負荷側 的英文怎麼說

中文拼音 [zhāi]
負荷側 英文
load side
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • : 側形容詞[方言] (傾斜; 不正) slant; sloping
  • 負荷 : [電學] load; charge; weight
  1. The air conditioning or heating water systems with primary water system in heat source or cold source side and secondary water system in load side divided by direct connection mode need to adopt connectors or water mixers

    摘要用直接連接方式劃分熱源(或冷源)一次水和負荷側二次水的供暖或空調水系統,需要採用連通器或混水器。
  2. The outcomes show that the two methods can separate the basin pollution load from different sides, the two separation results are close to each other and can be provided as references for drafting pollution prevention policies and ; the proportion of the two pollution loads in the basin is more or less the same, point source is slightly heavier in a dry year and the proportion of non - point source pollution is greater in a wet year

    結果表明,兩種方法可以從不同的面分別對流域污染進行分割,且兩者分割結果相近,可以為流域污染防治政策的制定提供參考;流域內兩類污染所佔比重大體相當,枯水年點源污染比重略高,而豐水年非點源污染比重較大。
  3. Furthermore, it is very important that improve the autoimmunization of substation without watch - keeper. in the design of substation, we predigest main wiring with a minitype base and adopt simple wire - connection : dule t type is used in 66kv side, segmented single bus - bar with hospital bus - bar is used in l0kv for major load

    在該無人值班變電所的設計中,以小型化模式為基礎,簡化主接線: 66kv採用雙t接線方式,正常時雙線雙變壓器分列運行; 10kv由於饋電線路較多,較為重要,因此採用單母線分段帶旁路接線方式。
  4. A dc transit system can never be fully protected because the protection cannot always distinguish between distant faults and train load currents for both of the currents have the similar magnitude and the rate of change

    在各種短路故障中,地鐵直流遠方短路故障由於其故障電流的大小和變化率都很難同正常電流鑒別開來,所以至今難以做到百分之百的保護。
  5. Fit for seding uniform size cartons in mass production line, automatic flaps folding and, top and bottom sedling, side belts driven, suitable for heavy duty operation

    詳細說明單規格紙箱適用。紙箱上蓋及后蓋自動折入,快速平壓不折角。麵皮帶驅動,重、易操作。標準規格品,零件隨時供應。
  6. Steel strip sheaths for prestressing tendons - test methods - determination of lateral load resistance

    預應力鋼絲索用鋼帶護套.試驗方法.抗力的測定
  7. Fn ( c ) - 12 type h. v. load switch and fuse box is basied on the fn7 - 12series h. v. load switch. with operating mechanism. make the installation more simpler. can meet orders needs

    12型系列高壓開關及熔斷器組合電器是在fn7 - 12系列高壓開關的基礎上,增加面操作機構,使得安裝更加簡捷方便,能夠滿足廣大用戶的不同要求。
  8. This present dissertation analyzed the practice of power price in china ’ s dsm by using quantitative method and qualitative method. though the price shifted part of peak load to the valley, and enhanced the electro - efficiency. it did not lead to the load ratio remarkably rise

    盡管電價在我國電力需求管理中具有移峰填谷的作用,提高了電能的使用效率,但是,價格杠桿的運用沒有帶來用電率的大幅提高,電價對調節電的作用並不明顯。
  9. Under the new situation, marketing and company development system based on market oriented, deepening market permeation on objective market, widening occupying substitute - goods market, improving service level, increasing market competitive ability, which are great effecting the national economy and people ’ s living standard

    據介紹,美國、日本、加拿大、德國、法國、義大利等國家都有一支龐大的隊伍從事需求管理工作。僅2003年,美國投入約15 . 6億美元實施電力需求管理與營銷工作,節電537億千瓦時,減少高峰2200萬千瓦。
  10. Because the harmonics in tangyin substation are primarily from electric traction loads, this paper gives the structures of several main locomotive models and general harmonics they produce. the harmonics produced by electric locomotive have a characteristic that their range and phase are both dispersive. this paper also analyzes the impedance - matching balance transformer ' s structure and harmonics injected into the power system at its primary side, and sums up the characteristics of the harmonics from electric traction loads in the tangyin traction substation

