with the sound of his vibrant voice. the audience also cheered and applauded a brilliant folk dance, followed by a romantic musical dialogue between a harp and a flute that pushed the event to a soul - elevating climax

    在同修們精心的策劃下,當天演出的內容首先由古箏彈奏揭開序幕,緊著是合唱團的演唱,悠揚的歌聲令人沈醉不已小提琴與鋼琴的合奏,更是動聽悅耳高亢的男高音獨唱,音質獨特,餘音繞梁精湛的民族舞蹈,則贏得滿堂喝采最後壓軸是琴與長笛的合奏,浪漫動人的曲調,將現場帶入另一波高潮,結束了這場音樂的對話。
  19. For the comprehensive cognition to the prestressed concrete frame, four monolayer and monospan frames is built, two of which are loaded only vertically and the other two are loaded vertically and horizontally at the same time

    為了對預應力框架的受力性能有一個全面深刻的認識,重慶建築大學又製作了四榀近足尺的單層單跨預應力框架,並對其中兩榀同時施加水平荷載和向荷載進行了試驗研究。
  20. The diaphragm wall of top down construction not only supports the horizontal loads at stage of the temporary construction, but also bears vertical loads, as a part of the main structure, the outer wail of the basement

    逆作法施工中的地下連續墻不僅在施工時起臨時支護作用,承受水平荷載,而且可直作為地下室的外墻,並承擔一定的向荷載。
分享友人