負荷轉移 的英文怎麼說

中文拼音 [zhuǎn]
負荷轉移 英文
load transfer
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 荷名詞(蓮) lotus
  • : 轉構詞成分。
  • : Ⅰ動詞1. (移動) move; remove; shift 2. (改變; 變動) change; alter Ⅱ名詞(姓氏) a surname
  • 負荷 : [電學] load; charge; weight
  • 轉移 : 1 (改換位置) shift; transfer; divert 2 (改變) change; transform 3 [醫學] (擴散) metastasis;...
  1. The negative photoconductivity effect was found in the dimixing phthalocyanine composites. the experiment results indicated that the negative photoconductivity effects were closely related with the partial charge transfer from the center metals to phthalocyanine rings, and the separation efficiency of photocarriers was a key factor to the photoconductivity

    結果表明,共混復合后,其光電導性能表現出效應,並發現酞菁中心金屬與其相連的氮原子之間的部分電是引起復合體系光電導性能變化的根本原因,同時復合體系中的電子空穴對的分離效率是影響光電性能的一個重要因素。
  2. Industrial projects refers to the major projects and accessory facilities completed which result in forming production capacity and have been checked and accepted while the living and welfare facilities have been completed and can ensure normal production and formally put into production

    工業項目是指設計文件規定形成生產能力的主體工程及其相應配套的輔助設施全部建成,經試運,證明具備生產設計規定合格產品的條件,並經過驗收鑒定合格或達到竣工驗收標準,與生產性工程配套的生活福利設施可以滿足近期正常生產的需要,正式交生產的建設項目。
  3. Failover time for the database depends on how fast the mirror server can roll forward the log in the redo queue, which, in turn, is determined primarily by the system hardware and the current work load

    數據庫的故障時間取決于鏡像服務器前滾重做隊列中日誌的速度,此速度反過來主要由系統硬體和當前的工作決定。
  4. We propose a combined slf method to extrapolate feeder load growth by using feeder ' s history peak value and the merits of gray theory and genetic programming ( gp ). at first, we adopt load transfer coupling method to correct load history and its error for load transfer. secondly, we get the real power - supply area by using layer overlap analysis, based on practical feeder path and distribution gis map layer

    將gis的空間信息分析功能應用於配網空間預測的研究:綜合利用灰色理論及遺傳規劃( geneticprogramming , gp )的優點,提出了一種根據饋線的歷史峰值進行外推的組合slf法:首先採用耦合回歸法來修正歷史,消除由於負荷轉移引起的誤差;然後根據實際饋線路徑和配網gis圖形分層,運用圖層疊加分析得到饋線的實際供電范圍;接著採用灰色關聯度聚類方法對饋線增長曲線進行聚類分析;最後採用gp來對灰色聚類結果進行符號回歸,分別得到每一類曲線的最佳擬合曲線形式。
  5. The result shows that the unit has remarkable energy saving effect, and it can relieve the pressure of power supply to some extent for its character of energy storage

    結果表明,該機組具有明顯的節能效果,並且由於其具有蓄能特性,可以在一定程度上緩解夏季電力供應的壓力,有效高峰
  6. The load - control apparatus adopted a single - chip microcomputer system, whose mcu was a kind of high - speed processor - ds80c320, whose a / d switched apparatus was max180, whose low - pass filter was max293, whose f / v transformed circuit was lm331, whose controlled silicon phase - shift touch - off circuit was tca785, and whose communicating interface of rs232 was max202. the watchdog of the mcu was max705 and the system used an on - off electrical source to supply power

    球磨機控制儀採用了單片機系統, mcu採用ds80c320高速處理器,採用max180作為md換器,低通濾波器為max293 , f v換電路利用lm331 ,可控硅相觸發電路使用tca785 , rs232通信介面晶元採用max202 , mcu監控電路為max705 ,系統使用開關電源供電。
  7. The practical situations of system operations are considered in this paper. based on the enumeration of the cut sets for the load point interruption, load transition character, maintenance of devices, active failure mode and overload of transmission line are all discussed

    該方法考慮了系統運行的實際情況,列舉引起點停電事件割集,還考慮了點供電的特性,網路元件的計劃檢修和主動性故障使評估過程更加合理和有效。
  8. This thesis discussed the affection of all kinds of components contingency and the components " position in the line and other factors on the evaluation of load point reliability index. this thesis adopts a integrative method to deal with simple or complex distribution network with the system ' s practical operation characteristics and the results of the example reveal that it is feasible. the key to study the economics of power system reliability is outage costs

    在定量評估點或系統可靠性指標的研究中,本文較全面地分析了各元件故障和元件在線路中的位置以及計劃檢修、臨時停電、天氣因素、負荷轉移等因素對估算點可靠性指標的影響;研究了現有的可靠性評估模型,結合城市電網的實際運行特點,採用一種綜合的方法估算輻射型電網的可靠性指標,算例結果表明它是有效可行的。
  9. So when the underfloor air supply system is been used in engineering, different supply air speed will be adopted on the basis of different heat intensity of upside and low side of room. so to economize energy