    鑒于湯陰變電站的諧波主要來自電力牽引,本文列舉了電力機車幾種主要車型的結構以及它們產生諧波的概況,得出了電力機車的各次諧波電流幅值和相角具有較大分散性的特點。針對湯陰牽引變電站的牽引變壓器,分析了阻抗匹配平衡變壓器的結構及其高壓注入電網的諧波,推導了有關計算公式。通過理論分析並結合湯牽線的實測諧波數據,歸納了電力牽引注入湯陰變電站的諧波的特點。
  11. Because of forecasting reactive load at first, it can detect the change of voltage at low - voltage bus from the change of reactive load or the change of voltage at high - voltage bus, then it can decide that adjusting transformer tap or capacitor switch, and avoid blindly and deficient adjusting. on the condition the reactive power is balanced and voltage qualified, it can realize the switching times of loaded taps and capacitors being efficiently decreased

    由於預先預測出無功,提前了解了無功功率變化的趨勢,可以有助於判定低壓母線電壓變化是由無功變化引起還是由高壓電壓變化引起,從而適時決定是調有載調壓變壓器分接頭還是投切電容器,以此避免了盲目和不充分的調節,實現在保證無功基本平衡和電壓合格率的前提下,減少有載調壓變壓器分接頭的調節和並聯電容器組的投切次數。
  12. From the calculation for the system of refrigeration, the choice of equipment, to the calculation for the temperature field and velocity field, the emphases is building model for evaporator in static state and dynamic state, do calculation and analyse for the whole space with temperature field and velocity field

    從製冷系統的計算,設備的選型到溫度場和流速場的計算,其中重點是為蒸發器製冷劑和空氣參數建立穩態和動態數學模型,對整個冷庫的庫體空間進行溫度場和流速場的分析計算。
  13. It has the characteristics of fault component relays such as being immune to the load and the system operating mode and the zero sequence components required by the relay can he easily acquired and available for a long time

    由於採用零序電量作為判斷依據,新方法具有受兩電源角度的影響小,且受、系統運行方式的因素影響小的特點。
  14. Side channel pumps pn 40 - nominal duty point, main dimensions, designation system

    槽泵pn40 .公稱點主要尺寸和命名系統
  15. The article mainly introduces the software design of load management system in dsm including the design of the software ' s total structure, communication protocol, basic domain and its sub - procedure

    摘要主要介紹了需求管理中管理系統的軟體設計,包括總體結構、通信協議、基本域以及基本域子程序的設計。
  16. En 524 - 4 steel strip sheaths for prestressing tendons. test methods. part 4 : determination of lateral load resistance

    預應力鋼筋混凝土構件用鋼筋鞘管.試驗方法.第4部分:耐測定
  17. The numerical results show that because of the temperature variation of cooling water along its flow direction the heat load of the second - pass tube bundle is lower than that of the first - pass tube bundle, which brings about the steam flow deflection and then the deterioration of heat transfer

    計算結果表明,由於冷卻水溫度沿冷卻水流動方向的變化,第二流程管束的熱明顯小於第一流程的,並使蒸汽流動?生向偏斜,導致流動與傳熱特性的惡化。
  18. Second, the model for evaporator is founded based on traditional theory, including refrigerant side and air side, and the method for choosing element ; the calculation for the load of refrigeratory ; the thickness choice for heat insulation material ; the work area of evaporator is conformed ; and the matching for the other elements

    2 )根據傳統理論建立了蒸發器的數學模型,包括冷劑和空氣的數學模型、微元的選取;冷庫冷的計算和確定;隔熱材料合理厚度的選擇;蒸發器工作面積的確定;以及其他製冷元件的匹配理論。
  19. Moreover presents a step - to - optimization contract mode that can effectively estimate the cost of customer ' s participation in order to take a customer - specific incentive payment and maximize the benefit of utility by using the customer behaviors. meanwhile also discusses a model about the dynamic flow model with the consideration with interruptible load. on the other hand, this paper discusses the influence from the demand side generation for the electric power system and presents an advanced design model for distribution networks, especially for demand side generations

    本文首先總結了需求管理的基本概念和主要內容,然後根據以前的研究成果,提出一種基於用戶行為的分步優化合約方案,能有效的估算用戶實施該措施的成本,從而達到電力公司收益最優,同時討論了考慮可中斷的動態潮流模型;另一方面,本文還基於分佈發電技術,探討了用戶發電資源對電力系統的影響,並提出考慮該資源的配電網規劃模型改進方案。
  20. Flexible load control, an important program of dsm, comprises the interruptible load and demand side generation. this paper shows how the application of dsm can be a very efficient technique for energy conservation

    在需求管理中,柔性措施是一項重要內容,主要包括可中斷和用戶發電等內容。
分享友人