    所以工程上採用地板送風時,應根據房間上下部熱源強度的不同,採用不同的送風速度,從而減少對流熱,在工程上達到最大的節能。
  10. The feeder automation technology which based on the feeder terminal unit ( ftu ) is a key technology and the core content of distribution network automatization, and it realizes all the distribution network real - time monitoring by ftu, communication network and coordinated operation of power distribution automatization master station system. when the breakdown occurs, it can rapidly carry on the breakdown localization, and realize the failure isolation and the load shift with the master station system participation, thus it completes the network reconstruction

    基於饋線終端單元( ftu )的饋線自動化技術是配電自動化的一項關鍵技術和核心內容,通過ftu 、通信網路和配電自動化主站系統的協調運行實現對整個配電網的實時監控,當故障發生時,能夠迅速進行故障檢測、定位,並在主站系統的參與下實現故障隔離及負荷轉移,從而完成網路重構。
  11. The distribution gis data management methods and its application in distribution running are systematically researched, which compose distribution gis network topology analysis ( nta ) and optimal rush - maintain path ( orp ), and distribution planning, which composes distribution spatial load forecasting ( slf ) : ( 1 ) with systematic analysis on the relationship between spatial data model and spatial data structure, the distribution feature and the two common gis data models are analyzed, which are vector and raster data models. then the conceptual and logic data models of distribution gis are designed. the spatial data storage structure is given by using vector method, and their detailed data management methods are proposed

    ( 4 )將gis的空間信息分析功能應用於配網空間預測( saptialloadforecasting , slf )的研究:綜合利用灰色理論及遺傳規劃的優點,提出了一種根據饋線的歷史峰值進行外推的組合slf法:首先採用負荷轉移耦合法來修正歷史,消除由於負荷轉移引起的誤差;然後根據實際饋線路徑和配網gis圖形分層,運用圖層疊加分析得到饋線的實際供電范圍;接著採用灰色關聯度聚類方法對饋線增長曲線進行聚類分析;最後採用遺傳規劃來對灰色聚類結果進行符號回歸,分別得到每一類曲線的最佳擬合曲線形式。
  12. Abstract : through the analysis of the coordination characteristics between the switch and the fuses in combination, it is shown that the transfer current of combination can be decreased by reducing the prearcing time of fuses in the range of transfer current or by increasing the fuse - initiated opening time ( t0 ) of the switch. the ways to decrease the transfer current for present combinations are put forward

    文摘:本文通過對組合電器中開關與熔斷器之間的配合特性分析,認為減小熔斷器在電流區域內的弧前時間或適當增加熔斷器觸發的開關分閘時間t0 ,均可降低組合電器所需開斷的電流值,並針對現有組合電器提出了減小電流的具體方案。
  13. The paper attempt to applied sequential cluster method to set up the classification standard, then it regards the correlation coefficients of record values as weights and predicts the future loads by using markov chain model with weights. this method make the best of the information comprised in load series and solved the problem of obtaining weather information. not only the concrete value of the monthly sales electric energy but its range in the future is gained

    實際上,各月份的氣象、經濟因素之間具有一定的相關性,這些相關信息已經包含在序列中,本文嘗試將馬爾可夫鏈理論應用於預測之中,應用聚類分析的方法確定分級標準,將分為不同的狀態,根據狀態之間的概率來推測未來的發展變化,並將觀測值之間的相關系數作為權值進行綜合預測,更加合理地利用了序列中包含的信息,不僅可以預測出未來的具體值,而且得到了其所屬的區間,具有一定的實用價值。
  14. The practical situations of system operations are considered in this paper. based on the enumeration of the cut sets for the load point interruption, load transition character, maintenance of devices, active failure mode and overload of transmission line are all discussed. the evaluation is more realistic and effective

    該方法充分考慮了系統運行的實際情況,在列舉引起點供電停止事件割集的基礎上還考慮了點供電的特性,網路元件的計劃檢修和活動性故障,以及系統運行的過約束等諸多情況,使評估過程更加合理和有效。
  15. This tutorial examines a custom, dynamic implementation of java network launch protocol jnlp to shift some of the server s processing load to the client

    本教程分析了java網路加載協議( java network launch protocol , jnlp )的一個定製的、動態的實現,它將一些服務器處理負荷轉移到了客戶機上。
  16. The sequence to solve a overcurrent line of a feeder is : load transference to another feeder, reduction the reactive power and finally increase the section of the cable

    規劃一個饋線線路(設備)的一條過流主幹路的順序是:了解負荷轉移至另一個饋線線路(設備)過程中,將無功功率降低最終就要增加電纜。
  17. The cold storage technology of air conditioning has become an important measure used to adjust loads and save electricity as the result of transforming a part of high loads in the day to low loads in the night

    空調蓄冷技術能夠將日間部分高峰用電負荷轉移到夜間時段,因而成為我國當前積極推廣和利用的一項利國利民的調節電措施。
分享友人